Obtain environmental compliance |
B: 165. Produce Environmental Compliance Documentation for all applicable work on Coho Reintroduction |
|
01/31/2014 |
01/31/2014 |
Continue to develop operation plans and protocols |
C: 174. Hatchery Operations and Facility Plans |
|
01/31/2014 |
01/31/2014 |
Conduct and document maintenance and repair activities |
D: 61. Subcontract O&M for maintenance of facilities |
|
01/31/2014 |
01/31/2014 |
Manage and administer project, February 1, 2012 through January 31, 2014 |
E: 119. Manage and Administer 2012-2014 Project for Mid Columbia Coho Restoration |
|
01/31/2014 |
01/31/2014 |
Acclimated smolts released |
F: 176. Acclimation/Release: Wenatchee: Coulter Creek pond (BY 2010) |
|
06/10/2012 |
06/10/2012 |
Acclimated smolts released |
G: 176. Acclimation/Release: Wenatchee: Coulter Creek pond (BY 2011) |
|
06/10/2013 |
06/12/2013 |
Acclimated smolts released |
H: 176. Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2010) |
|
06/10/2012 |
06/10/2012 |
Acclimated smolts released |
I: 176. Acclimation/Release: Wenatchee: Beaver Creek pond (BY 2011) |
|
06/10/2013 |
06/12/2013 |
Acclimated smolts released |
J: 176. Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2010) |
|
06/09/2012 |
06/09/2012 |
Acclimated smolts released |
K: 176. Acclimation/Release: Wenatchee: Rohlfing's pond (BY 2011) |
|
06/09/2013 |
06/12/2013 |
Acclimated smolts released |
L: 176. Acclimation/Release: Wenatchee: Nason Creek wetlands (BY 2010) |
|
05/08/2012 |
05/08/2012 |
Acclimated smolts released |
M: 176. Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2010) |
|
06/11/2012 |
06/11/2012 |
Acclimated smolts released |
N: 176. Acclimation/Release: Wenatchee: Butcher Creek Pond (BY 2011) |
|
06/11/2013 |
|
Acclimated smolts released |
O: 176. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2010) |
|
04/15/2012 |
04/15/2012 |
Acclimated smolts released |
P: 176. Acclimation/Release: Wenatchee: Leavenworth NFH (BY 2011) |
|
04/15/2013 |
04/24/2013 |
Acclimated smolts released |
Q: 176. Acclimation/Release: Winthrop NFH back channel rearing (BY 2010) |
|
06/01/2012 |
06/01/2012 |
Acclimated smolts released |
R: 176. Acclimation/Release: Winthrop NFH back channel rearing (BY 2011) |
|
06/01/2013 |
06/04/2013 |
Acclimated smolts released |
S: 176. Acclimation/Release: Methow: Twisp Ponds (BY 2010) |
|
06/07/2012 |
06/07/2012 |
Acclimated smolts released |
T: 176. Acclimation/Release: Methow: Twisp Ponds (BY 2011) |
|
06/07/2013 |
05/22/2013 |
CWT tag fish BY2011 |
U: 158. Mark/Tag Animals - Subcontract CWT of approximately 1,500,000 BY11 coho pre-smolts |
|
10/30/2012 |
10/30/2012 |
CWT tag fish BY2012 |
V: 158. Mark/Tag Animals - Subcontract CWT of approximately 1,750,000 BY12 coho pre-smolts |
|
10/30/2013 |
10/30/2013 |
Collection of 2012 Coho Broodstock: Wenatchee and Methow programs |
W: 66. Trap 2012 broodstock at Dryden, Tumwater, Wells, LTP, Methow FH, Winthrop NFH, and LNFH |
|
12/08/2012 |
12/08/2012 |
Collection of 2013 Coho Broodstock: Wenatchee and Methow programs |
X: 66. Trap 2013 broodstock at Dryden, Tumwater, Wells, LTP, Methow FH, Winthrop NFH, and LNFH |
|
12/08/2013 |
12/08/2013 |
Spawn 2012 brood coho at Leavenworth NFH |
Y: 176. Spawn 2012 brood coho at Leavenworth NFH |
|
11/28/2012 |
11/28/2012 |
Spawn 2013 brood coho at Leavenworth NFH |
Z: 176. Spawn 2013 brood coho at Leavenworth NFH |
|
11/28/2013 |
11/28/2013 |
Spawn 2012 coho broodstock at Winthrop NFH |
AA: 176. Spawn 2012 brood coho at Winthrop NFH |
|
11/26/2012 |
11/26/2012 |
Spawn 2013 coho broodstock at Winthrop NFH |
AB: 176. Spawn 2013 brood coho at Winthrop NFH |
|
11/26/2013 |
11/26/2013 |
Carcass distribution for BY2013 broodstock |
AD: 44. Carcass dispersal of a portion of 2013 broodstock in the Wenatchee and 100% Methow River programs |
|
01/31/2014 |
01/31/2014 |
Transport 2012 BY eyed coho eggs to rearing facilities |
AE: 66. Transport 2012 brood eyed-eggs from incubation facilities to rearing facilities |
|
01/16/2013 |
01/16/2013 |
