Province | Subbasin | % |
---|---|---|
Blue Mountain | Grande Ronde | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Obtain permits & obtain environmental compliance from BPA. | A: 165. Provide proof of all EC and permits to BPA | 05/15/2010 | 06/08/2010 | |
Coordination on Research, Monitoring and Evaluation | B: 191. Coordinate with regional agencies, tribes, and landowners | 03/31/2011 | 03/31/2011 | |
Install one stream gauging station each in the Upper Grande Ronde and Catherine Creek | C: 148. Install flow depth gauges at two channel cross-sections | 07/15/2010 | 07/15/2010 | |
2010 data collection on key fish habitat parameters. | D: 157. Collect water temperature and streamflow data | 03/31/2011 | 03/31/2011 | |
A monitoring plan for temperature, sediment and flow measures on the Grande Ronde | E: 156. Review and develop monitoring protocols and statistical designs | 03/31/2011 | 03/31/2011 | |
Habitat Variables Database | F: 160. Develop and manage fish habitat condition database | 03/31/2011 | 03/31/2011 | |
GIS Analysis on existing data layers | G: 162. Summarize preliminary findings | 03/31/2011 | 03/31/2011 | |
Presentation in AFS/JASA/FSBI | H: 161. Present findings and procedures in professional meetings | 03/31/2011 | 03/31/2011 | |
Draft paper on monitoring in the Grande Ronde basin. | I: 183. Produce journal publications on fish/habitat relationships | 03/31/2011 | 03/31/2011 | |
Successful Project Administration | J: 119. Project Administration | 02/21/2011 | 02/28/2011 | |
Attach Annual Report in Pisces for April 2010 to March 2011 | K: 132. Annual Report - April 1, 2010 to March 31, 2011 | 03/31/2011 | 03/31/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Provide proof of all EC and permits to BPA | 04/01/2010 | ||||||
B | 191 | Coordinate with regional agencies, tribes, and landowners | 04/01/2010 | ||||||
C | 148 | Install flow depth gauges at two channel cross-sections | 06/08/2010 | ||||||
D | 157 | Collect water temperature and streamflow data | 06/10/2010 | ||||||
E | 156 | Review and develop monitoring protocols and statistical designs | 04/01/2010 | ||||||
F | 160 | Develop and manage fish habitat condition database | 04/01/2010 | ||||||
G | 162 | Summarize preliminary findings | 04/01/2010 | ||||||
H | 161 | Present findings and procedures in professional meetings | 04/01/2010 | ||||||
I | 183 | Produce journal publications on fish/habitat relationships | 04/01/2010 | ||||||
J | 119 | Project Administration | 04/01/2010 | ||||||
K | 132 | Annual Report - April 1, 2010 to March 31, 2011 | 04/01/2010 | ||||||
L | 185 | Periodic Status Reports for BPA | 04/01/2010 |