Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56065 REL 24: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
56065 REL 24
Contract Title:
2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
56065 REL 21: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
  • 56065 REL 28: 2007-246-00 EXP RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
PNNL's primary scope within the overall project is to maintain a radio telemetry system for migrating bull trout in the Pend Oreille River from Albeni Falls Dam downstream to Box Canyon Dam.  This includes maintaining equipment during the field season, coordinating the downloading of data and any maintenance needs with collaborators at Eastern Washington University who will physically check on the systems biweekly, and managing the data storage, filtering, and analysis of telemetry data to provide in-season reports on telemetry system maintennace and to final detection histories of all fish for the annual report.
Account Type(s):
Expense
Contract Start Date:
05/01/2018
Contract End Date:
04/30/2019
Current Contract Value:
$72,680
Expenditures:
$72,680

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete B: 165. Complete environmental compliance requirements 04/30/2019 04/30/2019
Hydrodynamic modeling assistance C: 115. Hydrodynamic modeling of modified fish trap entrance 04/30/2019 04/30/2019
Functioning radio monitoring stations throughout study period D: 157. Maintain and download radio receiving stations 04/30/2019 04/30/2019
Develop a profile of each fish tracked E: 162. Data reduction and analysis 01/30/2019 01/30/2019
Completed Annual Report F: 132. Submit Progress Report for the period 1 Jan through 31 Dec 04/30/2019
Effective implementation management and timely contract administration G: 119. Manage Project 04/30/2019 04/30/2019
Testing and calibration of all monitoring stations, or remove stations H: 70. Test all stations prior to next monitoring season, if applicable. Otherwise, uninstall equipment. 04/30/2019 04/03/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 115 Produce Inventory or Assessment
  • 1 instance of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 05/01/2018
B 165 Complete environmental compliance requirements 05/01/2018
C 115 Hydrodynamic modeling of modified fish trap entrance 05/01/2018
D 157 Maintain and download radio receiving stations 05/01/2018
E 162 Data reduction and analysis 05/01/2018
F 132 Submit Progress Report for the period 1 Jan through 31 Dec 05/01/2018
G 119 Manage Project 05/01/2018
H 70 Test all stations prior to next monitoring season, if applicable. Otherwise, uninstall equipment. 05/01/2018