Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 48684: 198805304 EXP HOOD RIVER PIT TAG READER ASSEMBLY AND INSTALLATION
Project Number:
Title:
Hood River Production Monitor and Evaluation (M&E)-Oregon Department of Fish and Wildlife (ODFW)
Stage:
Complete
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
48684
Contract Title:
198805304 EXP HOOD RIVER PIT TAG READER ASSEMBLY AND INSTALLATION
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract is for USGS Columbia River Research Laboratory to build and install a PIT tag interrogation system at the mouth of the Hood River.  USGS will work closely with ODFW to have antennas built and installed in late summer or fall of 2010.  A transceiver and power supply will be placed on site and operation should begin during fall 2010.  USGS will insure that the system is functioning properly and that data from the system are of format to be uploaded to the PTAGIS database.
Account Type(s):
Expense
Contract Start Date:
08/01/2010
Contract End Date:
11/30/2010
Current Contract Value:
$27,523
Expenditures:
$27,523

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Mickey Carter Bonneville Power Administration Yes Env. Compliance Lead macarter@bpa.gov (503) 230-5885
Patrick Connolly US Geological Survey (USGS) Yes Contract Manager pconnolly@usgs.gov (509) 538-2299x269
Richard Golden Jr Bonneville Power Administration Yes COR rlgolden@bpa.gov (503) 230-5119
Elizabeth Gordon US Geological Survey (USGS) No Administrative Contact egordon@usgs.gov (509) 538-2299x241
Ian Jezorek US Geological Survey (USGS) No Technical Contact ijezorek@usgs.gov (509) 538-2908
Alec Maule US Geological Survey (USGS) No Supervisor amaule@usgs.gov (509) 538-2299x239
Rosemary Mazaika Bonneville Power Administration Yes F&W Approver rxmazaika@bpa.gov (503) 230-5869
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Robert Reagan Oregon Department of Fish and Wildlife Yes Interested Party robert.e.reagan@state.or.us (541) 296-8045
Seok Wilson US Geological Survey (USGS) No Administrative Contact shwilson@usgs.gov (509) 538-2299


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Build and install a PIT tag interrogation system for the mouth of the Hood River B: 70. Build and install a PIT tag interrogation system at the mouth of the Hood River 11/30/2010 11/30/2010
Insure data collection from the system C: 157. Insure data collection from the system 11/30/2010 11/30/2010
Register site with PTAGIS and submit data D: 159. Register site with PTAGIS and submit data 11/30/2010
Obtain permitting E: 165. Complete NEPA and obtain permits as necessary. 08/31/2010 08/31/2010
Submit accrual and invoice information to BPA F: 119. Submit September Accrual 11/30/2010 11/30/2010
Work summary G: 132. Submit Progress Report 11/30/2010 11/30/2010

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Lower Columbia River ESU (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 159 Transfer/Consolidate Regionally Standardized Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 08/01/2010
B 70 Build and install a PIT tag interrogation system at the mouth of the Hood River 08/01/2010
C 157 Insure data collection from the system 08/01/2010
D 159 Register site with PTAGIS and submit data 08/01/2010
E 165 Complete NEPA and obtain permits as necessary. 08/01/2010
F 119 Submit September Accrual 08/01/2010
G 132 Submit Progress Report 08/01/2010