Contract 56065 REL 10: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
56065 REL 10
Contract Title:
2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
56065 REL 6: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
  • 56065 REL 14: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
The primary goal of the proposed project is to monitor and evaluate the effectiveness of a fish trap to be installed in the tailrace of Albeni Falls Dam by the Kalispel Tribe of Indians (herein ‘Tribe’).  The Tribe requested the assistance of PNNL to evaluate the trap based on their unique and extensive experience with various electronic monitoring technologies and over a decade of experience studying migratory fishes at Albeni Falls Dam.  The trap will be primarily designed to capture migrating bull trout Salvelinus confluentus and westslope cutthroat trout Oncorhynchus clarki lewisi, which will then be manually transported above Albeni Falls Dam by the Tribe as a means of temporary passage until a more permanent fish passage structure is built.  The trap is currently being designed by McMillen LLC of Boise, Idaho and has been preliminarily designed with a denil fish ladder installed on a floating pontoon structure approximately 21’ in length (as of 4 December 2013).  The denil portion of the trap will be about 16’ long x 2’ wide and will end at an aluminum holding tank approximately 4’ wide, 4’ long and 3’ deep located on the floating structure.  Fish passing from the denil ladder into the holding tank will pass through a finger weir, which will theoretically prevent them from exiting the trap through the denil ladder.  The tentative plan is for the trap to be installed and operating from spring through fall of 2014 to be available for bull trout and westslope cutthroat trout that migrate during this period.  
A secondary goal is to continue operation of previously installed telemetry equipment upstream of Albeni Falls Dam; these stations will remain in place in 2014 for evaluation of previously tagged study fish, and will also be available to detect any newly tagged fish that are transported upstream of Albeni Falls Dam after capture in the fish trap.Objectives

PNNL has two objectives during 2014:

1) Determine the movement behavior of tagged fish within the tailrace of Albeni Falls Dam and whether they enter the fish trap, or come in close proximity of the trap but do not enter it.
2) Continue radio telemetry system monitoring upstream of Albeni Falls Dam in the Pend Oreille River and in the Priest River.
Account Type(s):
Expense
Contract Start Date:
05/01/2014
Contract End Date:
04/30/2015
Current Contract Value:
$106,641
Expenditures:
$106,641

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brian Bellgraph Pacific Northwest National Laboratory Yes Supervisor brian.bellgraph@pnnl.gov (509) 371-7185
Kevin Ghirardo Pacific Northwest National Laboratory No Contract Manager kevin.ghirardo@pnl.gov (509) 371-7198
Joe Maroney Kalispel Tribe Yes Technical Contact jmaroney@knrd.org (509) 447-7272
Ryan McNee Kalispel Tribe Yes Technical Contact rmcnee@kalispeltribe.com (509) 447-7423
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Janie Vickerman Pacific Northwest National Laboratory Yes Administrative Contact janie.vickerman@pnnl.gov (509) 371-7260
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625
Dorothy Welch Bonneville Power Administration Yes F&W Approver dwwelch@bpa.gov (503) 230-5479


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete B: 165. Complete environmental compliance requirements 04/30/2015 04/30/2015
3 functioning monitoring stations C: 70. 3 monitoring stations installed 08/31/2014 06/20/2014
Functioning radio monitoring stations D: 157. Maintain and download radio receiving stations 04/30/2015 04/30/2015
Develop a profile of each fish tracked E: 162. Data reduction and analysis 01/15/2015 01/15/2015
Attach Progress Report in Pisces F: 132. Submit Progress Report for the period 16 November 2013 to 15 November 2014 04/30/2015 04/30/2015
All administrative tasks fulfilled with timely quality products G: 119. Manage Project 04/30/2015 04/30/2015
Testing and calibration of all monitoring stations H: 70. Test all stations prior to FY14/15 monitoring season, if applicable 04/30/2015 04/30/2015
Equipment removed and stored I: 70. Remove telemetry stations 04/30/2015 11/13/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/01/2014
B 165 Complete environmental compliance requirements 05/01/2014
C 70 3 monitoring stations installed 05/07/2014
D 157 Maintain and download radio receiving stations 02/26/2014
E 162 Data reduction and analysis 05/01/2014
F 132 Submit Progress Report for the period 16 November 2013 to 15 November 2014 05/01/2014
G 119 Manage Project 05/01/2014
H 70 Test all stations prior to FY14/15 monitoring season, if applicable 02/26/2014
I 70 Remove telemetry stations 02/26/2014