56662 REL 88: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | A: 119. Perform project management and administrative duties | 12/31/2017 | 12/31/2017 | |
Assist BPA in producing Environmental Compliance documents | B: 165. Environmental Compliance | 12/31/2017 | 12/31/2017 | |
USFS EC Support on YN Fisheries Projects | E: 165. FY 17 USFS NEPA 2016-164 | 12/31/2017 | 12/31/2017 | |
Upper Twisp River Habitat Assessment Report | F: 115. Upper Twisp River Habitat Assessment 2016-162 | 12/31/2017 | 12/31/2017 | |
Draft and Final set of Engineered Construction Plans | G: 175. Peshastin 2.7 Design 2016-160 | 12/31/2017 | ||
Draft and Final set of Engineered Construction Plans | H: 175. Skinney Creek Design 2015-144 | 12/31/2017 | ||
Construction Management and Monitoring Plan | K: 100. Signal Peak Engineering and Construction Oversight 2013-108 | 12/31/2017 | 07/31/2017 | |
Completed channel construction | L: 30. Signal Peak Side-Channel Construction 2013-108 | 12/31/2017 | 07/31/2017 | |
Complete Signal Peak Rip-Rap Enhancement Sites A & B | M: 29. Signal Peak Rip-Rap Enhancement Construction 2013-108 | 12/31/2017 | 07/31/2017 | |
Construction Management and Monitoring Plan | N: 100. Upper Burns Engineering and Construction Oversight 2013-107 | 12/31/2017 | 07/31/2017 | |
Complete the Upper Burns Rip-Rap Enhancement Construction Project | O: 29. Upper Burns Rip-Rap Enhancement Construction 2013-107 | 12/31/2017 | 07/31/2017 | |
Tillicum Creek Fan Construction Designs | P: 175. Tillicum Creek Fan Design 2016-161 | 12/31/2017 | ||
Final Design Set and Monitoring Plan | Q: 175. Early Winters Creek - Twenty Below Engineering 2014-117 | 12/31/2017 | ||
Construction Management and Monitoring Plan | T: 100. Chewuch River Mile 15.5-17 Fish Enhancement Construction Oversight 2012-97 | 12/31/2017 | 12/31/2017 | |
Create side channel | U: 29. Chewuch River Mile 15.5-17 Fish Enhancement Side Channel Construction 2012-97 | 12/31/2017 | 12/31/2017 | |
Completed APEX and LWS Construction | V: 30. Chewuch River Mile 15.5-17 Fish Enhancement ELS Construction 2012-97 | 12/31/2017 | 12/31/2017 | |
Draft and Final set of Engineered Construction Plans | W: 175. Chewuch River Mile 17-20 Fish Enhancement Project Design 2015-140 | 12/31/2017 | 12/31/2017 | |
Confidential Water Rights Evaluation | X: 154. CCR-38229/Mod. 1 Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 | 12/31/2017 | ||
Beaver Creek Reach Assessment Report and Data, uploaded to Pisces | Y: 115. CCR-38229/Mod. 1 Beaver Creek Reach Assessment 2015-154 | 12/31/2017 | 12/31/2017 | |
Final Design Set and Monitoring Plan | Z: 175. CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 | 12/31/2017 | 03/01/2017 | |
Bidding Assistance and Construction Management | AA: 100. CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Construction Management (RM 11.5) 2010-39 | 12/31/2017 | 12/31/2017 | |
500 feet of perennial side channel restored | AB: 30. CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Construction (RM 11.5) 2010-39 | 12/31/2017 | 12/31/2017 | |
Produce Detailed Restoration Plans Suitable for Permitting | AC: 175. CCR-38229/Mod. 1 Twisp River - Horseshoe PHASE 2 Restoration Engineering 2010-39 | 12/31/2017 | ||
Produce Detailed Restoration Plans Suitable for Permitting | AD: 175. CCR-38229/Mod. 1 Twisp River - War Creek Restoration Engineering 2015-148 | 12/31/2016 | ||
Construction Management Complete | AE: 100. CCR-38229/Mod. 1 Newby Narrows Fish Habitat Project Construction Oversight-Phase 2 2015-153 | 12/30/2017 | 08/10/2017 | |
1,200 feet of perennial flow through side channel restored | AF: 30. CCR-38229/Mod. 1 Newby Narrows Fish Habitat Enhancement Project Construction-Phase 2 2015-153 | 12/31/2017 | 08/10/2017 | |
Construction Management Complete | AG: 100. CCR-38229/Mod. 1 Big Valley South Construction Oversight 2012-101 | 12/30/2017 | 08/30/2017 | |
Mainstem Channel Complexity Enhancement | AH: 29. CCR-38229/Mod. 1 Big Valley South Habitat Complexity 2012-101 | 12/30/2017 | 08/15/2017 | |
Cable Tram Removal | AI: 180. CCR-38229/Mod. 1 Big Valley South Structure Removal 2012-101 | 08/01/2017 | 08/01/2017 | |
Produce Monitoring Plan | AJ: 175. CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Engineering - 2012-102 | 12/31/2017 | 09/27/2017 | |
Construction Management | AK: 100. CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Construction Oversight - 2012-102 | 12/31/2017 | 09/27/2017 | |
Side Channel Enhancement and Restoration | AL: 30. CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Construction 2015-127 | 12/31/2017 | 08/15/2017 | |
