All administrative tasks fulfilled with timely quality products |
B: 119. Perform project management and administrative duties |
|
12/31/2018 |
12/31/2018 |
USFS EC Support on Yakama Nation Fisheries Projects (BPA's EC covered in REL 111) |
D: 165. FY 18 USFS NEPA 2017-165 (BPA's EC covered in REL 111) |
|
12/31/2018 |
12/31/2018 |
Conceptual Restoration Plan for Upper Stillwaters USFS Lands |
E: 175. Entiat Upper Stillwaters USFS Design 2017-167 |
|
12/31/2018 |
12/31/2018 |
Permit Level Restoration Plan for Stormy A Project Site |
F: 175. Stormy Area A - USFS Re-Design 2014-125 |
|
12/31/2018 |
12/31/2018 |
Restoration and Monitoring Plan for Tillicum Creek Fan |
G: 175. Tillicum Creek Fan Engineering 2016-161 |
|
12/31/2018 |
09/25/2018 |
Construction Management |
H: 100. Tillicum Creek Fan Construction Oversight 2016-161 |
|
12/31/2018 |
07/27/2018 |
Tillicum Fan Restoration |
I: 29. Tillicum Creek Fan Construction 2016-161 |
|
12/31/2018 |
07/27/2018 |
Mad River Reach Assessment Report |
J: 115. Mad River Reach Assessment 2017-172 |
|
12/31/2018 |
12/31/2018 |
Upper Nason Creek Reach Assessment Report |
N: 115. Upper Nason Habitat Assessment 2017-192 |
|
12/31/2018 |
12/31/2018 |
Final Restoration Designs and Monitoring Plan for the Upper Kahler Project |
O: 175. Upper Kahler - Design 2017-166 |
|
12/31/2018 |
12/31/2018 |
Restoration Plan for Peshastin RM 2.7 |
P: 175. Peshastin RM 2.7 - Design 2016-160 |
|
12/31/2018 |
07/03/2018 |
Construction Management |
Q: 100. Peshastin RM 2.7 - Construction Management 2016-160 |
|
12/31/2018 |
09/04/2018 |
Construct the Peshastin RM 2.7 Project |
R: 30. Peshastin RM 2.7 - Construction 2016-160 |
|
12/31/2018 |
08/15/2018 |
Skinney Creek Finalized Restoration Plan |
S: 175. Skinney Creek Design 2015-144 |
|
12/31/2018 |
|
Nason Confluence Finalized Restoration Plan |
T: 175. Nason Confluence - Design 2013-105 |
|
12/31/2018 |
|
Chiwawa Fan Finalized Restoration Plan |
U: 175. Chiwawa Fan - Design 2016-165 |
|
12/31/2018 |
|
Permit Level Restoration Plan for Chewuch RM 4.6 |
V: 175. Chewuch RM 4.6 Design 2017-176 |
|
12/31/2018 |
12/31/2018 |
Conceptual Restoration Plan for Chewuch RM 8 to 9 Project |
W: 175. Chewuch RM 8 to 9 Design 2017-177 |
|
12/31/2018 |
12/31/2018 |
Construction Management |
X: 100. Chewuch RM 17 to 20 Construction Oversight 2015-140 |
|
12/31/2018 |
12/31/2018 |
Construct the Chewuch RM17-20 Project |
Y: 29. Chewuch RM 17 to 20 Construction 2015-140 |
|
12/31/2018 |
07/27/2018 |
Upper Chewuch River Habitat Assessment Report |
Z: 115. Upper Chewuch Habitat Assessment 2017-180 |
|
12/31/2018 |
12/31/2018 |
Beaver Creek Reach 5 Finalized Restoration Plan |
AA: 175. Beaver Creek Reach 5 - Design 2017-171 |
|
12/31/2018 |
12/31/2018 |
Finalized Restoration Plan for the Fawn Creek Project Area |
AD: 175. Fawn Creek Project - Design 2015-147 |
|
12/31/2018 |
|
Concepts Level Restoration Plan for Poorman Creek Road Project Area |
AF: 175. Poorman Creek Road Side Channel Project - Design 2012-100 |
|
12/31/2018 |
12/31/2018 |
River Recreation Use Assessment Report |
AG: 174. Twisp to Carlton River Recreation Assessment 2017-174 |
|
12/31/2018 |
12/31/2018 |
Concepts Level Restoration Plan for the Upper Twisp River Assessment Area |
AH: 175. Upper Twisp River and Tributaries Project Design (USFS Projects) 2016-162 |
|
12/31/2018 |
12/31/2018 |
Finalized Restoration Plan for the Twisp River War Creek Area |
AI: 175. Twisp River - War Creek Area Restoration Design 2015-148 |
|
12/31/2018 |
12/31/2018 |
Concepts Level Restoration Plan for Little Bridge Creek USFS Lands |
AJ: 175. Little Bridge Creek Design (USFS Projects) 2017-182 |
|
12/31/2018 |
12/31/2018 |
Finalized Restoration Plan for Twisp Horseshoe USFS Lands |
AK: 175. Twisp Horseshoe Phase 2 (USFS) Restoration Engineering 2010-39 |
|
12/31/2018 |
12/31/2018 |
Construction Management |
AL: 100. Twisp Horseshoe Phase 1 Culvert Construction Oversight 2010-39 |
|
12/31/2018 |
12/31/2018 |
Side Channel Restored |
AM: 30. Twisp Horseshoe Phase 1 Culvert Construction 2010-39 |
|
12/31/2018 |
08/31/2018 |
Confidential Water Rights Evaluation |
AP: 154. Methow Basin EWD Instream Flow Project - Water Rights Assessment 2015-152 |
|
12/31/2018 |
12/31/2018 |
Alternative Water Delivery Feasibility Assessment |
AQ: 175. Methow Basin EWD Instream Flow Project - Eng. Feasibility Assessment 2015-152 |
|
12/31/2018 |
|
Permit Level Restoration Plan for the M2 Twisp to Carlton Project Sites |
AS: 175. M2 Twisp To Carlton Projects Design 2017-191 |
|
12/31/2018 |
12/31/2018 |
Finalized Restoration Plan for the Wolf Creek Ponds |
AT: 175. Wolf Creek Ponds Design 2017-188 |
|
12/31/2018 |
12/31/2018 |
Conceptual Restoration Plan for Upper Wenatchee Deadhorse Project |
AU: 175. NEW CCR 40108/Mod. 1 - Upper Wenatchee Deadhorse Tunnel Design 2012-103 |
|
12/31/2018 |
|
Restoration and Monitoring Plan for Beaver Creek DOT Project |
AV: 175. NEW CCR 40108/Mod. 1 - Beaver Creek DOT Design Replacement 2017-194 |
|
12/31/2018 |
|
Construction Management Complete |
AW: 100. NEW CCR 40108/Mod. 1 - Beaver Creek DOT Construction Management 2017-194 |
|
12/31/2018 |
|
Construct the Beaver Creek DOT Project |
AX: 29. NEW CCR 40108/Mod. 1 - Beaver Creek DOT Construction 2017-194 |
|
12/31/2018 |
|
Partial completion of BPA's land acquisition process |
AY: 172. NEW CCR 40108/Mod. 1 - Western Rivers Methow Acquisition Support 2018-200 |
|
12/31/2018 |
|