All applicable EC documents |
B: 165. NEPA and ESA documents, & other cultural or environmental clearance |
|
09/30/2011 |
06/30/2011 |
Database of catches of native trout |
C: 157. Quantify relative abundance of bull trout and westslope cutthroat trout |
|
09/01/2011 |
06/30/2011 |
Analysis of trends in abundance of native fish in Flathead Lake |
D: 162. Analyze trends in catch rate for WE C |
|
08/15/2011 |
06/30/2011 |
Database of Flathead Lake creel survey results |
E: 157. Quantify Flathead lake fishery |
|
09/30/2011 |
06/30/2011 |
Average catch rates, total annual harvest and pressure for the Flathead Lake fishery. |
F: 162. Analyze trends in data collected under WE E |
|
09/28/2011 |
06/30/2011 |
Results of analysis of trends in six measures of lake trout population dynamics |
G: 162. Analyze biological parameters of lake trout |
|
09/28/2011 |
06/30/2011 |
Data set of angler reports and fish shocking results |
H: 157. Monitor success of fish planting program |
|
09/28/2011 |
06/30/2011 |
Report quantifying success of planting program |
I: 162. Analyze monitoring data from WE H and draw conclusions |
|
09/28/2011 |
06/30/2011 |
Database of erosion rates and evaluation of erosion control techniques |
J: 157. Research shoreline erosion processes and restoration results |
|
09/28/2011 |
09/28/2011 |
Report of monitoring results of lakeshore erosion rates |
K: 162. Analyze results of research under WE J and success of restoration projects |
|
09/28/2011 |
09/28/2011 |
Population estimate of lake trout in Flathead Lake |
L: 158. Conduct mark/recapture field procedure |
|
07/30/2011 |
07/30/2011 |
A population estimate of lake trout in Flathead Lake |
M: 162. Generate lake trout population estimate |
|
06/01/2011 |
06/01/2011 |
Angler-generated harvest of 40,000 to 70,000 lake trout |
N: 190. Implement angler incentives to cost-effectively remove lake trout from Flathead Lake |
|
05/30/2011 |
05/30/2011 |
Summary of analysis and associated recommendations |
O: 162. Analyze results of genetic survey of Jocko River |
|
09/28/2011 |
09/28/2011 |
Annual summary of broadcasts and effectiveness monitoring |
P: 188. Operate radio advisory broadcast re. nonnative invasive species |
|
09/28/2011 |
09/28/2011 |
Up to 18 miles of road removed in Camas and Mill Creek drainages |
Q: 33. Timber road removal in Camas and Mill watersheds |
|
08/28/2011 |
|
A guide to conservation and restoration strategies for westslope cutthroat trout |
R: 157. Determine the genetic status of westslope cutthroat trout on the Flathead Indian Reservation |
|
09/30/2011 |
09/30/2011 |
Final design and construction of Magpie Creek fish passage barrier |
S: 190. Construct passage barrier in Magpie and Seepay Creeks |
|
09/28/2011 |
09/30/2011 |
A restored reach (12,700') of Jocko River channel and floodplain |
T: 30. Restore a segment of the Jocko River and floodplain |
|
09/28/2011 |
|
3,500 ft of fence on Firestone property on Mission Creek |
U: 40. Fence Firestone acquisition |
|
07/29/2011 |
|
2500 ft of fence protecting the Jocko River floodplain |
V: 40. Fence Schall property |
|
08/29/2011 |
|
2000 ft of fence protecting the Jocko River floodplain |
W: 40. Fence Pitts property |
|
08/29/2011 |
06/30/2011 |
2000 ft of fence protecting the Jocko River floodplain |
X: 40. Fence Fyant property |
|
08/29/2011 |
08/29/2011 |
4000 ft of fence protecting the Jocko River floodplain |
Y: 40. Fence Scott property |
|
08/29/2011 |
08/29/2011 |
1200 ft of fence protecting the Jocko River floodplain |
Z: 40. Fence Mays property |
|
08/29/2011 |
08/29/2011 |
One mile of riparian fence to exclude cattle from Big Meadow. |
AA: 40. Fence Big Meadow to restore Ronan Creek |
|
08/28/2011 |
08/28/2011 |
Remove structures and debris from newly acquired properties |
AB: 27. Remove structures and debris from newly acquired properties |
|
06/14/2011 |
06/28/2011 |
Weed management on 322 acres of acquired lands |
AC: 22. Manage weed infestations on acquired properties |
|
09/30/2011 |
09/30/2011 |
Publication on lake trout growth rates |
AD: 183. Publish lake trout growth rates article |
|
09/28/2011 |
|
A programmatic plan to treat 15 creeks with piscicide |
AE: 174. Write a plan to treat 15 creeks with piscicide |
|
07/28/2011 |
|
List of projects for FY2010 |
AF: 114. Identify problems and coordinate solutions |
|
09/28/2011 |
09/28/2011 |
Coordination meetings and new project/cost share opportunities |
AG: 189. New and ongoing coordination activities |
|
09/28/2011 |
09/28/2011 |
Appraisal reports, NEPA documents, surveys, and title reports |
AH: 172. Work with project 200200300 on acquisitions & easements |
|
09/30/2011 |
09/30/2011 |
Funding Package - Submit draft to COTR |
AI: 119. Manage current and future projects |
|
09/29/2011 |
09/29/2011 |
Attach Progress Report in Pisces |
AJ: 132. Annual Report of Completion of WE's 10/1/09 to 9/30/10 |
|
04/18/2011 |
04/18/2011 |