SOW Report
Contract 55039: 2000-021-00 EXP LADD MARSH WILDLIFE MITIGATION
Project Number:
Title:
Ladd Marsh Wildlife Mitigation
BPA PM:
Stage:
Closed
Area:
Province Subbasin %
Blue Mountain Grande Ronde 100.00%
Contract Number:
55039
Contract Title:
2000-021-00 EXP LADD MARSH WILDLIFE MITIGATION
Contract Continuation:
Previous: Next:
49831: 2000-021-00 EXP LADD MARSH WILDLIFE MITIGATION
  • 59608: 2000-021-00 EXP LADD MARSH WILDLIFE MITIGATION
Contract Status:
Closed
Contract Description:
The overall goal of the LMWA Additions mitigation project is to protect existing habitat values and restore degraded values that have occurred as a result of past and current land management practices on lands adjacent to or near the existing LMWA.  This Statement of Work (SOW) and associated budget address the maintenance and operation (O&M) of enhancements on Wallender, Conley Lake, and Simonis properties. During the contract period of October 1, 2011 through September 30, 2012, project activities will focus on water and vegetation management to maintain diverse habitats to the extent possible and to control non-native and invasive weeds as well as for enhancement of desirable native vegetation.  In project wetlands, emergent vegetation has increased in density, creating near monocultures in some areas.  Mechanical treatment will be used where necessary to create openings and improve wildlife habitat in such areas.  

Portions of the Wallender tract have been kept dry, to the extent possible, since 2006 during negotiations regarding alleged damage to crop yields on neighboring property due to changes in ground water depth and resulting salts at the surface.  In July 2011, Mr. Wallender, the plaintiff in a lawsuit over alleged damages, dropped the suit.  The case was then dismissed by the Court.  It is the intent of ODFW to install a pumping system to mitigate problems of water movement onto private land for the long term.

The Ladd Marsh project provides a unique opportunity for outreach and education due to its location near La Grande, Oregon.  Numerous schools, including Eastern Oregon University utilize Ladd Marsh as an outdoor classroom and the area is visited by numerous classes each year.  Many of the organizers of such visits request tours, talks or presentations by Ladd Marsh staff.  Local service organizations also frequently request presentations about Ladd Marsh in general or the project in particular.
Account Type(s):
Expense
Contract Start Date:
10/01/2011
Contract End Date:
09/30/2012
Current Contract Value:
$72,516
Expenditures:
$72,516

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Environmental Compliance Documentation A: 165. Produce Environmental Compliance Documentation 01/01/2012 07/31/2012
Summary of O&E activities in Progress Reports and Annual Report B: 99. Respond to requests for project tours and information 09/30/2012 09/27/2012
Operate and maintain water control structures C: 186. Operate and maintain water control structures 09/30/2012 09/27/2012
Access and other information available to the public D: 188. Update and maintain access and information signs 09/30/2012 09/27/2012
Remove trash and other debris from uplands, wetlands and streams. E: 27. Remove trash and other debris from uplands, wetlands and streams 09/30/2012 09/27/2012
Diverse vegetation communities in the project area F: 197. Encourage Native Plant Communities and Control Non-native/Invasive Species 09/30/2012 09/27/2012
FY 13 Funding Package (SOW, budget, Property inventory), plus September accrual estimate. G: 119. Manage and Administer Ladd Marsh Wildlife Area Additions Project 09/10/2012 09/27/2012
Attach Progress Report in Pisces H: 132. Submit Progress Report for the period October 2010 to September 2011 02/28/2012 12/01/2011

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
Wildlife
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 27 Remove Debris
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Produce Environmental Compliance Documentation 10/01/2011
B 99 Respond to requests for project tours and information 10/01/2011
C 186 Operate and maintain water control structures 10/01/2011
D 188 Update and maintain access and information signs 10/01/2011
E 27 Remove trash and other debris from uplands, wetlands and streams 10/01/2011
F 197 Encourage Native Plant Communities and Control Non-native/Invasive Species 10/01/2011
G 119 Manage and Administer Ladd Marsh Wildlife Area Additions Project 10/01/2011
H 132 Submit Progress Report for the period October 2010 to September 2011 10/01/2011
I 185 Periodic Status Reports for BPA 10/01/2011