All applicable EC documents |
B: 165. NEPA and ESA documents, & other cultural or environmental clearance |
|
09/30/2012 |
09/30/2012 |
Database of Flathead Lake and river creel survey results |
C: 157. Quantify Flathead lake and river fishery |
|
09/30/2012 |
09/30/2012 |
Average catch rates, total annual harvest and pressure for the Flathead Lake fishery. |
D: 162. Analyze trends in data collected under WE E |
|
09/28/2012 |
09/28/2012 |
Results of analysis of trends in six measures of lake trout population dynamics |
E: 162. Analyze biological parameters of lake trout |
|
09/28/2012 |
09/28/2012 |
Data set of angler reports and fish shocking results |
F: 157. Monitor success of fish planting program |
|
09/28/2012 |
09/28/2012 |
Report quantifying success of planting program |
G: 162. Analyze monitoring data from WE H and draw conclusions |
|
09/28/2012 |
09/28/2012 |
Database of erosion rates and evaluation of erosion control techniques |
H: 157. Research shoreline erosion processes and restoration results |
|
09/28/2012 |
09/28/2012 |
Report of monitoring results of lakeshore erosion rates |
I: 162. Analyze results of research under WE J and success of restoration projects |
|
09/28/2012 |
09/28/2012 |
Population estimate of lake trout in Flathead Lake |
J: 158. Conduct mark/recapture field procedure |
|
07/30/2012 |
07/30/2012 |
A population estimate of lake trout in Flathead Lake |
K: 162. Generate lake trout population estimate |
|
06/01/2012 |
06/01/2012 |
Up to 5 miles of road removed in Camas, DAyton and Mill Creek drainages |
L: 33. Timber road and culvert removal in Camas, Mill, and Dayton watersheds |
|
08/28/2012 |
08/28/2012 |
A Reservation-wide data set of westslope trout genetic status |
M: 157. Determine the genetic status of westslope cutthroat trout on the Flathead Indian Reservation |
|
09/30/2012 |
09/30/2012 |
A determination of population viability and population-specific management recommendations. |
N: 162. Analyze genetics data from isolated streams in WE M |
|
09/28/2012 |
09/28/2012 |
Construction of Magpie Creek fish passage barrier |
O: 190. Construct passage barrier in Magpie Creek |
|
09/28/2012 |
|
Restoration of about 2,000 ft of Ronan Creek |
P: 30. Restore the segment of Ronan Creek through Big Meadow |
|
09/29/2012 |
|
A restored reach (1,500') of Jocko River channel and floodplain |
Q: 30. Restore a segment of the Jocko River and floodplain |
|
09/28/2012 |
|
2500 ft of fence protecting the Jocko River floodplain |
R: 40. Fence Schall property |
|
08/29/2012 |
09/21/2012 |
3,200 feet of protective fencing along the Jocko River |
S: 40. Fence Meyer property |
|
09/28/2012 |
|
3,500 feet of protective fencing along the Jocko River |
T: 40. Fence Firestone property |
|
09/03/2012 |
|
Remove structures and debris from newly acquired properties |
U: 27. Remove structures and debris from newly acquired properties |
|
06/14/2012 |
06/14/2012 |
Land management plans for newly acquired properties |
V: 193. Produce land management plans on newly acquired properties |
|
09/28/2012 |
09/28/2012 |
Weed management on 350 acres of acquired lands |
W: 197. Manage weed infestations on acquired properties |
|
09/30/2012 |
09/30/2012 |
Coordination meetings and new project/cost share opportunities |
X: 191. New and ongoing coordination activities |
|
09/28/2012 |
09/28/2012 |
List of projects for FY2011 |
Y: 114. Identify problems and coordinate solutions |
|
09/28/2012 |
09/28/2012 |
Appraisal reports, NEPA documents, surveys, and title reports |
Z: 172. Work with project 200200300 on acquisitions & easements |
|
09/30/2012 |
09/30/2012 |
Funding Package - Submit draft to COTR |
AA: 119. Manage current and future projects |
|
05/28/2012 |
05/28/2012 |
Attach Progress Report in Pisces |
AB: 132. Annual Report of Completion of WE's 10/1/10 to 9/30/11 |
|
09/28/2012 |
|