Prepare necessary documentation for various environmental compliance needs |
B: 165. Prepare necessary documentation for various environmental compliance needs |
|
02/28/2011 |
11/30/2010 |
Timely FY11 package, accrual estimate, accurate invoices |
C: 119. Project Management and Administration |
|
03/31/2011 |
03/31/2011 |
Conduct two appraisals |
D: 172. Appraisal and review appraisal for 2 parcels |
|
12/31/2010 |
12/31/2010 |
Designs and Specifications for Haul Road Project |
E: 175. Designs, Specifications, and Construction Oversight for Haul Road Project |
|
03/31/2011 |
03/31/2011 |
Designs and Specifications for Upper Klickitat Phase 2 |
F: 175. Designs, Specifications, and Construction Oversight for Upper Klickitat Project Phases 2 |
|
03/31/2011 |
01/03/2011 |
Designs and Specifications for Tepee Creek Meadows - Phase 2 |
H: 175. Design and Specifications for Tepee Creek Meadows project (Phase 2) |
|
03/31/2011 |
12/15/2010 |
Designs and Specifications for Lower White Creek Project |
I: 175. Design and Construction Oversight for Lower White Creek project - RESCHEDULED |
|
03/31/2011 |
03/31/2011 |
Attend Technical Meetings |
J: 122. Assist Planning Activities - Technical Review |
|
03/31/2011 |
03/31/2011 |
Streamflow monitoring data for 14 sites |
K: 157. Streamflow monitoring |
|
03/31/2011 |
03/31/2011 |
Assist data and quality control to basin-wide status and trend monitoring |
L: 157. Basin-wide Status and Trend Monitoring |
|
03/31/2011 |
03/31/2011 |
Effectiveness monitoring data |
M: 157. Habitat Assessment and Monitoring |
|
03/31/2011 |
03/23/2011 |
Summary of continuous stage information |
N: 157. Collect water surface elevation data |
|
03/31/2011 |
03/31/2011 |
Map of residual pool and LWD distribution |
O: 157. Map refugia in White Creek |
|
03/31/2011 |
01/28/2011 |
Turbidity, temperature and stage data for Big Muddy Creek and Klickitat River sites |
P: 157. Measure turbidity timing and duration associated with Big Muddy Creek |
|
03/31/2011 |
03/31/2011 |
Disseminate Results of Recent Restoration in Tepee Creek |
Q: 161. Disseminate Klickitat habitat and project information |
|
03/28/2011 |
03/31/2011 |
Physical Habitat Data Analysis |
R: 162. Summarize monitoring data |
|
03/31/2011 |
03/31/2011 |
Database Management and Development (multiple databases) |
S: 160. Database Management and Development |
|
03/31/2011 |
03/31/2011 |
Invasive weed control on 28.75 acres |
T: 53. Invasive weed control - Non-chemical |
|
09/30/2010 |
10/30/2009 |
Manage Native Nursery |
U: 47. Manage Native Nursery |
|
03/31/2011 |
03/31/2011 |
Revegetate 9 acres |
V: 47. Revegetate project Upper Klickitat River Phase 2 |
|
03/31/2011 |
03/31/2011 |
Revegetate 2 acres |
W: 47. Revegetate Tepee Creek/IXL Meadows project site |
|
03/31/2011 |
11/10/2009 |
Revegetate 0.5 acres |
X: 47. Revegetate White Creek/IXL project site |
|
03/31/2011 |
11/10/2009 |
Revegetate 4.0 acres |
Y: 47. Revegetate Haul Road project site |
|
03/31/2011 |
03/31/2011 |
Outreach to Local Schools and Professional Societies |
Z: 99. Project Outreach |
|
03/31/2011 |
02/03/2011 |
Coordinate and Manage Cooperating Projects/Grants |
AA: 191. Coordinate and Manage Cooperating Projects/Grants |
|
03/31/2011 |
03/31/2011 |
Annual report for 2009 attached in Pisces |
AB: 132. Submit Annual Report for the period 1/1/2009 to 12/31/2009 |
|
03/31/2011 |
|
39 LWD jams constructed along 2.3.miles of the Klickitat River |
AE: 29. Construct LWD Jams for Upper Klickitat (Phase 2) |
|
12/17/2010 |
12/17/2010 |
Designs and Specifications for Dead Canyon Creek Railroad Restoration |
AF: 175. Design and Construction Oversight for Dead Canyon embankment restoration project |
|
09/30/2010 |
09/30/2010 |
Restore floodplain and hillslope connectivity along 500' of valley bottom |
AG: 180. Restore valley connectivity along mainstem Klickitat River - Haul Road Project |
|
03/31/2011 |
11/30/2010 |