All applicable EC documents |
A: 165. NEPA and ESA documents, & other cultural or environmental clearance |
|
02/02/2010 |
02/28/2009 |
Database of catches of native trout |
B: 157. Quantify relative abundance of bull trout and westslope cutthroat trout |
|
09/01/2010 |
06/30/2010 |
Analysis of trends in abundance of native fish in Flathead Lake |
C: 162. Analyze trends in catch rate for WE B |
|
09/15/2010 |
06/30/2010 |
Database of Flathead Lake creel survey results |
D: 157. Quantify Flathead lake fishery |
|
09/30/2010 |
09/30/2010 |
Average catch rates, total annual harvest and pressure for the Flathead Lake fishery. |
E: 162. Analyze trends in data collected under WE D |
|
09/28/2010 |
09/28/2010 |
Results of analysis of trends in six measures of lake trout population dynamics |
F: 162. Analyze biological parameters of lake trout |
|
09/28/2010 |
09/28/2010 |
Data set of angler reports and fish shocking results |
G: 157. Monitor success of fish planting program |
|
09/28/2010 |
09/28/2010 |
Report quantifying success of planting program |
H: 162. Analyze monitoring data from WE G and draw conclusions |
|
09/28/2010 |
09/28/2010 |
Database of erosion rates and evaluation of erosion control techniques |
I: 157. Research shoreline erosion processes and restoration results |
|
09/28/2010 |
09/28/2010 |
Report of monitoring results of lakeshore erosion rates |
J: 162. Analyze results of research under WE I and success of restoration projects |
|
09/28/2010 |
09/28/2010 |
Population estimate of lake trout in Flathead Lake |
K: 158. Conduct mark/recapture field procedure |
|
07/30/2010 |
06/30/2010 |
A population estimate of lake trout in Flathead Lake |
L: 162. Generate lake trout population estimate |
|
06/01/2010 |
06/01/2010 |
Summary of analysis and associated recommendations |
M: 162. Analyze results of genetic survey of Jocko River |
|
09/28/2010 |
09/28/2010 |
Annual summary of broadcasts and effectiveness monitoring |
N: 188. Operate radio advisory broadcast re. nonnative invasive species |
|
09/28/2010 |
09/28/2010 |
Removal by netting of a pre-determined quantity of lake trout from Flathead Lake |
O: 190. Conduct experimental control-netting of lake trout |
|
12/18/2009 |
12/18/2009 |
Up to 18 miles of road removed in Camas and Mill Creek drainages |
P: 33. Timber road removal in Camas and Mill watersheds |
|
08/28/2010 |
08/28/2010 |
A guide to conservation and restoration strategies for westslope cutthroat trout |
Q: 157. Determine the genetic status of westslope cutthroat trout on the Flathead Indian Reservation |
|
09/30/2010 |
09/30/2010 |
Final design and construction of Magpie Creek fish passage barrier |
R: 190. Construct passage barrier in Magpie Creek |
|
09/28/2010 |
|
A restored reach (12,700') of Jocko River channel and floodplain |
S: 30. Restore a segment of the Jocko River and floodplain |
|
09/28/2010 |
|
1.9 miles of fence on Otopaulik property on Mission Creek |
T: 40. Fence Otopaulik acquisition |
|
06/11/2010 |
06/29/2010 |
1.4 miles of fence protecting the Jocko River floodplain |
U: 40. Fence Hatier property |
|
09/28/2010 |
06/23/2010 |
One mile of riparian fence to exclude cattle from Big Meadow. |
V: 40. Fence Big Meadow to restore Ronan Creek |
|
08/28/2010 |
|
A natural step-pool fish ladder and trapping facility |
W: 184. Install natural step-pool fish ladder at K canal |
|
09/15/2010 |
|
Publication on lake trout growth rates |
X: 183. Publish lake trout growth rates article |
|
09/28/2010 |
|
A programmatic plan to treat 15 creeks with piscicide |
Y: 174. Write a plan to treat 15 creeks with piscicide |
|
07/28/2010 |
|
Removal of brook trout from Skidoo Creek |
Z: 190. Remove brook trout from Skidoo Creek |
|
09/28/2010 |
|
List of projects for FY2010 |
AA: 114. Identify problems and coordinate solutions |
|
09/28/2010 |
09/28/2010 |
Coordination meetings and new project/cost share opportunities |
AB: 189. New and ongoing coordination activities |
|
09/28/2010 |
09/28/2010 |
Appraisal reports, NEPA documents, surveys, and title reports |
AC: 172. Work with project 200200300 on acquisitions & easements |
|
09/30/2010 |
09/30/2010 |
Funding Package - Submit draft to COTR |
AD: 119. Manage current and future projects |
|
10/01/2009 |
10/01/2009 |
Attach Progress Report in Pisces |
AE: 132. Submit Progress Report for the period (Jan 2007) to (Dec 2007) |
|
06/05/2010 |
06/05/2010 |
Annual report. |
AF: 132. Annual Report of Completion of WE's 10/1/07 to 9/30/08 |
|
03/01/2010 |
03/01/2010 |