Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Attach Annual Progress Report in Pisces | A: 132. Submit Progress Report for the period Feb 2011 to Jan 2012 | 05/15/2012 | 03/05/2012 | |
Numbers and species of waterfowl pairs using TD2 waters in the spring. | B: 157. Spring waterfowl pair counts | 07/27/2012 | 07/05/2012 | |
Seed 30 acres of moist soil vegetation at TD-1 project site | C: 47. Moist soil seeding in TD-1 | 08/31/2012 | 07/26/2012 | |
TD-1 cells tilled | D: 181. Till cells at TD1 | 08/31/2012 | 07/24/2012 | |
Water Use Documentation | E: 181. Coordinate with BOR and Quincy Irrigation District | 09/30/2012 | 09/28/2012 | |
Monitor and maintain moist soil vegetation stand at TD-1 project site | F: 197. Monitor and maintain desirable vegetation | 09/30/2012 | 09/28/2012 | |
Control of undesirable/invasive vegetation at TD-1 | G: 197. Control undesirable vegetation at TD-1 | 12/31/2012 | 12/31/2012 | |
Control of undesirable/invasive vegetation at TD-2 project site | H: 197. Control undesirable vegetation at TD-2 | 12/31/2012 | 12/31/2012 | |
Environmental Compliance | I: 165. Environmental compliance documentation | 01/31/2013 | ||
Armor dikes at the TD-1 site | J: 186. Inspect and repair water control structures and dikes at TD-1 site | 01/31/2013 | 01/22/2013 | |
Armor dikes at the TD-2 site | K: 186. Inspect and repair dikes at TD-2 site | 01/31/2013 | 01/22/2013 | |
Seed disturbed soil at TD-1 | L: 186. Seed disturbed soil at TD-1 site | 01/31/2013 | 01/11/2013 | |
Seed disturbed soil at TD-2 | M: 186. Seed disturbed soil at TD-2 site | 01/31/2013 | 01/15/2013 | |
Water in wetland cells at TD-1 | N: 186. Operate water control structures at TD-1 | 01/31/2013 | 01/28/2013 | |
Wildlife Area Administrative duties | O: 119. WDFW Administrative Requirements | 01/31/2013 | 01/31/2013 | |
Numbers and species of waterfowl using TD1 and TD2 waters through the fall and winter | P: 157. Fall and winter waterfowl counts | 01/31/2013 | 01/29/2013 | |
BPA required administrative duties completed | R: 119. BPA Administrative requirements | 01/31/2013 | 01/31/2013 |
Primary Focal Species | Work Statement Elements |
---|---|
Wildlife |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 132 | Submit Progress Report for the period Feb 2011 to Jan 2012 | 02/01/2012 | ||||||
B | 157 | Spring waterfowl pair counts | 02/01/2012 | ||||||
C | 47 | Moist soil seeding in TD-1 | 02/01/2012 | ||||||
D | 181 | Till cells at TD1 | 02/01/2012 | ||||||
E | 181 | Coordinate with BOR and Quincy Irrigation District | 12/21/2011 | ||||||
F | 197 | Monitor and maintain desirable vegetation | 02/01/2012 | ||||||
G | 197 | Control undesirable vegetation at TD-1 | 02/01/2012 | ||||||
H | 197 | Control undesirable vegetation at TD-2 | 02/01/2012 | ||||||
I | 165 | Environmental compliance documentation | 02/01/2012 | ||||||
J | 186 | Inspect and repair water control structures and dikes at TD-1 site | 02/01/2012 | ||||||
K | 186 | Inspect and repair dikes at TD-2 site | 02/01/2012 | ||||||
L | 186 | Seed disturbed soil at TD-1 site | 02/01/2012 | ||||||
M | 186 | Seed disturbed soil at TD-2 site | 02/01/2012 | ||||||
N | 186 | Operate water control structures at TD-1 | 02/01/2012 | ||||||
O | 119 | WDFW Administrative Requirements | 02/01/2012 | ||||||
P | 157 | Fall and winter waterfowl counts | 02/01/2012 | ||||||
Q | 185 | Periodic Status Reports for BPA | 02/01/2012 | ||||||
R | 119 | BPA Administrative requirements | 02/01/2012 |