Produce Monitoring Plan (Including As-Builts & Updated Design Report) | AM: 175. CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Design Engineering 2009-29 | 12/31/2017 | 09/27/2017 | |
Provide Construction Oversight management | AN: 100. CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Construction Management 2009-29 | 07/31/2017 | 07/31/2017 | |
Implement the 3-D LWM Revisited Habitat Enhancement Project | AO: 29. CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Habitat Enhancement Project Construction 2009-29 | 08/31/2017 | 07/31/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Coho (O. kisutch) - Unspecified Population |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Perform project management and administrative duties | 10/01/2016 | ||||||
B | 165 | Environmental Compliance | 10/01/2016 | ||||||
C | 185 | Periodic Status Reports for BPA | 10/01/2016 | ||||||
D | 132 | Annual Progress Report (submitted via other contract) | 10/01/2016 | ||||||
E | 165 | FY 17 USFS NEPA 2016-164 | 10/01/2016 | ||||||
F | 115 | Upper Twisp River Habitat Assessment 2016-162 | 05/05/2017 | ||||||
G | 175 | Peshastin 2.7 Design 2016-160 | 10/01/2016 | ||||||
H | 175 | Skinney Creek Design 2015-144 | 10/01/2016 | ||||||
I | 175 | Nason Confluence Design 2013-105 | 10/01/2016 | ||||||
J | 175 | Chiwawa Fan Design 2016-165 | 10/01/2016 | ||||||
K | 100 | Signal Peak Engineering and Construction Oversight 2013-108 | 10/01/2016 | ||||||
L | 30 | Signal Peak Side-Channel Construction 2013-108 | 07/01/2017 | ||||||
M | 29 | Signal Peak Rip-Rap Enhancement Construction 2013-108 | 07/12/2017 | ||||||
N | 100 | Upper Burns Engineering and Construction Oversight 2013-107 | 10/01/2016 | ||||||
O | 29 | Upper Burns Rip-Rap Enhancement Construction 2013-107 | 07/31/2017 | ||||||
P | 175 | Tillicum Creek Fan Design 2016-161 | 10/01/2016 | ||||||
Q | 175 | Early Winters Creek - Twenty Below Engineering 2014-117 | 10/01/2016 | ||||||
R | 100 | Early Winters Creek - Twenty Below Construction Management 2014-117 | 10/01/2016 | ||||||
S | 29 | Early Winters Creek - Twenty Below Construction 2014-117 | |||||||
T | 100 | Chewuch River Mile 15.5-17 Fish Enhancement Construction Oversight 2012-97 | 10/01/2016 | ||||||
U | 29 | Chewuch River Mile 15.5-17 Fish Enhancement Side Channel Construction 2012-97 | 07/01/2017 | ||||||
V | 30 | Chewuch River Mile 15.5-17 Fish Enhancement ELS Construction 2012-97 | 07/31/2017 | ||||||
W | 175 | Chewuch River Mile 17-20 Fish Enhancement Project Design 2015-140 | 07/01/2017 | ||||||
X | 154 | CCR-38229/Mod. 1 Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 | 10/01/2016 | ||||||
Y | 115 | CCR-38229/Mod. 1 Beaver Creek Reach Assessment 2015-154 | 05/08/2017 | ||||||
Z | 175 | CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 | 10/01/2016 | ||||||
AA | 100 | CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Construction Management (RM 11.5) 2010-39 | 10/01/2016 | ||||||
AB | 30 | CCR-38229/Mod. 1 Twisp Horseshoe Side Channel Construction (RM 11.5) 2010-39 | 06/22/2017 | ||||||
AC | 175 | CCR-38229/Mod. 1 Twisp River - Horseshoe PHASE 2 Restoration Engineering 2010-39 | 10/01/2016 | ||||||
AD | 175 | CCR-38229/Mod. 1 Twisp River - War Creek Restoration Engineering 2015-148 | 10/01/2016 | ||||||
AE | 100 | CCR-38229/Mod. 1 Newby Narrows Fish Habitat Project Construction Oversight-Phase 2 2015-153 | 10/01/2016 | ||||||
AF | 30 | CCR-38229/Mod. 1 Newby Narrows Fish Habitat Enhancement Project Construction-Phase 2 2015-153 | 05/08/2017 | ||||||
AG | 100 | CCR-38229/Mod. 1 Big Valley South Construction Oversight 2012-101 | 10/01/2016 | ||||||
AH | 29 | CCR-38229/Mod. 1 Big Valley South Habitat Complexity 2012-101 | 05/08/2017 | ||||||
AI | 180 | CCR-38229/Mod. 1 Big Valley South Structure Removal 2012-101 | 05/08/2017 | ||||||
AJ | 175 | CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Engineering - 2012-102 | 05/08/2017 | ||||||
AK | 100 | CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Construction Oversight - 2012-102 | 10/01/2016 | ||||||
AL | 30 | CCR-38229/Mod. 1 Meacham Flats Habitat Restoration Construction 2015-127 | 05/08/2017 | ||||||
AM | 175 | CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Design Engineering 2009-29 | 05/08/2017 | ||||||
AN | 100 | CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Construction Management 2009-29 | 10/01/2016 | ||||||
AO | 29 | CCR-38229/Mod. 1 Entiat 3-D LWM Revisited Habitat Enhancement Project Construction 2009-29 | 05/08/2017 |