NEPA Checklist |
A: 165. Complete NEPA Analysis and Documentation |
|
08/28/2010 |
07/30/2010 |
Summary of Activities |
B: 189. Coordinate Restoration Efforts with Stakeholders |
|
05/31/2011 |
05/27/2011 |
Project Descriptions/Agreements |
C: 114. Identify and Select New Restoration Projects |
|
05/31/2011 |
05/27/2011 |
Completed Survey and Management Recommendations |
D: 115. Inventory In Channel Large Wood and LWD Recruitment Potential |
|
11/30/2010 |
11/26/2010 |
Completed design |
E: 175. Complete project planning for West Fork Benewah Creek Fish Passage Improvement |
|
05/31/2011 |
05/27/2011 |
Complete Restoration Design Elements |
F: 30. Benewah Creek Channel Construction |
|
10/01/2010 |
09/30/2010 |
Vegetate Disturbed Areas |
G: 47. Plant Disturbed Areas in Benewah Creek Following Construction |
|
05/31/2011 |
05/27/2011 |
Plant 3,700 Deciduous Trees and Shrubs |
H: 47. Enhance Riparian/Floodplain Plant Communities in Benewah Creek |
|
05/31/2011 |
05/27/2011 |
Complete channel construction |
I: 30. West Fork Lake Creek Channel Construction |
|
10/31/2010 |
08/27/2010 |
Vegetate Disturbed Areas |
J: 47. Plant Disturbed Areas In Lake Creek Following Construction |
|
05/31/2011 |
05/27/2011 |
Remove Brook Trout from Benewah Creek |
K: 190. Remove Brook Trout from Benewah Creek |
|
10/15/2010 |
11/30/2010 |
Evaluate the effectiveness of removal techniques |
L: 162. Analyze Data from Brook Trout Removal from Benewah Creek |
|
02/25/2011 |
02/28/2011 |
Install Migration Traps in Lake and Benewah Creeks |
M: 70. Install and Maintain Migration Traps Lake and Benewah Creeks |
|
05/31/2011 |
05/27/2011 |
Monitored movements and numerical abundances of adfluvial cutthroat trout |
N: 157. Trap Juvenile and Adult Adfluvial Westslope Cutthroat Trout in Lake and Benewah Creeks |
|
05/31/2011 |
05/27/2011 |
Operational PIT Tag Systems |
O: 70. Install and Maintain PIT tag antenna system in Lake and Benewah Creeks |
|
05/31/2011 |
05/27/2011 |
PIT Tag Juvenile Cutthroat in Lake and Benewah Creeks |
P: 158. PIT Tag Juvenile Adfluvial Westslope Cutthroat Trout in Lake Creek and Benewah Creek |
|
05/31/2011 |
05/27/2011 |
Abundance Estimates of Salmonids in Target Watersheds |
Q: 157. Sample Salmonids in Target Watersheds for Indices of Abundance |
|
10/16/2010 |
10/15/2010 |
Distribution maps |
R: 157. Roving Salmonid Survey in Tributaries in the Lake Creek |
|
08/27/2010 |
07/30/2010 |
Updated Database of Biological and Life-History Salmonid Variables for Target Watersheds |
S: 160. Biological Data Management |
|
05/31/2011 |
05/27/2011 |
Abundance and Life-History Information for Adfluvial Westslope Cutthroat Trout |
T: 162. Analyze Data Generated from Salmonid Trapping and PIT Tagging in Lake and Benewah Creeks |
|
02/25/2011 |
02/28/2011 |
Trend Analyses of subbasin and watershed scale salmonid abundance |
U: 162. Analyze Data Generated from Salmonid Sampling in Target Watersheds |
|
02/25/2011 |
02/28/2011 |
Completed Inventories |
V: 157. Measure Physical Habitat in Reference and Treatment Reaches |
|
10/29/2010 |
10/29/2010 |
Description of beaver dam characteristics, stability and physical habitat influence |
W: 157. Measure Physical Habitat Associated with Beaver Dams |
|
10/29/2010 |
10/29/2010 |
Hourly Water and Air Temperatures Describing Longitudinal Patterns in Target Watersheds |
X: 157. Measure Water and Air Temperature in Alder, Lake, Benewah and Evans Creek watersheds |
|
05/31/2011 |
05/27/2011 |
Measurement of Thermal Heterogeneity in Benewah Creek |
Y: 157. Measure Thermal Heterogeneity in Benewah Creek |
|
08/30/2010 |
08/13/2010 |
Updated database of physical habitat attributes, temperature and discharge measurements |
Z: 160. Physical Data Management |
|
05/31/2011 |
05/27/2011 |
Analyses of physical habitat and temperature dynamics at reference and treatment sites |
AA: 162. Analyze Data from Physical Habitat Sampling and Temperature Monitoring in Target Watersheds |
|
02/25/2011 |
02/28/2011 |
Analyses of dam stability and physical data collected at monitored beaver dams |
AB: 162. Analyze Data from Monitoring of Engineered and Natural Beaver Dam Structures in Benewah Creek |
|
02/25/2011 |
02/28/2011 |
Summary of Education/Outreach Activities |
AC: 99. Provide Education and Outreach Opportunities |
|
05/31/2011 |
05/27/2011 |
Final 2009 report uploaded to the BPA website |
AE: 132. Submit Annual Report for the period Jan 2009 to Dec 2009 |
|
04/30/2011 |
|
Accrual Estimates/FY2011 SOW/Metrics Reports |
AF: 119. Manage and Administer Project |
|
05/31/2011 |
05/27/2011 |