Contract 52151: 1991-047-00 EXP SHERMAN CREEK HATCHERY
Project Number:
Title:
Sherman Creek Hatchery Operations and Maintenance (O&M)
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Columbia Upper 100.00%
Contract Number:
52151
Contract Title:
1991-047-00 EXP SHERMAN CREEK HATCHERY
Contract Continuation:
Previous: Next:
46508: 1991-047-00 EXP SHERMAN CREEK HATCHERY
  • 56758: 1991-047-00 EXP SHERMAN CREEK HATCHERY
Contract Status:
Closed
Contract Description:
The Sherman Creek Hatchery (SCH) is one of two facilities provided to partially mitigate for the loss of anadromous and resident fish due to the construction of Columbia River mainstem dams.  It is located immediately adjacent to Lake Roosevelt at the mouth of Sherman Creek.  This is three miles west of Kettle Falls, Washington and 101 miles upstream from Grand Coulee Dam. SCH consisting of three large concrete raceways and support facilities was constructed in 1991, and became operational in April 1992 with first releases later that year. In 1999 SCH added twenty net pens at river mile 699 to facilitate increased rearing capabilities on Lake Roosevelt.  Bonneville Power Administration (BPA) constructed the Hatchery.  Washington Department of Fish and Wildlife (WDFW) performs annual operations and maintenance with funding provided by BPA.  In 1991 BPA and WDFW entered into a non-discretionary 25-year Memorandum of Agreement to fund the operations and maintenance.  Current operations include use of native / indigenous stocks for propagation into Upper Columbia River Basin Waters.  These include native Kootenay Lake kokanee salmon from the Freshwater Fisheries Society of British Columbia and native white sturgeon in conjunction with the Transboundary Upper Columbia White Sturgeon Recovery Project.

The intent of this project is to continue working with the Lake Roosevelt artificial production projects to provide readily accessible sport and Tribal subsistence fisheries that are compatible and beneficial to the ecological conditions in Lake Roosevelt and Banks Lake (Grand Coulee Dam impoundments).  Artificial production has been determined a feasible method for sustaining viable fisheries in Lake Roosevelt and Banks Lake.  The Washington Department of Fish and Wildlife, Spokane Tribe, Colville Confederated Tribes and Lake Roosevelt Development Association/Lake Roosevelt Volunteer Net Pen Project are cooperating in a comprehensive artificial production program to produce kokanee salmon (Oncorhynchus nerka) and rainbow trout (Oncorhynchus mykiss) for annual releases into the project area.  The program consists of the Spokane Tribal Hatchery, Sherman Creek Hatchery, Ford Trout Hatchery, Colville Trout Hatchery and the Lake Roosevelt Rainbow Trout Net Pen rearing project. The Lake Roosevelt and Banks Lake Fisheries Evaluation Programs monitor and evaluates release strategies and production methods for the aforementioned projects.  Between 1985 and 2010, the projects have annually produced up to 800,000 rainbow trout and 4 million kokanee salmon for release into Lake Roosevelt and 1.4 million kokanee fry for Banks Lake.  The current (2011) annual release goals include 305,000 kokanee yearlings, 2.05 million kokanee fry, 250,000 kokanee eggs and 750,000 rainbow trout yearlings for the project area.  This project is funded by the Bonneville Power Administration under directives by the Northwest Power Planning Councils Columbia River Basin Fish & Wildlife Program, Resident Fish Substitution Measures, 1987 to current (Subbasin Plan), as partial mitigation for anadromous and resident fish losses in the blocked areas above Chief Joseph and Grand Coulee Dams.
Account Type(s):
Expense
Contract Start Date:
03/01/2011
Contract End Date:
02/29/2012
Current Contract Value:
$291,944
Expenditures:
$291,944

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Obtain and maintain all necessary permits A: 165. Obtain / Maintain Permits 02/29/2012 02/29/2012
Release up to 240,000 kokanee at 5-7 fish per/lb. B: 176. Yearling Kokanee Salmon Acclimation and Release 06/15/2011 06/11/2011
Spawn adult fish to meet biological objectives. C: 176. Spawn Kokanee Salmon. 12/31/2011 12/31/2011
Increased use of native stocks in the artificial production program. D: 176. Alternate Brood Stocks / Eggs Imported. 12/31/2011 12/31/2011
Transfer up to 300,000 rainbow to net pens. E: 176. Spokane (WDFW) Stock Rainbow Trout Fingerling Rearing 11/30/2011 10/19/2011
Fish trapping, transfer and stocking within the Lake Roosevelt Project F: 66. Fish Trapping, Transfers and Plants 02/29/2012 02/29/2012
Produce Healthy Fish G: 60. Fish Health Monitoring 02/29/2012 02/29/2012
Maintain Sherman Creek Hatchery / Net Pens. H: 61. Sherman Creek Hatchery & Net Pens - Maintenance and Repair 02/29/2012 02/29/2012
Represent WDFW and BPA on the Lake Roosevelt Project. I: 99. Outreach and Education 02/29/2012 02/29/2012
Manage Sherman Creek Hatchery including Scope of Work and metrics reporting. J: 119. SOW, Accrual and Metrics Reporting 02/29/2012 02/29/2012
Monthly record keeping and reporting. K: 141. Produce Monthly: Stock / Plant Reports & Fiscal / Billing Reports 02/29/2012 02/29/2012
Attach Progress Report in Pisces L: 132. Submit Progress Report for the period (Jan 2007) to (Dec. 2007) 02/29/2012 02/14/2012
Attach Progress Report in Pisces M: 132. Submit Progress Report for the period (Jan 2008) to (Dec. 2008) 02/29/2012 02/15/2012
Produce annual report of project status and accomplishments. N: 132. Submit Progress Report for the period (Jan 2009) to (Dec. 2009) 08/31/2011
Attach Progress Report in Pisces O: 132. Submit Progress Report for the period (Jan 2010) to (Dec 2010) 10/01/2011
Produce Annual Operations and Maintenance Plan Q: 174. Produce Operation Plan 02/29/2012 12/31/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Kokanee (Oncorhynchus nerka)
  • 3 instances of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 176 Produce Hatchery Fish
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery
  • 1 instance of WE 60 Maintain Fish Health
  • 1 instance of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 66 Trap/Collect/Hold/Transport Fish - Hatchery

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain / Maintain Permits 03/01/2011
B 176 Yearling Kokanee Salmon Acclimation and Release 03/01/2011
C 176 Spawn Kokanee Salmon. 03/01/2011
D 176 Alternate Brood Stocks / Eggs Imported. 03/01/2011
E 176 Spokane (WDFW) Stock Rainbow Trout Fingerling Rearing 03/01/2011
F 66 Fish Trapping, Transfers and Plants 03/01/2011
G 60 Fish Health Monitoring 03/01/2011
H 61 Sherman Creek Hatchery & Net Pens - Maintenance and Repair 03/01/2011
I 99 Outreach and Education 03/01/2011
J 119 SOW, Accrual and Metrics Reporting 03/01/2011
K 141 Produce Monthly: Stock / Plant Reports & Fiscal / Billing Reports 03/01/2011
L 132 Submit Progress Report for the period (Jan 2007) to (Dec. 2007) 03/01/2011
M 132 Submit Progress Report for the period (Jan 2008) to (Dec. 2008) 03/01/2011
N 132 Submit Progress Report for the period (Jan 2009) to (Dec. 2009) 03/01/2011
O 132 Submit Progress Report for the period (Jan 2010) to (Dec 2010) 03/01/2011
P 185 Periodic Status Reports for BPA 03/01/2011
Q 174 Produce Operation Plan 03/01/2011