Contract 49843: 198805308 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
Project Number:
Title:
Hood River Production Operations and Maintenance (O&M) and Powerdale
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Gorge Hood 100.00%
Contract Number:
49843
Contract Title:
198805308 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
Contract Continuation:
Previous: Next:
44256: 198805308 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
  • 54581: 1988-053-08 EXP OAK SPRINGS ODFW HOOD RIVER PRODUCTION
Contract Status:
Closed
Contract Description:
The Oregon Department of Fish  and Wildlife (ODFW) will operate the incubation, early rearing and raceway ponds at Oak Springs Fish Hatchery that are designed for the production of Hood River summer and winter steelhead. The hatchery manager will be responsible for all phases of the steelhead rearing program, including: isolation incubation and early rearing, disease prevention and treatment, fin marking, and transfer of 50,000 winter steelhead smolts and 40,000 summer steelhead smolts to Hood River acclimation facilities, this hatchery production will require close coordination with other Hood River Production Project personnel, from both ODFW and Confederated Tribes of Warm Springs Indians (CTWS). Coordination will include correct external marking, achieving smolt size objective at the pre-determined time of release, and delivery of fish to acclimation facilities. The ODFW Watershed Coordinator will supervise the hatchery manager.

Acronyms:
HMIS:  Hatchery Management Information System
IHOT:  Integrated Hatchery Operations Team
IHN:  Infectious Hematopoietic Necrosis
Account Type(s):
Expense
Contract Start Date:
10/01/2010
Contract End Date:
09/30/2011
Current Contract Value:
$133,839
Expenditures:
$133,839

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Documentation of environmental compliance completed B: 165. NEPA and ESA compliance for project work 09/30/2011 09/30/2011
Progress toward 50,000 winter steelhead at 5 per pound C: 176. BY2011 Hood River Winter steelhead (50,000 smolts) 05/30/2011 05/30/2011
Transfer of 50,000 winter steelhead at 5 per pound complete D: 176. BY2010 Hood River Winter steelhead (50,000 smolts) 05/15/2011 05/04/2011
Mark 100% of steelhead with a goal of 97% mark retention E: 158. Fin clip 100% of BY2010 steelhead smolts 12/15/2010 12/15/2010
Fully functional fish hatchery to produce quality fish F: 61. Day-to-day and "periodically scheduled" maintenance 09/30/2011 09/30/2011
Fish loss picked and recorded daily G: 60. Periodic fish health sampling 09/30/2011 09/30/2011
All sampling completed H: 157. Collect fish culture data 09/30/2011 09/30/2011
Annual Operating Plan uploaded to Pisces I: 174. Annual Operating Plan submitted to BPA 07/15/2011 07/15/2011
Project management activities complete J: 119. Manage Project 09/30/2011 09/30/2011
Data/information Transfer to Warm Springs Tribe K: 132. No Annual Report due under this contract 09/30/2011 09/30/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Steelhead (O. mykiss) - Lower Columbia River DPS (Threatened)
  • 2 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 10/01/2010
B 165 NEPA and ESA compliance for project work 10/01/2010
C 176 BY2011 Hood River Winter steelhead (50,000 smolts) 07/14/2010
D 176 BY2010 Hood River Winter steelhead (50,000 smolts) 07/14/2010
E 158 Fin clip 100% of BY2010 steelhead smolts 10/01/2010
F 61 Day-to-day and "periodically scheduled" maintenance 09/09/1996
G 60 Periodic fish health sampling 07/14/2010
H 157 Collect fish culture data 10/01/2010
I 174 Annual Operating Plan submitted to BPA 10/01/2010
J 119 Manage Project 10/01/2010
K 132 No Annual Report due under this contract 10/01/2010