Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56041: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Project Number:
Title:
Yankee Fork Salmon River Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
56041
Contract Title:
2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Continuation:
Previous: Next:
51571: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
  • 60303: 2002-059-00 EXP YANKEE FORK SALMON RIVER RESTORATION
Contract Status:
Closed
Contract Description:
For the contract year 2012, the Yankee Fork Restoration Project will develop a monitoring and evaluation plan for the Yankee Fork and begin baseline data collection consisting of water quality data, fish biomass/ and usage, physical and biological surveying, and permanent photo points. We will continue the data collection of the use of sondes, temperature thermographs, and discharge measurements with the use of a gauging stations and pressure transducers.
This includes using long term deployment of multi-parameter water quality monitors (Sondes) at five random sites: Flat Rock, Custer Bridge, Jordan Creek, West Fork Yankee Fork and the pond series 1-4. This data collection of continuous water quality will begin April and continue through November. The sondes will measure: pH, conductivity, temperature, turbidity, and dissolved oxygen and is dependent upon the stream conditions and storm events.  Temperature data will be collected throughout the Yankee Fork and tributaries. The project installs air and water thermal data loggers beginning in April and retrieves them in November as conditions permit; within the main-stem Yankee Fork, the project will be collecting data throughout the year, commencing in February 2012 and continuing through January 2013. Additionally, the project will continue to collect discharges measurements and stage readings (manually and digitally, with the use of pressure transducers).  The pressure transducers will gather continuous water levels throughout the field season.  There will be additional sites within dredged section of the Yankee Fork; these sites will collect water levels within the ponds series 1-4 and other tributaries.
In 2011 a USGS gauging station was placed on the lower end of the Yankee Fork Salmon River; the USGS will cost share to maintain this station while publishing the data on the USGS website in 2012.
The Yankee Fork Restoration Project will work with Trout Unlimited to be a lead sponsor for the restoration actions in 2012-2013; this includes working with the Yankee Fork Interdisciplinary team to identify reaches for enhancement within the YFSR. Trout Unlimited will also be taking the lead to work with the private landowners to acquire an agreement. The YF IDT will be addressing the ISRP questions to submit prior to implementation efforts.
To fulfill the requirements of RM & E work elements and sharing data with other agencies, the project will locate all the Tribes Yankee Fork data, organize, and enter into data bases; this includes previous years data and current data.
The Team has a unique opportunity to begin implementing projects in 2012, Pond Series 2 and 3. The private land owner, Simplot, is willing to allow construction as long as it begins soon, 2012. Therefore, we are paralleling implementation and finalizing the tributary assessment; other enhancement reaches will be identified and prioritized when the assessment is completed January 2012.
Account Type(s):
Expense
Contract Start Date:
02/01/2012
Contract End Date:
01/31/2013
Current Contract Value:
$254,963
Expenditures:
$254,963

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Chad Colter Shoshone-Bannock Tribes No Supervisor chad.colter@sbtribes.com (208) 239-4553
Joe Deherrera Bonneville Power Administration Yes COR jldeherrera@bpa.gov (503) 230-3442
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Evelyn Galloway Shoshone-Bannock Tribes Yes Technical Contact egalloway@sbtribes.com (208) 239-4570
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Shannell Ward Shoshone-Bannock Tribes No Contract Manager shannell.ward@sbtribes.com (208) 478-3821
Dawn Williams Shoshone-Bannock Tribes No Interested Party dwilliams@sbtribes.com (208) 478-3927


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
approval from BPA A: 165. Environmental compliance to install pressure transducers/monitoring equipment 05/01/2012 05/01/2012
Summary of meeting notes B: 191. Yankee Fork Interdisciplinary team Meetings 01/15/2013 01/15/2013
Baseline Monitoring and Evaluation plan C: 174. Monitoring and Evaluation plan 12/31/2012 01/31/2013
Baseline Water Quality report D: 157. Collect Water Quality Data 01/31/2013 01/31/2013
reported within annual report E: 162. Analyze Water Quality 01/31/2013 01/31/2013
tabled water quality data F: 161. Disseminate water quality 01/31/2013 01/31/2013
Confirm installation G: 148. Install pressure transducers 05/31/2012 05/31/2012
report tables and hydro-graphs (summery) within the annual report H: 162. Analyze Pressure transducer data 01/31/2013 01/31/2013
provide interested entities with pressure transducer data I: 161. Disseminate pressure transducer data 12/30/2012 12/28/2012
confirmation of Yankee Fork data into database J: 160. Enter/Summarize Yankee Fork data into database 01/31/2013 01/31/2013
Provide accrual information to BPA K: 119. Routine administration of contract 10/07/2012 09/28/2012
Attach Progress Report in Pisces M: 132. Submit Progress Report for the period (Feb 2012 to Jan 2013) 01/31/2013 01/31/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 2 instances of WE 161 Disseminate Raw/Summary Data and Results
  • 2 instances of WE 162 Analyze/Interpret Data
  • 1 instance of WE 148 Install Flow Measuring Device

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental compliance to install pressure transducers/monitoring equipment 02/01/2012
B 191 Yankee Fork Interdisciplinary team Meetings 02/01/2012
C 174 Monitoring and Evaluation plan 02/01/2012
D 157 Collect Water Quality Data 02/01/2012
E 162 Analyze Water Quality 02/01/2012
F 161 Disseminate water quality 02/01/2012
G 148 Install pressure transducers 02/01/2012
H 162 Analyze Pressure transducer data 02/01/2012
I 161 Disseminate pressure transducer data 02/01/2012
J 160 Enter/Summarize Yankee Fork data into database 02/01/2012
K 119 Routine administration of contract 02/01/2012
L 185 Periodic Status Reports for BPA 02/01/2012
M 132 Submit Progress Report for the period (Feb 2012 to Jan 2013) 02/01/2012