Contract 45892: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
45892
Contract Title:
2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Continuation:
Previous: Next:
40747: 2002-059-00 EXP YANKEE FORK SALMON R. DREDGE TAILINGS RESTORATION
  • 51571: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Status:
Closed
Contract Description:
A draft implementation plan for the Yankee Fork Restoration Project (YFRP) was submitted summer 2008 to the Northwest Power Planning Council and distributed to the Independent Scientific Review Panel (ISRP).  The ISRP review found that the plan does not meet scientific criteria and cited three major areas of critical deficiency in the Yankee Fork Restoration Project implementation plan.  These deficiencies are missing proposal components: fish population and habitat studies; establish and justify quantitative biological objectives; outline Monitoring and Evaluation; and to address mercury and selenium contamination within the Yankee Fork system; resolution of land access and a conservation easement.  

The project will fund a Yankee Fork Tributary Assessment to fill the habitat data gaps identified by ISRP. The Tributary assessment will incorporate all data pertaining Yankee Fork: reports, photos, etc, to guide the prioritization of restoration reaches. Funding is set aside to help the completion and if there are additional studies needed, the YFRP will participate in cost sharing. When the tributary assessment is complete, it will aid in the guidance of the final Yankee Fork implementation plan that will be submitted to the ISRP and Northwest Power Planning Council.

The Yankee Fork Restoration Project contract for 2010 will continue to collect water quality information on the Yankee Fork Salmon River; data collection will be used as baseline data prior to restoration of the dredge tailings. This includes using the Booms and sondes off of the three bridges, Flat Rock, Bonanza and Jordan Creek to collect continuous water quality: ph, conductivity, temperature, turbidity, and dissolved oxygen. New for the this year will be to collect water quality from Rankin Creek, West Fork Yankee Fork and upper Yankee Fork using sondes, the sampling logistics are part of the planning phase first of the year.  This data collection begins March and goes through November, and is dependent upon the stream conditions base flows, run-off, and storm events.  Temperature data will continue to be collected on the YF and references reaches within the Upper Salmon River Basin.  The project installs thermal data loggers beginning in April and retrieving them in November. Additionally, the project will continue to collect discharges measurements, stage readings (manually and digitally--with pressure transducers).  The pressure transducers will gather continuous water levels throughout the field season. There will be additional installation of these devices on West Fork Yankee Fork, Jordan Creek, Rankin Creek, Upper YF and mouth of YF with the continued monitoring from Pole Camp Campground.

The new additions for this contract year are: completing a water quality report for 2006-2009; disseminating the data to BPA, IDF&G, USFS; fish/habitat data base; and a habitat inventory.  There are two parts to the habitat survey:  first, the Rosgen method collecting cross section, longitudinal profiles, pebble counts, riparian vegetation, photos, discharge measurements;  second, a river metabolism study that will consist of gross primary productivity and ecosystem respiration to be completed 2010-2011. This study would identify carbon production rates and use within stream ecosystems and should provide direct estimate of the riverine food base. Because the Tribes does not have an easement with the private landowners the first year will consist of gathering reference reach inventory, if and when we acquire an access agreement we then can go into the dredge section and complete the riparian habitat survey in the second year (2011). We plan to gather other biological/habitat data by accessing the dredge sections through public accesses and stay within the legal high water mark.  

Additionally, the project will be working on a narrative to complete other restoration actions within the entire Yankee Fork Salmon River, outside the dredge sections.  We are currently working with the private landowners to acquire an agreement, but this may take some time to accomplish, therefore, we are looking to complete other implementation actions throughout the YFSR. This narrative will be viewed and approved by the ISRP before implementation.
Account Type(s):
Expense
Contract Start Date:
02/01/2010
Contract End Date:
01/31/2011
Current Contract Value:
$273,944
Expenditures:
$273,944

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor chad.colter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Evelyn Galloway Shoshone-Bannock Tribes Yes Technical Contact egalloway@sbtribes.com (208) 239-4570
Pamela Nelle Terraqua, Inc. No Interested Party pamela@terraqua.biz (509) 885-8143
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Michael Ward Terraqua, Inc. No Interested Party mike@terraqua.biz (509) 486-2426
Shannell Ward Shoshone-Bannock Tribes No Contract Manager shannell.ward@sbtribes.com (208) 478-3821
Benjamin Zelinsky Bonneville Power Administration Yes F&W Approver bdzelinsky@bpa.gov (503) 230-4737


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Written approval from BPA A: 165. Environmental compliance to install pressure transducers/monitoring equipment 08/31/2010 06/30/2010
YFSR Water Quality report B: 157. Collect water quality data 01/14/2011
annual report C: 162. water quality 01/31/2011
tabled water quality data D: 161. water quality 01/31/2011
Confirm installation E: 148. Install pressure transducers/monitoring devices 04/30/2010 04/30/2010
report tables and hydrographs (summery) within the annual report F: 162. pressure tansducers data 01/24/2011
Develop hydro-graphs G: 161. disseminate all pressure transducer data 01/17/2011
maps and tables of habitat data H: 157. Baseline habitat inventory data within YFSR and references reaches 01/01/2011
YFSR Habitat inventory report I: 162. interpret and report habitat inventory 01/17/2011
habitat site profiles J: 161. disseminate habitat inventory to interested agencies 01/31/2011
Summary of meeting notes and an access/easement agreement with Simplot K: 191. Meetings and Input from YFSR tech team and stakeholders & Access Agreement from Simplot 01/31/2011
water quality 2006-2009 report L: 141. produce water quality report 2006-2009 01/31/2011
Attach Progress Report in Pisces M: 132. Submit Progress Report for the period (Feb 2010 to Jan 2011) 01/31/2011
Provide accrual information to BPA N: 119. Routine administration of contract 07/01/2010 07/01/2010
Cultural/Historical narrative section, LiDAR, Orthoimagery, and FLIR/TIR reports for assessment P: 115. Tasks of Yankee Fork Tributary Assessment: FLIR/TIR, LIDAR and Cultural/Historical Narrative 01/15/2011 12/31/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 3 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance to install pressure transducers/monitoring equipment 01/01/2010
B 157 Collect water quality data 01/01/2010
C 162 water quality 01/01/2010
D 161 water quality 01/01/2010
E 148 Install pressure transducers/monitoring devices 05/10/2010
F 162 pressure tansducers data 01/01/2010
G 161 disseminate all pressure transducer data 01/01/2010
H 157 Baseline habitat inventory data within YFSR and references reaches 01/01/2010
I 162 interpret and report habitat inventory 01/01/2010
J 161 disseminate habitat inventory to interested agencies 01/01/2010
K 191 Meetings and Input from YFSR tech team and stakeholders & Access Agreement from Simplot 02/01/2010
L 141 produce water quality report 2006-2009 02/01/2010
M 132 Submit Progress Report for the period (Feb 2010 to Jan 2011) 02/01/2010
N 119 Routine administration of contract 01/01/2010
O 185 Periodic Status Reports for BPA 01/01/2010
P 115 Tasks of Yankee Fork Tributary Assessment: FLIR/TIR, LIDAR and Cultural/Historical Narrative 02/01/2010