Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance | B: 165. Environmental compliance documentation | 02/01/2011 | 02/01/2011 | |
Water Use Documentation | C: 181. Coordinate with BOR and Quincy Irrigation District | 09/30/2011 | 09/30/2011 | |
Armor dikes at the TD-1 site | D: 186. Inspect, repair, physical enhancements and dikes at TD-1 site | 01/31/2012 | 01/31/2012 | |
Armor dikes at the TD-2 site | E: 186. Inspect and repair dikes at TD-2 site | 01/31/2012 | 01/31/2012 | |
Seed disturbed soil at TD-1 | F: 186. Seed disturbed soil at TD-1 site | 01/31/2012 | 01/24/2012 | |
Seed disturbed soil at TD-2 | G: 186. Seed disturbed soil at TD-2 site | 01/31/2012 | 01/30/2012 | |
TD-1 cells tilled | H: 22. Till cells at TD-1 | 08/31/2011 | 08/12/2011 | |
Seed 30 acres of moist soil vegetation at TD-1 project site | I: 47. Moist soil seeding in TD-1 | 08/15/2011 | 08/26/2011 | |
Monitor and maintain moist soil vegetation stand at TD-1 project site | J: 22. Monitor and maintain desirable vegetation | 09/30/2011 | 09/30/2011 | |
Control of undesirable/invasive vegetation at TD-1 | K: 53. Control undesirable vegetation at TD-1 | 12/30/2011 | 12/30/2011 | |
Control of undesirable/invasive vegetation at TD-2 project site | L: 53. Control undesirable vegetation at TD-2 | 12/30/2011 | 12/30/2011 | |
Water in wetland cells at TD-1 | M: 186. Operate water control structures at TD-1 | 01/31/2012 | 01/31/2012 | |
BPA required administrative duties | N: 119. BPA Administrative requirements | 01/31/2012 | 01/09/2012 | |
Wildlife Area Administrative duties | O: 119. WDFW Administrative Requirements | 01/31/2012 | 01/31/2012 | |
Attach Annual Progress Report in Pisces | P: 132. Submit Progress Report for the period Feb 2011 to Jan 2012 | 01/31/2012 | 01/31/2012 | |
Attach 10-year Progress Report in Pisces | Q: 132. Submit Progress Report for period Nov 2001 to Oct 2011 | 01/31/2012 | 01/31/2012 | |
Numbers and species of waterfowl using TD1 and TD2 waters through the fall and winter | R: 157. Fall and winter waterfowl counts | 01/31/2012 | 01/06/2012 | |
Numbers and species of waterfowl pairs using TD2 waters in the spring. | S: 157. Spring waterfowl pair counts | 05/31/2011 | 05/31/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2011 | ||||||
B | 165 | Environmental compliance documentation | 02/01/2011 | ||||||
C | 181 | Coordinate with BOR and Quincy Irrigation District | 02/01/2011 | ||||||
D | 186 | Inspect, repair, physical enhancements and dikes at TD-1 site | 02/01/2011 | ||||||
E | 186 | Inspect and repair dikes at TD-2 site | 02/01/2011 | ||||||
F | 186 | Seed disturbed soil at TD-1 site | 02/01/2011 | ||||||
G | 186 | Seed disturbed soil at TD-2 site | 02/01/2011 | ||||||
H | 22 | Till cells at TD-1 | 02/01/2011 | ||||||
I | 47 | Moist soil seeding in TD-1 | 02/01/2011 | ||||||
J | 22 | Monitor and maintain desirable vegetation | 02/01/2011 | ||||||
K | 53 | Control undesirable vegetation at TD-1 | 02/01/2011 | ||||||
L | 53 | Control undesirable vegetation at TD-2 | 02/01/2011 | ||||||
M | 186 | Operate water control structures at TD-1 | 02/01/2011 | ||||||
N | 119 | BPA Administrative requirements | 02/01/2011 | ||||||
O | 119 | WDFW Administrative Requirements | 02/01/2011 | ||||||
P | 132 | Submit Progress Report for the period Feb 2011 to Jan 2012 | 02/01/2011 | ||||||
Q | 132 | Submit Progress Report for period Nov 2001 to Oct 2011 | 02/01/2011 | ||||||
R | 157 | Fall and winter waterfowl counts | 02/01/2011 | ||||||
S | 157 | Spring waterfowl pair counts | 02/01/2011 |