Transport 2013 BY eyed coho eggs to rearing facilities |
AF: 66. Transport 2013 brood eyed-eggs from incubation facilities to rearing facilities |
|
01/16/2014 |
01/16/2014 |
Coho redd counts and spawning composition for the 2012 BY |
AG: 157. Conduct spawning ground surveys for the 2012 brood in the Wenatchee Basin |
|
01/31/2013 |
01/31/2013 |
Coho redd counts and spawning composition for the 2013 BY |
AH: 157. Conduct spawning ground surveys for the 2013 brood in the Wenatchee Basin |
|
01/31/2014 |
01/31/2014 |
2012 BY coho redd counts and spawning composition |
AI: 157. Conduct spawning ground surveys for the 2012 brood in the Methow Basin |
|
12/31/2012 |
12/31/2012 |
2013 BY coho redd counts and spawning composition |
AJ: 157. Conduct spawning ground surveys for the 2013 brood in the Methow Basin |
|
12/31/2013 |
12/31/2013 |
Completed database |
AK: 157. Collect biological data from 2012 coho brood at spawning |
|
01/31/2013 |
01/31/2013 |
Completed database |
AL: 157. Collect biological data from 2013 coho brood at spawning |
|
01/31/2014 |
01/31/2014 |
CWT recovery data from the 2012 BY |
AM: 157. Extract CWT from 2012 brood coho snouts collected at spawning and on spawning ground surveys |
|
01/31/2013 |
01/31/2013 |
CWT recovery data from the 2013 BY |
AN: 157. Extract CWT from 2013 brood coho snouts collected at spawning and on spawning ground surveys |
|
01/31/2014 |
01/31/2014 |
Out-plant a portion of 2013 coho returns: LNFH ladder to Nason Creek |
AP: 66. Outplant a portion of the 2013 returns collected at LNFH to the upper Wenatchee Basin |
|
12/01/2013 |
12/01/2013 |
Juvenile fish transfer of the 2011 BY for overwintering at Leavenworth NFH |
AQ: 66. Transport BY11 coho from LCR facilities to LNFH for overwinter acclimation |
|
12/15/2012 |
12/15/2012 |
Juvenile fish transfer of the 2011 BY for overwintering at Leavenworth NFH |
AR: 66. Transport BY12 coho from LCR facilities to LNFH for overwinter acclimation |
|
12/15/2013 |
12/15/2013 |
PIT tag fish 2011 BY |
AS: 158. Mark/Tag Animals - PIT-tag 52,000 BY11 coho pre-smolts |
|
01/31/2013 |
01/31/2013 |
PIT tag fish 2012 BY |
AT: 158. Mark/Tag Animals - PIT-tag 52,000 BY12 coho pre-smolts |
|
01/31/2014 |
01/31/2014 |
Analyze data from 2011 BY |
AU: 162. Analyze and interpret M&E data from 2011 brood |
|
01/31/2013 |
01/31/2013 |
Analyze data from 2012 BY |
AV: 162. Analyze and interpret M&E data from 2012 brood |
|
01/31/2014 |
01/31/2014 |
Enter data |
AW: 160. Enter data into and maintain local databases |
|
09/30/2013 |
09/30/2013 |
Collect data from 2010 and 2011BY |
AX: 157. Collect/Generate Field and Lab Data to determine 2012 emergence timing, growth and distribution |
|
10/15/2012 |
10/15/2012 |
Collect data from 2011 and 2012BY |
AY: 157. Collect/Generate Field and Lab Data to determine 2013 emergence timing, growth and distribution |
|
10/15/2013 |
10/15/2013 |
Finalize FY 11 progress report uploaded/attached in Pisces |
AZ: 132. Submit Annual Report for the FY11 period (10/1/10 to 1/31/12) |
|
02/01/2013 |
12/31/2013 |
Finalize FY 12 progress report uploaded/attached in Pisces |
BA: 132. Submit Annual Report for the FY12 period (2/1/12 to 1/31/13) |
|
01/31/2014 |
|
Tissue analysis by CRITFC for genetic monitoring |
BB: 157. Analyze genetic tissue samples for determination of potential divergence from founding LCR pop. |
|
09/28/2012 |
09/28/2012 |
Finalize a comprehensive monitoring report uploaded/attached in Pisces |
BC: 132. Submit Comprehensive Report from feasibility to current BDP II |
|
01/31/2014 |
|
Subcontract work for water availability and water tests |
BD: 175. * Water Evaluations and cost reimbursement permit tracking for MET/WEN sites |
|
01/31/2014 |
01/31/2014 |
oversee and subcontract Butcher Creek dredging operation |
BE: 61. * % Subcontract work for Butcher Creek dredging project |
|
04/01/2014 |
03/31/2014 |
Submit drawings and/or specifications to BPA |
BF: 175. * % Project management and permitting preparation for various MET/WEN sites |
|
04/01/2014 |
11/04/2013 |