Province | Subbasin | % |
---|---|---|
Blue Mountain | Grande Ronde | 100.00% |
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Provide a Capture Summary of ESA Listed Species | A: 165. Ensure Environmental Compliance Requirements Have Been Met | 02/04/2011 | 03/18/2011 | |
Upload Steelhead Catch Data | B: 157. Collect Data for Monitoring the Status of Adult Steelhead at the Lostine River Weir | 07/09/2011 | 07/08/2011 | |
Upload Species Catch Datato the Lostine River Weir | C: 157. Collect Data for Monitoring and Evaluating Adult Chinook Salmon | 10/07/2011 | 09/14/2011 | |
Juvenile Chinook Salmon Survival Estimate Data | D: 157. Collect Juvenile Spring Chinook Salmon Mainstem Interrogation Data | 12/23/2011 | 12/23/2011 | |
Wallowa and Lostine River Spring Chinook Salmon Spawning Ground Survey Data | E: 157. Collect Chinook Salmon Spawning Ground Survey Data | 12/09/2011 | 11/04/2011 | |
Upload PIT Tag Interrogation Data to the PTAGIS Database | F: 157. Collect Data for Monitoring and Evaluating Juvenile Spring Chinook Salmon | 05/27/2011 | 05/02/2011 | |
Mark Lostine River Conventional Chinook Salmon | G: 158. PIT Tag Lostine River Hatchery Spring Chinook Salmon | 11/04/2011 | 11/04/2011 | |
Analyze and Interpret Conventional Broodstock Chinook Salmon Data | H: 162. Analyze and Interpret Conventional Broodstock Chinook Salmon Data for Annual Report | 12/30/2011 | ||
Analyze and Interpret Captive Broodstock Chinook Salmon Data | I: 162. Analyze and Interpret Captive Broodstock Chinook Salmon Data for Annual Report | 12/30/2011 | ||
Analyze and Interpret Adult Steelhead Catch and Recovery Data | J: 162. Analyze and Interpret Steelhead data for Technical Reports and Management Forums | 06/30/2011 | 06/30/2011 | |
Attend State, Tribe and Federal Agency Meetings | K: 189. Coordinate Lostine River Monitoring and Evaluation Activities within the Grande Ronde Subbasin | 12/30/2011 | 12/30/2011 | |
Produce an Annual Report for 2009 | L: 132. Complete and Submit an Annual Report to BPA for the period 1/2/2009 to 12/31/2009 | 03/31/2011 | 03/29/2011 | |
Produce an Annual Report for 2010 | M: 132. Prepare and Submit an Annual Report to BPA for the period 1/2/2010 to 12/31/2010 | 12/16/2011 | 12/13/2011 | |
Prepare a Contract Package | N: 119. Manage and Administer the Project Contract | 11/01/2011 | 08/19/2011 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Ensure Environmental Compliance Requirements Have Been Met | 01/01/2011 | ||||||
B | 157 | Collect Data for Monitoring the Status of Adult Steelhead at the Lostine River Weir | 04/08/2011 | ||||||
C | 157 | Collect Data for Monitoring and Evaluating Adult Chinook Salmon | 01/01/2011 | ||||||
D | 157 | Collect Juvenile Spring Chinook Salmon Mainstem Interrogation Data | 01/01/2011 | ||||||
E | 157 | Collect Chinook Salmon Spawning Ground Survey Data | 01/01/2011 | ||||||
F | 157 | Collect Data for Monitoring and Evaluating Juvenile Spring Chinook Salmon | 01/01/2011 | ||||||
G | 158 | PIT Tag Lostine River Hatchery Spring Chinook Salmon | 01/01/2011 | ||||||
H | 162 | Analyze and Interpret Conventional Broodstock Chinook Salmon Data for Annual Report | 01/01/2011 | ||||||
I | 162 | Analyze and Interpret Captive Broodstock Chinook Salmon Data for Annual Report | 01/01/2011 | ||||||
J | 162 | Analyze and Interpret Steelhead data for Technical Reports and Management Forums | 01/01/2011 | ||||||
K | 189 | Coordinate Lostine River Monitoring and Evaluation Activities within the Grande Ronde Subbasin | 01/01/2011 | ||||||
L | 132 | Complete and Submit an Annual Report to BPA for the period 1/2/2009 to 12/31/2009 | 01/01/2011 | ||||||
M | 132 | Prepare and Submit an Annual Report to BPA for the period 1/2/2010 to 12/31/2010 | 01/01/2011 | ||||||
N | 119 | Manage and Administer the Project Contract | 01/01/2011 | ||||||
O | 185 | Periodic Status Reports for BPA | 01/01/2011 |