Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 46876: 200600300 EXP DESERT WILDLIFE AREA O&M
Project Number:
Title:
Desert Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
46876
Contract Title:
200600300 EXP DESERT WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
40094: 200600300 EXP DESERT WILDLIFE AREA O&M
  • 51887: 2006-003-00 EXP DESERT WILDLIFE AREA O&M
Contract Status:
Closed
Contract Description:
Operate and maintain two wetland enhancement projects on the Desert Wildlife Area that have been funded, in part, by the BPA.  This contract will provide funding to operate and maintain the enhanced wetlands for one year to insure that they remain functional.  

The TD-1 enhancement project is near completion; and when operated this fall will fill 7 wetland basins by diverting surface water from the Frenchman Hills wasteway into wetland basins.  Enhancements at the TD-1 Project included: installation of 11 water control structures, construction of ditches and dikes for water management, sculpting wetland basins to optimal depth for wetland obligate birds,  armoring 400 ft of dikes to protect against beaver and burrowing mammals, seeding disturbed soil resulting from construction activities, and tilling wetland cells to promote desirable moist soil vegetation.  

Operation and maintenance of TD-1 includes: coordination with BOR and Quincy Irrigation District, inspecting /repairing enhancements, re-seeding areas that failed to establish desirable vegetation in 2009, controlling undesirable vegetation and noxious weeds, operating water control structures, producing required BPA reports, and administering the contract.  

The TD-2 enhancement project included: enhancement of 19 late-succession stage wetlands by excavation of organic material, construction of dikes to isolate enhanced wetlands from the Winchester Wasteway, allowing for control of unwanted fish populations in the project wetlands, armoring over 1,200 feet of isolation dikes to protect against beaver damage and burrowing mammals, and seeding disturbed soils resulting from construction activities.

Operation and maintenance of TD-2 includes: inspecting and repairing enhancements, controlling undesirable vegetation and noxious weeds,  producing required BPA reports, and administering the contract.
Management of all project ponds will attempt to maximize habitat quality for waterfowl, shore birds, and other wetland obligate wildlife species.
Account Type(s):
Expense
Contract Start Date:
02/01/2010
Contract End Date:
01/31/2011
Current Contract Value:
$36,821
Expenditures:
$36,821

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance A: 165. Environmental compliance documentation 02/01/2010 02/01/2010
Water Use Documentation B: 181. Coordinate with BOR and Quincy Irrigation District 09/30/2010 09/30/2010
Armor dikes at the TD-1 site C: 186. Inspect, repair, physical enhancements and dikes at TD-1 site 01/31/2011 01/31/2011
Armor dikes at the TD-2 site D: 186. Inspect and repair dikes at TD-2 site 01/31/2011 01/31/2011
Seed disturbed soil at TD-1 E: 186. Seed disturbed soil at TD-1 site 01/31/2011 01/31/2011
Seed disturbed soil at TD-2 F: 186. Seed disturbed soil at TD-2 site 01/31/2011 01/26/2011
TD-1 cells tilled G: 22. Till cells at TD-1 07/31/2010 06/24/2010
Seed 50 acres of moist soil vegetation at TD-1 project site H: 47. Moist soil seeding in TD-1 08/15/2010 07/13/2010
Monitor and maintain moist soil vegetation stand at TD-1 project site I: 22. Monitor and maintain desirable vegetation 09/30/2010 09/30/2010
Control of undesirable/invasive vegetation at TD-1 J: 53. Control undesirable vegetation at TD-1 01/31/2011 01/31/2011
Control of undesirable/invasive vegetation at TD-2 project site K: 53. Control undesirable vegetation at TD-2 01/31/2011 01/31/2011
Water in wetland cells at TD-1 L: 186. Operate water control structures at TD-1 01/31/2011 01/31/2011
BPA required administrative duties M: 119. BPA Administrative requirements 01/31/2011 01/31/2011
Wildlife Area Administrative duties N: 119. WDFW Administrative Requirements 01/31/2011 01/31/2011
Attach Progress Report in Pisces P: 132. Submit Progress Report for the period 01/31/2011 01/31/2011
Numbers and species of waterfowl using TD1 and TD2 waters through the fall and winter Q: 157. Fall and winter waterfowl counts 01/31/2011 01/07/2011
Numbers and species of waterfowl pairs using TD2 waters in the spring. R: 157. Spring waterfowl pair counts 05/31/2010 05/17/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 2 instances of WE 22 Maintain Vegetation
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 53 Remove Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance documentation 02/09/2007
B 181 Coordinate with BOR and Quincy Irrigation District 02/09/2007
C 186 Inspect, repair, physical enhancements and dikes at TD-1 site 02/09/2007
D 186 Inspect and repair dikes at TD-2 site 02/09/2007
E 186 Seed disturbed soil at TD-1 site 02/09/2007
F 186 Seed disturbed soil at TD-2 site 02/09/2007
G 22 Till cells at TD-1 02/09/2007
H 47 Moist soil seeding in TD-1 02/09/2007
I 22 Monitor and maintain desirable vegetation 02/09/2007
J 53 Control undesirable vegetation at TD-1 02/09/2007
K 53 Control undesirable vegetation at TD-2 02/09/2007
L 186 Operate water control structures at TD-1 02/09/2007
M 119 BPA Administrative requirements 02/09/2007
N 119 WDFW Administrative Requirements 02/09/2007
O 185 Periodic Status Reports for BPA 02/09/2007
P 132 Submit Progress Report for the period 02/09/2007
Q 157 Fall and winter waterfowl counts 02/01/2010
R 157 Spring waterfowl pair counts 02/01/2010