Province | Subbasin | % |
---|---|---|
Columbia Cascade | Methow | 40.00% |
Wenatchee | 60.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All the appropriate coverage needed for construction work at Blue Buck, Scaffold Ridge, and Newby | A: 165. NEPA, SEPA, and ESA review and approval | 06/17/2014 | 06/17/2014 | |
Fulfill all administrative tasks with quality products and in a timely manner. | B: 119. Monitor multiple construction operations in the Methow and Wenatchee | 01/31/2015 | 01/31/2015 | |
Construct/develop/install surface water diversion at Newby site for coho releases | D: 171. Newby Pond-intake installation for new acc. pond | 10/18/2014 | ||
Dredge out excess material to increase pond volume for coho acclimation | E: 171. Blue Buck Pond excavation-Beaver Creek-Methow | 09/30/2014 | ||
Construct/develop/install upgraded surface water intake at Beaver site for coho releases | G: 171. Beaver Cr. Pond (WEN) -intake installation/modification | 09/30/2014 | ||
subcontract for native plantings-revegetation | I: 47. subcontract revegetation plantings for the sites identified in 2013 | 10/31/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | NEPA, SEPA, and ESA review and approval | 07/01/2013 | ||||||
B | 119 | Monitor multiple construction operations in the Methow and Wenatchee | 07/01/2013 | ||||||
C | 171 | Scaffold Ridge Pond Construction-Twisp Drainage-Methow | |||||||
D | 171 | Newby Pond-intake installation for new acc. pond | 06/27/2014 | ||||||
E | 171 | Blue Buck Pond excavation-Beaver Creek-Methow | 06/27/2014 | ||||||
F | 185 | Periodic Status Reports for BPA | 07/01/2013 | ||||||
G | 171 | Beaver Cr. Pond (WEN) -intake installation/modification | |||||||
H | 132 | Report waived by COTR | 07/01/2013 | ||||||
I | 47 | subcontract revegetation plantings for the sites identified in 2013 | 06/27/2014 |