Completed documentation of environmental compliance to BPA |
B: 165. Complete Permit Applications and Provide Documentation to Obtain Compliance. |
|
02/28/2013 |
02/28/2013 |
Completed hazardous waste surveys |
C: 172. Complete hazardous waste assessments as a part of the pre-acquisition process. |
|
02/28/2013 |
02/28/2013 |
Completed cultural resource surveys |
D: 172. Complete cultural resource surveys. |
|
02/28/2013 |
02/28/2013 |
Completed Acquisition and Easement Agreements |
E: 172. Land Owner Coordination |
|
02/28/2013 |
02/28/2013 |
Completed Designs for Construction/Implementation |
F: 122. Review Designs and Details for Habitat Enhancements. |
|
02/28/2013 |
02/28/2013 |
Completed Operations, Maintenance and Enhancement plan for acquired land acquisitions. |
G: 174. Complete Management Plan for Braden and Sand Creek |
|
02/28/2013 |
02/28/2013 |
Create 10 Wetland Ponds and plug drainage ditches. |
H: 181. Create Wetland Ponds on Washington Management Area |
|
11/30/2012 |
11/30/2012 |
Restore Wetland on Carey Creek Unit, Idaho. |
I: 181. Restore floodplain on Carey Creek Unit, Idaho |
|
09/30/2012 |
09/30/2012 |
Bank stabilization through LWD placement |
J: 29. Add LWD to Shoreline Stabilization sites on Washington Management areas |
|
12/06/2012 |
12/06/2012 |
Pend Oreille River Shoreline Stabilization Areas Seeded |
K: 47. Seed Shoreline Stabilization Site |
|
11/30/2012 |
11/30/2012 |
Wetland Shorelines Seeded |
L: 47. Seed Newly Created Wetland Pond Shorelines |
|
12/13/2012 |
12/13/2012 |
Planted Riparian Areas on Enhancement Sites |
M: 47. Plant Native Trees and Shrubs on the Washington Management Areas |
|
11/05/2012 |
11/05/2012 |
Properties Secured From Trespass |
N: 26. Secure Properties and Provide Enforcement Management. |
|
02/28/2013 |
02/28/2013 |
Maintain access to water control structures. |
O: 38. Maintain access to water control structures. |
|
02/28/2013 |
02/28/2013 |
Fence Maintained |
P: 186. Maintain Fence |
|
02/28/2013 |
02/28/2013 |
Fence maintained |
Q: 186. Maintain Fence |
|
02/28/2013 |
02/28/2013 |
Water Control Structures Maintained and Functioning |
R: 186. Maintain Existing Water Control Structures on Wetland Enhancement Sites. |
|
02/28/2013 |
02/28/2013 |
Buildings Maintained |
S: 186. Manage and Maintain Facility to Maximal Standards |
|
02/28/2013 |
02/28/2013 |
Shoreline Stabilization |
T: 186. Maintain Integrity of Shoreline Stabilization Structures |
|
02/28/2013 |
02/28/2013 |
Completion of Required Project Reporting to BPA |
U: 119. Oversight of New Projects, Implementation, Construction, O&M, RM&E w/ participating agencies |
|
02/28/2013 |
02/28/2013 |
Completed FY12 Annual Report to BPA |
V: 132. Annual Report for 2012 Contract Cycle |
|
02/28/2013 |
02/28/2013 |
Conduct Pre-Acquisition Work |
W: 172. Conduct Pre-acquisition work |
|
02/28/2013 |
02/28/2013 |
Vegetation Removal |
X: 197. Vegetation Removal (removed K 53. and replaced with this one 197.) |
|
12/21/2012 |
10/21/2012 |
Maintain Established Vegetation |
Y: 197. Maintain Planted Materials within the WA Management Units |
|
02/28/2013 |
02/28/2013 |
Maintain Established Vegetation |
Z: 197. Maintain Previously Planted Materials within the Idaho Management Areas |
|
02/28/2013 |
02/28/2013 |
Completed Spring and Fall Burns |
AA: 197. Conduct Spring and Fall Controlled Burns |
|
02/28/2013 |
02/28/2013 |