Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 51457: 200850600 EXP SMOLT VIDEO MONITORING
Project Number:
Title:
Smolt Monitoring Video Feasibility Project
Stage:
Closed
Area:
Province Subbasin %
Mainstem - 100.00%
Contract Number:
51457
Contract Title:
200850600 EXP SMOLT VIDEO MONITORING
Contract Continuation:
Previous: Next:
46478: 200850600 EXP SMOLT VIDEO MONITORING
Contract Status:
History
Contract Description:
This contract will continue a feasibility project, which began with Fish Passage Center funding in 2006 and was implemented in 2009 using MOA funding, to assess whether video technology can be used to reduce smolt handling in the regions smolt monitoring program.  In 2009, this MOA project installed a window and box adjacent to the Bonneville Dam fish passage channel just upstream of the separator at the juvenile fish facility. Inside the box was a video camera while lighting with lighting provided from above.   In both 2009 and 2010 we tested and modified the system and expect testing and evaluation to continue in 2011.  In 2011 the project will be expanded to include a McNary component where we will install a video box where selected juvenile fall Chinook we previously PIT tagged at the Hanford Reach  will be recorded.  From the video imates, we will attempt to measure the length of these fish, as well as determining the condition, and compare this to that at the time of tagging.
Account Type(s):
Expense
Contract Start Date:
03/01/2011
Contract End Date:
02/29/2012
Current Contract Value:
$54,217
Expenditures:
$54,217

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete B: 165. Complete environmental compliance requirements 02/28/2012 02/26/2012
Design and installation of video monitoring system C: 70. Installation of video monitoring system 10/28/2011 10/28/2011
Collection of video files D: 157. Data collection 11/30/2011 11/30/2011
Data analysis for annual report E: 162. Data analysis for Bonneville Video 02/29/2012 02/26/2012
Summary report F: 161. Reporting 02/29/2012 02/26/2012
Attach Progress Report in Pisces G: 132. Submit Progress Report for the period November 2010 to October 2011 02/15/2012 02/26/2012
Complete all project management and administrative activities for contract H: 119. Manage and administer project 02/29/2012 02/26/2012
Video counting box at McNary Dam smolt bypass system I: 70. Design and install video counting box at McNary Dam smolt bypass system 06/10/2011 07/14/2011
Data analysis for McNary Dam video J: 162. Data analysis for McNary Dam video 01/27/2012 01/27/2012

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (Oncorhynchus tshawytscha) - All Populations
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 162 Analyze/Interpret Data
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Sockeye (Oncorhynchus nerka) - All Populations
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data
Steelhead (Oncorhynchus mykiss) - All Populations
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 161 Disseminate Raw/Summary Data and Results
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 03/01/2011
B 165 Complete environmental compliance requirements 03/01/2011
C 70 Installation of video monitoring system 03/01/2011
D 157 Data collection 03/01/2011
E 162 Data analysis for Bonneville Video 03/01/2011
F 161 Reporting 03/01/2011
G 132 Submit Progress Report for the period November 2010 to October 2011 03/01/2011
H 119 Manage and administer project 03/01/2011
I 70 Design and install video counting box at McNary Dam smolt bypass system 03/01/2011
J 162 Data analysis for McNary Dam video 03/01/2011