All applicable EC documents |
B: 165. NEPA and ESA documents, & other cultural or environmental clearance |
|
09/30/2013 |
09/30/2013 |
Database of Flathead Lake and river creel survey results |
C: 157. Quantify Flathead lake and river fishery |
|
09/30/2013 |
09/30/2013 |
Average catch rates, total annual harvest and pressure for the Flathead Lake fishery. |
D: 162. Analyze trends in data collected for Flathead fishery |
|
09/28/2013 |
09/28/2013 |
Results of analysis of trends in six measures of lake trout population dynamics |
E: 162. Analyze biological parameters of lake trout |
|
09/28/2013 |
09/28/2013 |
Data set of angler reports and fish shocking results |
F: 157. Monitor success of fish planting program |
|
09/28/2013 |
09/28/2013 |
Report quantifying success of planting program |
G: 162. Analyze monitoring data from fish planting and draw conclusions |
|
09/28/2013 |
09/28/2013 |
Database of erosion rates and evaluation of erosion control techniques |
H: 157. Research shoreline erosion processes and restoration results |
|
09/28/2013 |
09/28/2013 |
Report of monitoring results of lakeshore erosion rates |
I: 162. Analyze results of shoreline erosion research and success of restoration projects |
|
09/28/2013 |
09/28/2013 |
Two population estimates per year of lake trout in Flathead Lake |
J: 158. Conduct mark/recapture field procedure |
|
07/30/2013 |
07/30/2013 |
Two population estimates of lake trout in Flathead Lake |
K: 162. Generate lake trout population estimate |
|
06/01/2013 |
06/01/2013 |
Up to 5 miles of road removed in Camas, Dayton, Hot Springs and Mill Creek drainages |
L: 33. Timber road and culvert removal in Camas, Mill, and Dayton watersheds |
|
08/28/2013 |
08/28/2013 |
A Reservation-wide data set of westslope trout genetic status |
M: 157. Determine the genetic status of westslope cutthroat trout on the Flathead Reservation |
|
09/30/2013 |
09/30/2013 |
A determination of population viability and population-specific management recommendations. |
N: 162. Analyze genetics data of westslope cutthroat on Flathead Reservation |
|
09/28/2013 |
09/28/2013 |
Construction of Magpie Creek fish passage barrier |
O: 190. Construct passage barrier in Magpie Creek |
|
09/28/2013 |
09/28/2013 |
up to 4,500 feet of protective fencing |
Q: 40. Fence newly acquired properties |
|
09/03/2013 |
|
Remove structures and debris from newly acquired properties |
R: 27. Remove structures and debris from newly acquired properties |
|
08/13/2013 |
08/13/2013 |
Land management plans for newly acquired properties |
S: 193. Produce land management plans on newly acquired properties |
|
08/01/2013 |
09/27/2013 |
Weed management on 540 acres of acquired lands |
T: 197. Manage weed infestations on acquired properties |
|
09/30/2013 |
09/30/2013 |
Coordination meetings and new project/cost share opportunities |
U: 191. New and ongoing coordination activities |
|
09/30/2013 |
09/30/2013 |
List of projects for FY2013 |
V: 114. Identify problems and coordinate solutions |
|
09/28/2013 |
09/28/2013 |
Appraisal reports, NEPA documents, surveys, and title reports |
W: 172. Work with project 200200300 on acquisitions & easements |
|
09/30/2013 |
09/30/2013 |
Funding Package - Submit draft to COTR |
X: 119. Manage current and future projects |
|
08/01/2013 |
08/01/2013 |
Attach Progress Report in Pisces |
Y: 132. Annual Report of Completion of WE's 10/1/11 to 9/30/12 |
|
09/02/2013 |
|
Joint fish-stocking plan with MFWP and USFWS |
Z: 174. Jointly develop stocking plan with USFWS and MFWP |
|
09/27/2013 |
|
Removal of 15,000 lake trout from Flathead Lake by incentivized angling |
AB: 190. Remove lake trout from Flathead Lake by fishing events |
|
05/27/2013 |
05/27/2013 |
Construction of a 200 ft long public fishing pier on Flathead Lake |
AC: 188. Build fishing pier at Salish Point on Flathead Lake |
|
09/02/2013 |
09/02/2013 |
Attach Progress Report in Pisces |
AD: 132. Annual Report of Completion of WE's 10/1/10 to 9/30/11 |
|
02/28/2013 |
02/28/2013 |