Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 45995: 1991-073-00 EXP IDAHO NATURAL PRODUCTION M&E
Project Number:
Title:
Idaho Natural Production Monitoring and Evaluation (M&E)
Stage:
Closed
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
45995
Contract Title:
1991-073-00 EXP IDAHO NATURAL PRODUCTION M&E
Contract Continuation:
Previous: Next:
40873: 1991-073-00 EXP IDAHO NATURAL PRODUCTION MONIT
  • 50975: 1991-073-00 EXP IDAHO NATURAL PRODUCTION M & E
Contract Status:
History
Contract Description:
The Idaho Natural Production Monitoring & Evaluation Project (INPMEP) has been evolving in an adaptive management mode for over 20 years. It was originally established by the Northwest Power Planning Council’s 1982 Fish and Wildlife Program as project number 1983-007-00. Project goals were to monitor natural production of anadromous fish and evaluate off-site habitat mitigation projects funded by Bonneville Power Administration. The original project split into general and intensive monitoring components. General monitoring followed anadromous fish production and population trends over a broad geographic area. Intensive studies investigated life cycle survival at 2 sites to develop quantitative criteria to guide management. Both components continued through the 1990s as project number 1991-073-00. Project focus changed with the listing of Snake River spring/summer Chinook and steelhead under the Endangered Species Act. Salmon escapement declined such that survival could not be estimated with intensive studies but had to be done in aggregate. Thus, the intensive studies were expanded to a basin-wide scale and evaluation of specific mitigation projects was discontinued, while general monitoring continued as before. Changing demands for the way monitoring is practiced in the Columbia basin have prompted us to submit a proposal with a slightly changed focus. This statement of work will implement the plans put forth in that proposal as approved by the Northwest Power and Conservation Council.

Currently, INPMEP monitors trends in spring/summer Chinook salmon and steelhead trout populations in the Salmon, Clearwater, and minor middle Snake tributaries in the Idaho portion of Hells Canyon.  In 2010, we will continue to gather length, sex, and age data from naturally spawning Chinook salmon across Idaho and evaluate biases in these data. The run reconstruction analyses conducted in the past will be updated as well. We will continue to  develop a more efficient and valid study design for juvenile salmonid monitoring.

The three objectives for INPMEP from the recent past will be maintained for this contract period. The purpose of each objective involves enumerating or describing individuals within the life stages undergone by anadromous salmonids. By understanding the transitions between stages and associated controlling factors, we hope to achieve a mechanistic understanding of population dynamics.
Objective 1. Describe the 2009 adult escapement and age composition of the spawning run of naturally produced spring/summer Chinook salmon passing Lower Granite Dam.
Objective 2. Monitor the juvenile production of Chinook salmon and steelhead trout for the major population groups (MPGs) within the Clearwater and Salmon subbasins. This objective is general trend monitoring that focuses on density of juvenile salmonids at selected sampling sites. Sites will be selected based on a rotating panel design (intensive, extensive, and historical panels).
Objective 3. Evaluate the life cycle survival and the freshwater productivity/production of Snake River spring/summer Chinook salmon. There are two components: update/refine a stock-recruit model and estimate aggregate smolt-to-adult survival. This is an evaluation that puts together and interprets data generated from other objectives in a form suitable for management evaluation. The results are invaluable for assessing stock status and the impact of tributary management actions on them.

We are incorporating an additional objective into INPMEP in 2010.
Objective 4. Coordinate reporting of redd counts in Idaho to fit the population format recommended by the Interior Columbia Technical Recovery Team. This objective will make it easier to track population status for ESA reviews. Redd counts in Idaho have been funded by the Pacific Salmon Commission but there has not been dedicated, funded coordination of these data. Consequently, reporting has not been timely or in a format suitable for ESA status assessments, delaying completion recovery plans. This fourth objective addresses this regional need.

As a large-scale, long-term monitoring project, INPMEP interacts with many other projects that are concerned with natural production of salmonids in Idaho.  Over time, relationships among many parties have formed to provide technical assistance among projects, as well as to avoid unnecessary duplication of efforts. INPMEP provides technical information to IDFG fisheries managers. In addition to fulfilling the primary status monitoring functions for ESA listed Snake River spring/summer Chinook populations, INPMEP has collected essential baseline data for effectiveness monitoring of population responses to management actions with respect to aquatic resources, downstream passage issues, tributary habitat modifications, and natural/hatchery interactions. It is the umbrella for IDFGs assessment of natural production of anadromous salmonids. Related projects include ISS (conducted collaboratively by IDFG, the Nez Perce Tribe, the Shoshone-Bannock Tribes, and US Fish and Wildlife Service; projects 198909800, 198909801, 198909802, and 198909803) and ISMES (formerly Steelhead Supplementation Studies; project 199005500) take a more local, Tier 3 approach to monitoring. INPMEP complements these projects by providing a broader, Tier 1 & 2, context. These projects are mutually supporting.

