Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 47984: 2008-471-00 EXP ACCORD UPPER COLUMBIA NUTRIENT SUPPLEMENTATION
Project Number:
Title:
Upper Columbia Nutrient Supplementation
Stage:
Closed
Area:
Province Subbasin %
Columbia Cascade Wenatchee 100.00%
Contract Number:
47984
Contract Title:
2008-471-00 EXP ACCORD UPPER COLUMBIA NUTRIENT SUPPLEMENTATION
Contract Continuation:
Previous: Next:
41807: 2008-471-00 EXP YN MOA UPPER COLUMBIA NUTRIENT SUPPLEMENTATION
  • 52183: 2008-471-00 EXP ACCORD UPPER COLUMBIA NUTRIENT SUPPLEMENTATION
Contract Status:
Closed
Contract Description:
The goal of this project is to asses nutrient availability within freshwater trophic levels of the Twisp River Watershed. Nutrient supplementation through specific prescriptions could follow if nutrients levels are shown to be limiting as a result of reduced, low levels of natural production within the basin.

This statement of work includes work elements for tasks to be completed in FY 2010. Sampling for primary and secondary production will take place monthly, April - November (though this contract covers June- November). Sample sites will include another replicate transect 100 meters downstream where some of the sampling metrics will be measured to increase replication. Increased duration, decreased frequency and better spatial representation was based on ecological representation and statistical tests of 08-09 data, looking at variability and sample size efficiencies.

Bioenergetic modeling and stable isotope analysis will be developed further during this contract period. Developing methods and the technical design details will involve utilizing the expertise of staff at the University of Idaho. Our plan are to use existing  knowledge at the university to develop design parameters that will shape the way we utilize these analysis methods. In addition to the design details, U OF I has the ability to do complex lab analysis associated with stable isotopes samples.

The additional sampling metrics involving ESA listed fish species requires research permits from NOAA and USFWS. These permit applications are lengthy with long processing times. These permits are an absolute necessity to the goals of this project and are a primary task in the SOW.  Furthermore, the permits are pre-requisites for being able to respond to the ISRP's proposal review comments in subsequent years/contracts.
Account Type(s):
Expense
Contract Start Date:
06/01/2010
Contract End Date:
03/31/2011
Current Contract Value:
$173,656
Expenditures:
$173,656

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Paul Anders Idaho Department of Fish and Game (IDFG) No Technical Contact
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Lee Carlson Yakama Confederated Tribes Yes Supervisor carl@yakamafish-nsn.gov (509) 865-5121x6308
Monica Clark Yakama Confederated Tribes Yes Administrative Contact monica@yakama.com (509) 865-5121x6338
Bruce Hollen Bonneville Power Administration No Env. Compliance Lead bahollen@bpa.gov (503) 230-5756
John Jorgensen Yakama Confederated Tribes Yes Contract Manager jorj@yakamafish-nsn.gov (509) 670-7298
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Brandon Rogers Yakama Confederated Tribes Yes Technical Contact rogb@yakamafish-nsn.gov (509) 949-4109


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Create Custom Database B: 160. Create Nutrient Database 03/28/2011 03/28/2011
Collect field samples C: 157. Sample and collect field data 03/31/2011 03/31/2011
Analyze lab data D: 157. Identify and analyze lab data 03/31/2011 03/31/2011
Data Analysis E: 162. Analyze Primary and Secondary Production Data 03/28/2011 03/31/2011
Apply for required ESA fish handling permits F: 165. Apply for ESA fish handling permits 03/31/2011 02/15/2011
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period April 2009 through January 2010 03/30/2011
Funding Package - Submit draft to COTR H: 119. Routine Contract Administration 01/01/2011 02/15/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 04/01/2010
B 160 Create Nutrient Database 04/01/2010
C 157 Sample and collect field data 06/01/2010
D 157 Identify and analyze lab data 04/01/2010
E 162 Analyze Primary and Secondary Production Data 04/01/2010
F 165 Apply for ESA fish handling permits 06/01/2010
G 132 Submit Progress Report for the period April 2009 through January 2010 04/01/2010
H 119 Routine Contract Administration 04/01/2010