All administrative tasks fulfilled with timely quality products |
A: 119. Perform project management and administrative duties |
|
12/31/2017 |
12/31/2017 |
Assist BPA in producing Environmental Compliance documents |
B: 165. Environmental Compliance |
|
12/31/2017 |
12/31/2017 |
USFS EC Support on YN Fisheries Projects |
E: 165. FY 17 USFS NEPA 2016-164 |
|
12/31/2017 |
12/31/2017 |
Upper Twisp River Habitat Assessment Report |
F: 115. Upper Twisp River Habitat Assessment 2016-162 |
|
12/31/2017 |
12/31/2017 |
Draft and Final set of Engineered Construction Plans |
G: 175. Peshastin 2.7 Design 2016-160 |
|
12/31/2017 |
|
Draft and Final set of Engineered Construction Plans |
H: 175. Skinney Creek Design 2015-144 |
|
12/31/2017 |
|
Construction Management and Monitoring Plan |
K: 100. Signal Peak Engineering and Construction Oversight 2013-108 |
|
12/31/2017 |
07/31/2017 |
Completed channel construction |
L: 30. Signal Peak Side-Channel Construction 2013-108 |
|
12/31/2017 |
07/31/2017 |
Complete Signal Peak Rip-Rap Enhancement Sites A & B |
M: 29. Signal Peak Rip-Rap Enhancement Construction 2013-108 |
|
12/31/2017 |
07/31/2017 |
Construction Management and Monitoring Plan |
N: 100. Upper Burns Engineering and Construction Oversight 2013-107 |
|
12/31/2017 |
07/31/2017 |
Complete the Upper Burns Rip-Rap Enhancement Construction Project |
O: 29. Upper Burns Rip-Rap Enhancement Construction 2013-107 |
|
12/31/2017 |
07/31/2017 |
Tillicum Creek Fan Construction Designs |
P: 175. Tillicum Creek Fan Design 2016-161 |
|
12/31/2017 |
|
Final Design Set and Monitoring Plan |
Q: 175. Early Winters Creek - Twenty Below Engineering 2014-117 |
|
12/31/2017 |
|
Construction Management and Monitoring Plan |
T: 100. Chewuch River Mile 15.5-17 Fish Enhancement Construction Oversight 2012-97 |
|
12/31/2017 |
12/31/2017 |
Create side channel |
U: 29. Chewuch River Mile 15.5-17 Fish Enhancement Side Channel Construction 2012-97 |
|
12/31/2017 |
12/31/2017 |
Completed APEX and LWS Construction |
V: 30. Chewuch River Mile 15.5-17 Fish Enhancement ELS Construction 2012-97 |
|
12/31/2017 |
12/31/2017 |
Draft and Final set of Engineered Construction Plans |
W: 175. Chewuch River Mile 17-20 Fish Enhancement Project Design 2015-140 |
|
12/31/2017 |
12/31/2017 |
Confidential Water Rights Evaluation |
X: 154. CCR-38229/Mod. 1 Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2017 |
|
Beaver Creek Reach Assessment Report and Data, uploaded to Pisces |
Y: 115. CCR-38229/Mod. 1 Beaver Creek Reach Assessment 2015-154 |
|
12/31/2017 |
12/31/2017 |
Final Design Set and Monitoring Plan |
Z: 175. CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 |
|
12/31/2017 |
03/01/2017 |
Bidding Assistance and Construction Management |
AA: 100. CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Construction Management (RM 11.5) 2010-39 |
|
12/31/2017 |
12/31/2017 |
500 feet of perennial side channel restored |
AB: 30. CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Construction (RM 11.5) 2010-39 |
|
12/31/2017 |
12/31/2017 |
Produce Detailed Restoration Plans Suitable for Permitting |
AC: 175. CCR-38229/Mod. 1 Twisp River - Horseshoe PHASE 2 Restoration Engineering 2010-39 |
|
12/31/2017 |
|
Produce Detailed Restoration Plans Suitable for Permitting |
AD: 175. CCR-38229/Mod. 1 Twisp River - War Creek Restoration Engineering 2015-148 |
|
12/31/2016 |
|
Construction Management Complete |
AE: 100. CCR-38229/Mod. 1 Newby Narrows Fish Habitat Project Construction Oversight-Phase 2 2015-153 |
|
12/30/2017 |
08/10/2017 |
1,200 feet of perennial flow through side channel restored |
AF: 30. CCR-38229/Mod. 1 Newby Narrows Fish Habitat Enhancement Project Construction-Phase 2 2015-153 |
|
12/31/2017 |
08/10/2017 |
Construction Management Complete |
AG: 100. CCR-38229/Mod. 1 Big Valley South Construction Oversight 2012-101 |
|
12/30/2017 |
08/30/2017 |
Mainstem Channel Complexity Enhancement |
AH: 29. CCR-38229/Mod. 1 Big Valley South Habitat Complexity 2012-101 |
|
12/30/2017 |
08/15/2017 |
Cable Tram Removal |
AI: 180. CCR-38229/Mod. 1 Big Valley South Structure Removal 2012-101 |
|
08/01/2017 |
08/01/2017 |
Produce Monitoring Plan |
AJ: 175. CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Engineering - 2012-102 |
|
12/31/2017 |
09/27/2017 |
Construction Management |
AK: 100. CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Construction Oversight - 2012-102 |
|
12/31/2017 |
09/27/2017 |
Side Channel Enhancement and Restoration |
AL: 30. CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Construction 2015-127 |
|
12/31/2017 |
08/15/2017 |
Produce Monitoring Plan (Including As-Builts & Updated Design Report) |
AM: 175. CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Design Engineering 2009-29 |
|
12/31/2017 |
09/27/2017 |
Provide Construction Oversight management |
AN: 100. CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Construction Management 2009-29 |
|
07/31/2017 |
07/31/2017 |
Implement the 3-D LWM Revisited Habitat Enhancement Project |
AO: 29. CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Habitat Enhancement Project Construction 2009-29 |
|
08/31/2017 |
07/31/2017 |