Fast Track Changes (May 2010)
Add work element R: Lower Granite Dam sampling
Add new milestone to work element E
Modified budgets to E, G, I, J, O, Q
Account Type(s):
Expense
Contract Start Date:
02/01/2010
Contract End Date:
01/31/2011
Current Contract Value:
$868,450
Expenditures:
$868,450

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Permitting Complete B: 165. Project Permitting 01/31/2011 12/31/2010
Data in spreadsheet form C: 157. Collect Chinook Abundance Data from Cooperators (2009 data) 02/26/2010 02/26/2010
Estimate parr densities in snorkeled reaches D: 162. Estimate Parr Densities from Snorkel Surveys (2009 data) 07/31/2010 03/31/2010
Estimate Age at Length for Adult Chinook E: 162. Estimate Age Composition of Chinook Salmon Adults (2009 data) 07/31/2010 03/31/2010
Estimate the stock-recruitment relationship for Snake River Chinook Salmon F: 162. Produce Stock-Recruit Model for Chinook Salmon in the Snake River (2009 data) 07/31/2010 03/31/2010
Salmon River Snorkeling Surveys G: 157. General Parr Monitoring - Salmon sub-basin 09/30/2010 09/30/2010
Clearwater River Snorkeling Surveys H: 157. General Parr Monitoring - Clearwater sub-basin 09/30/2010 09/30/2010
Salmon River Chinook Age Structure Collection I: 157. Collect Age Structure Data - Salmon sub-basin 01/31/2011 09/24/2010
Clearwater River Chinook Age Structure Collection J: 157. Collect Age Structure Data - Clearwater sub-basin 01/31/2011 09/24/2010
Population-specific redd counts K: 159. Produce Population-specific Redd Counts 01/31/2011 09/17/2010
Database Maintenance Cycle L: 160. Data Management 01/31/2011 01/31/2011
Annual Queries Complete M: 159. Data Queries and Summarization 01/31/2011 01/31/2011
Technical manuscripts N: 183. Professional Publications 01/31/2011 01/31/2011
Abstracts & Presentations Complete O: 161. Professional Presentations 03/31/2010 03/31/2010
Manage Project P: 119. Annual Project Planning & Administration 01/31/2011 09/22/2010
Annual Report Complete Q: 132. Submit Progress Report for the period 2/1/2009 to 1/31/2010 11/15/2010
Age composition and genetic stock identification R: 157. Collect scale and genetic samples at Lower Granite Dam 01/31/2011 12/31/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 4 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 183 Produce Journal Article
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 3 instances of WE 162 Analyze/Interpret Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 183 Produce Journal Article
  • 3 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 02/01/2010
B 165 Project Permitting 02/01/2010
C 157 Collect Chinook Abundance Data from Cooperators (2009 data) 02/01/2010
D 162 Estimate Parr Densities from Snorkel Surveys (2009 data) 02/01/2010
E 162 Estimate Age Composition of Chinook Salmon Adults (2009 data) 07/01/2010
F 162 Produce Stock-Recruit Model for Chinook Salmon in the Snake River (2009 data) 02/01/2010
G 157 General Parr Monitoring - Salmon sub-basin 02/01/2010
H 157 General Parr Monitoring - Clearwater sub-basin 03/23/2010
I 157 Collect Age Structure Data - Salmon sub-basin 03/23/2010
J 157 Collect Age Structure Data - Clearwater sub-basin 03/23/2010
K 159 Produce Population-specific Redd Counts 02/01/2010
L 160 Data Management 02/01/2010
M 159 Data Queries and Summarization 02/01/2010
N 183 Professional Publications 02/01/2010
O 161 Professional Presentations 02/01/2010
P 119 Annual Project Planning & Administration 02/01/2010
Q 132 Submit Progress Report for the period 2/1/2009 to 1/31/2010 02/01/2010
R 157 Collect scale and genetic samples at Lower Granite Dam 04/19/2010