All administrative tasks fulfilled with timely quality products |
B: 119. Perform project management and administrative duties |
|
12/31/2019 |
|
USFS Environmental Compliance on Yakama Nation Fisheries Projects (BPA's EC covered in REL 161) |
D: 165. FY 19 USFS NEPA 2017-164 (BPA's EC covered in REL 161) |
|
12/31/2019 |
12/31/2019 |
Final Restoration Plan for Stormy A Project Site |
E: 175. Stormy Area A - USFS Re-Design 2014-125 |
|
12/31/2019 |
07/01/2019 |
Construction Management |
F: 100. Stormy Area A - USFS Construction Management 2014-125 |
|
12/31/2019 |
09/16/2019 |
Stormy A Restoration |
G: 29. Stormy Area A - USFS Construction 2014-125 |
|
12/31/2019 |
08/17/2019 |
Concept Level Designs and Report for Leavenworth Area Project |
H: 175. Leavenworth Area Design 2017-185 |
|
12/31/2019 |
|
Lower Wenatchee Reach 3 Concept Level Restoration Plan |
I: 175. Lower Wenatchee River Reach 3 Design 2017-186 |
|
12/31/2019 |
|
Skinney Creek Finalized Restoration Plan |
J: 175. Skinney Creek Design 2015-144 |
|
12/31/2019 |
|
Chiwawa Fan Finalized Restoration Plan |
K: 175. Chiwawa Fan - Design 2016-165 |
|
12/31/2019 |
|
Nason Confluence Finalized Restoration Plan |
L: 175. Nason Confluence - Design 2013-105 |
|
12/31/2019 |
12/31/2019 |
Nason Creek N1 DOT Concept Level Restoration Plan |
M: 175. Nason Creek N1 DOT Design 2018-198 |
|
12/31/2019 |
12/31/2019 |
Final Restoration Plan for Chewuch RM 4.6 |
N: 175. Chewuch RM 4.6 Design 2017-176 |
|
12/31/2019 |
12/31/2019 |
Conceptual Restoration Plan for the Chewuch Floodplain Ranch Project |
O: 175. Chewuch Floodplain Ranch Design 2019-202 |
|
12/31/2019 |
12/31/2019 |
Updated Barrier Removal Designs and Report |
P: 175. Eight Mile Barrier Removal Design 2015-141 |
|
12/31/2019 |
|
Finalized Restoration Plan, Construction Oversight and Develop Monitoring Plan |
Q: 175. Beaver Creek Reach 5 - Design 2017-171 |
|
12/31/2019 |
12/18/2019 |
Construction Management |
R: 100. Beaver Creek Reach 5 - Construction Oversight 2017-171 |
|
12/31/2019 |
09/30/2019 |
Beaver Creek Reach 5 Restoration |
S: 29. Beaver Creek Reach 5 Construction 2017-171 |
|
12/31/2019 |
09/19/2019 |
Finalize Restoration Plan for the Fawn Creek Project Area |
T: 175. Fawn Creek Project - Design 2015-147 |
|
12/31/2019 |
|
Finalize Restoration Plan for the Twisp River War Creek Project |
U: 175. Twisp River - War Creek Area Restoration Design 2015-148 |
|
12/31/2019 |
|
Finalized Restoration Plan for Twisp Horseshoe USFS Lands |
V: 175. Twisp Horseshoe Phase 2 (USFS) Restoration Engineering 2010-39 |
|
12/31/2019 |
|
Confidential Water Rights Evaluation |
W: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2019 |
|
Alternative Water Delivery Feasibility Assessment |
X: 175. Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152 |
|
12/31/2019 |
|
Finalized Restoration Plan for the Alder Creek Floodplain |
Y: 175. M2 Alder Creek Floodplain Design 2019-201 |
|
12/31/2019 |
|
Partial completion of BPA's land acquisition process |
Z: 172. Western Rivers Methow Acquisition Support 2018-200 |
|
12/31/2019 |
|
Wolf Creek Reach Assessment Report |
AA: 115. New CCR 41925 - Wolf Creek Reach Assessment 2019-206 |
|
12/31/2019 |
|
Permit Level Restoration Plan for the Deadhorse Project Area |
AB: 175. New CCR 41925 - Upper Wenatchee Deadhorse Tunnel Design 2012-103 |
|
12/31/2019 |
|
Conceptual Restoration Plan for the Chiwawa River Outlet Project Area |
AC: 175. New CCR 41925 - Chiwawa Outlet Conceptual Design 2019-205 |
|
12/31/2019 |
|
Permit and Construction Level Restoration Plans for the Upper Twisp Project Area |
AD: 175. New CCR 41925 - Upper Twisp River and Tributaries Project Design (USFS Projects) 2016-162 |
|
12/31/2019 |
|
Permit and Construction Level Restoration Plans for the Little Bridge Creek Project Area |
AE: 175. New CCR 41925 - Little Bridge Creek Design (USFS Projects) 2017-182 |
|
12/31/2019 |
|
Construction Management Complete |
AF: 100. New CCR 41925 - Nason Upper Kahler Construction Oversight 2017-166 |
|
12/31/2019 |
|
Permit and Construction Level Restoration Plans for the Upper Stillwaters Project Area |
AG: 175. New CCR 41925 - Entiat Upper Stillwaters USFS Design 2017-167 |
|
12/31/2019 |
|
Fish Passage Technical Memo |
AH: 115. New CCR 41925 - Nason Creek Anadromous Barrier Assessment 2019-207 |
|
12/31/2019 |
|