Ensure Environmental Compliance Requirements Have Been Met |
A: 165. Ensure Environmental Compliance Requirements have been met |
|
02/28/2021 |
02/28/2021 |
Produce Propagation, Rearing, & Outplanting Plan |
B: 174. Produce Propagation, Rearing, & Outplanting Plan |
|
06/01/2020 |
06/01/2020 |
Larval/Juvenile Lamprey Surveys in the YN Ceded Lands |
C: 157. Larval/Juvenile lamprey surveys in the YN Ceded Lands (with a subcontractor) |
|
02/28/2021 |
02/28/2021 |
Lamprey Survey and Rescue in Irrigation |
D: 28. Lamprey Survey and Salvage in Irrigation Diversions |
|
02/28/2021 |
02/28/2021 |
Participation in Public Outreach |
E: 99. Participation in Public Outreach |
|
02/28/2021 |
02/28/2021 |
Participate in Local and Regional Efforts |
F: 161. Participate in Local and Regional Efforts |
|
02/28/2021 |
02/28/2021 |
PIT & Floy Tag Adult Lamprey |
G: 158. PIT and Floy Tag Adult Lamprey |
|
02/28/2021 |
02/28/2021 |
PIT Tag juvenile/larval lamprey |
H: 158. PIT, VIE & Acoustic Tag Juvenile Lamprey |
|
02/28/2021 |
02/28/2021 |
Conduct the 3-Step Process for Lamprey Artificial Propagation Activities (with CRITFC) |
I: 196. Conduct the 3-Step Process for Lamprey Artificial Propagation Activities (with CRITFC) |
|
02/28/2021 |
02/28/2021 |
Research into Artificial Propagation and Rearing |
J: 176. Rearing - Research into Artificial Propagation and Juvenile Propagation |
|
02/28/2021 |
02/28/2021 |
Outplant larval lamprey in Yakima Subasin |
K: 176. Release - Larval lamprey outplanting |
|
02/28/2021 |
02/28/2021 |
Adult lamprey translocation |
L: 66. Translocate adult lamprey from Columbia River |
|
02/28/2021 |
02/28/2021 |
Adult lamprey used for artificial propagation research |
M: 66. Collect Adult Lamprey for research into artifical propagation |
|
02/28/2021 |
02/28/2021 |
Data Input and Analysis |
N: 162. Data Input and Analysis |
|
02/28/2021 |
02/28/2021 |
Deliverable: S. Maintain and monitor lamprey passage structures |
O: 186. Maintain and monitor lamprey passage structures |
|
02/28/2021 |
02/28/2021 |
Produce Design and/or Specifications for Lamprey Passage |
P: 175. Produce adult lamprey passage designs and structures (Klickitat Subbasin, with a subcontractor) |
|
12/31/2020 |
09/30/2020 |
Fabricate and install vertical wetted wall adult lamprey passage structure at Wapato diversion dam |
Q: 184. Wapato: Fabrication of adult lamprey passage structure for Wapato diversion dam (with a subcontractor) |
|
02/28/2021 |
02/28/2021 |
Fabricate and install vertical wetted wall adult lamprey passage structure at Sunnyside diversion dam |
R: 184. Sunnyside: Fabrication of adult lamprey passage structure for Sunnyside diversion dam (with a subcontractor) |
|
02/28/2021 |
02/28/2021 |
Cultural and Scientific Draft Report |
S: 141. Other Reports for BPA |
|
02/28/2021 |
02/28/2021 |
Deliverable: R. Produce Journal Articles |
T: 183. Produce Journal Articles |
|
02/28/2021 |
02/28/2021 |
Effective implementation management and timely contract administration |
U: 119. Manage and Administer Project |
|
02/28/2021 |
02/28/2021 |
Completed 2019 Annual Report |
V: 132. Submit Annual Report for CY2019 (Jan 2019 to Dec 2019) |
|
05/01/2020 |
06/17/2020 |