Prepare necessary documentation for various environmental compliance needs |
B: 165. Prepare necessary documentation for various environmental compliance needs |
|
08/15/2012 |
09/30/2012 |
Timely FY13 and FY14 SOW package, accrual estimate, accurate invoices |
C: 119. Project Management and Administration |
|
03/31/2013 |
03/31/2013 |
Design, Specifications, Construction Oversight and EC for Upper Klickitat (Phase 3) |
D: 175. Design, Specifications and Construction Oversight for Upper Klickitat Phase 3 |
|
03/31/2013 |
12/21/2012 |
Purchase Bridge |
E: 30. Cost-share on bridge purchase for Upper Klickitat Phase 3 |
|
09/15/2011 |
09/15/2011 |
Design, Specifications, Construction Oversight and EC for Upper Klickitat (Phase 4) |
F: 175. Design, Specifications, and Construction Oversight for Upper Klickitat Project (Phase 4) |
|
03/31/2013 |
|
Construction oversight and EC for Tepee Creek Meadows - Phase 2 |
G: 175. Construction Oversight for Tepee Creek Meadows project (Phase 2) |
|
12/14/2012 |
11/30/2012 |
Design, Specifications, Construction oversight and EC for Haul Road Phase 3 (Klickitat RM 18-32) |
H: 175. Design, Specifications, and Construction Oversight for Haul Road Phase 3 Project |
|
03/31/2013 |
11/02/2012 |
Produce 30% design and specifications for Tepee Creek Phase 3 |
I: 175. Design and specifications for Tepee Creek Phase 3 |
|
03/31/2013 |
|
LWD placed in White Creek (RM 3.3 - 5.0) |
J: 29. Place LWD in lower White Creek |
|
03/31/2013 |
|
0 LWD jams constructed along .70 miles of the Klickitat River |
K: 29. Construct LWD jams for Upper Klickitat Phase 2 |
|
03/30/2013 |
|
Assessment, inventory, and ecological prioritization for 31 miles of the Klickitat Trail |
L: 115. Klickitat Trail Inventory, Assessment, and Ecological Priortization of Restoration Sites |
|
03/31/2013 |
|
Conduct one appraisal |
M: 172. Acquire and review appraisal for one parcel |
|
03/31/2013 |
|
Attend Technical Meetings |
N: 122. Assist Planning Activities - Technical Review |
|
03/31/2013 |
03/31/2013 |
Streamflow monitoring data for 14 sites |
O: 157. Streamflow monitoring |
|
03/31/2013 |
03/31/2013 |
Effectiveness monitoring data |
P: 157. Habitat Enhancement Project Monitoring |
|
03/31/2013 |
03/31/2013 |
Habitat Assessment |
Q: 157. Habitat Assessment |
|
04/01/2012 |
01/10/2012 |
Summary of continuous stage information |
R: 157. Collect water surface elevation data |
|
03/31/2013 |
03/31/2013 |
Turbidity, temperature and stage data for Big Muddy Creek and Klickitat River sites |
S: 157. Measure turbidity timing and duration associated with Big Muddy Creek |
|
03/31/2013 |
03/31/2013 |
Conduct Food Web Study on Tepee and White Creeks (Effectiveness Monitoring) |
T: 157. Conduct Food Web Study on Tepee and White Creeks (Effectiveness Monitoring) |
|
05/15/2012 |
02/15/2012 |
Collect topographic data via LiDAR for a section of Klickitat River valley bottom |
U: 157. Collect topographic data for approx. 20 miles of Klickitat River valley bottom |
|
03/31/2013 |
03/31/2013 |
Inventory and Evaluate Potential Debris Flow Deposits along Mainstem Klickitat River. |
V: 157. Inventory and Evaluate Historic Debris Flows |
|
03/31/2013 |
|
Disseminate Results of a KWEP implemented restoration project |
W: 161. Disseminate Klickitat habitat and project information |
|
03/31/2013 |
03/31/2013 |
Physical Habitat Data Analysis |
X: 162. Summarize monitoring data |
|
03/31/2013 |
03/31/2013 |
Database Management and Development (multiple databases) |
Y: 160. Database Management and Development |
|
03/31/2013 |
03/31/2013 |
Invasive weed control on 57.25 acres |
Z: 53. Invasive weed control |
|
03/31/2013 |
09/30/2012 |
Manage Native Nursery |
AA: 47. Manage Native Nursery |
|
11/30/2012 |
11/30/2012 |
Revegetate 7 acres |
AB: 47. Revegetate project Upper Klickitat River Phase 3 & 4 sites |
|
03/31/2013 |
|
Revegetate 15 acres |
AC: 47. Revegetate Tepee Creek Phase 2 project site |
|
12/15/2012 |
12/01/2012 |
Revegetate 4.0 acres |
AD: 47. Revegetate Haul Road project site |
|
03/31/2013 |
03/31/2013 |
Outreach to Professional Societies |
AE: 99. Project Outreach |
|
01/31/2013 |
01/31/2013 |
Coordinate and Manage Cooperating Projects/Grants |
AF: 191. Coordinate and Manage Cooperating Projects/Grants |
|
03/31/2013 |
03/31/2013 |
Annual report for 2009 attached in Pisces |
AG: 132. Submit Annual Report for the period 1/1/2009 to 12/31/2009 |
|
03/30/2012 |
03/06/2012 |
Annual report for 2010 attached in Pisces |
AH: 132. Submit Annual Report for the period 1/1/2010 to 12/31/2010 |
|
01/31/2013 |
|
Annual report for 2011 attached in Pisces |
AI: 132. Submit Annual Report for the period 1/1/2011 to 12/31/2011 |
|
03/31/2013 |
|
Attach Progress Report in Pisces |
AJ: 132. Submit Progress Report for the period 1/1/2012 to 12/31/2012 |
|
03/31/2013 |
|
Place floodplain roughness elements - Haul Road Phase 3 |
AK: 29. Place floodplain roughness elements - Haul Road Phase 3 |
|
10/30/2012 |
10/30/2012 |