Contract 56662 REL 21: 1996-040-00 CAP MID-COLUMBIA (COHO) REINTRODUCTION
Project Number:
Title:
Upper Columbia Production
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Methow 40.00%
Wenatchee 60.00%
Contract Number:
56662 REL 21
Contract Title:
1996-040-00 CAP MID-COLUMBIA (COHO) REINTRODUCTION
Contract Continuation:
Previous: Next:
n/a
  • 56662 REL 72: 1996-040-00 CAP MID-C COHO HATCHERY CONSTRUCTION
Contract Status:
Closed
Contract Description:
As part of the long term coho reintroduction plan, several sites will need to be constructed and/or rehabilitated for acclimation during the next 3 years.  While all the work in this 2013 contracting period will occur in the Methow basin since this part of the program has met the biological criteria for implementation of NPIP phase, according to the MCCRP Master Plan.  While most proposed sites are being evaluated for groundwater availability, wetland delineations, etc., on-the-ground construction for the 2013 and 2014 season will occur at two locations in the Methow River Basin and one in the Wenatchee; Newby and Blue Buck in the Methow and Beaver Creek in the Wenatchee.  For the Methow, the latter (Blue Buck)  is located on Beaver Creek while the previous two are sites located within the Twisp watershed.  Detailed site specification will be included in the following SoW.
Account Type(s):
Capital
Contract Start Date:
06/01/2013
Contract End Date:
01/31/2015
Current Contract Value:
$5,545
Expenditures:
$5,545

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Michelle Guay Bonneville Power Administration Yes Env. Compliance Lead mxguay@bpa.gov (503) 230-3459
Tana Hoptowit Yakama Confederated Tribes Yes Administrative Contact hopt@yakamafish-nsn.gov (509) 865-5121x6318
Cory Kamphaus Yakama Confederated Tribes Yes Contract Manager kamc@yakamafish-nsn.gov (509) 548-9413x102
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Keely Murdoch Yakama Confederated Tribes Yes Technical Contact murk@yakamafish-nsn.gov (509) 548-2206
Thomas Scribner Yakama Confederated Tribes Yes Supervisor scrt@yakamafish-nsn.gov (503) 331-9850
Gregory Wolfe Yakama Confederated Tribes No Interested Party wolg@yakamafish-nsn.gov (509) 881-0674


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All the appropriate coverage needed for construction work at Blue Buck, Scaffold Ridge, and Newby A: 165. NEPA, SEPA, and ESA review and approval 06/17/2014 06/17/2014
Fulfill all administrative tasks with quality products and in a timely manner. B: 119. Monitor multiple construction operations in the Methow and Wenatchee 01/31/2015 01/31/2015
Construct/develop/install surface water diversion at Newby site for coho releases D: 171. Newby Pond-intake installation for new acc. pond 10/18/2014
Dredge out excess material to increase pond volume for coho acclimation E: 171. Blue Buck Pond excavation-Beaver Creek-Methow 09/30/2014
Construct/develop/install upgraded surface water intake at Beaver site for coho releases G: 171. Beaver Cr. Pond (WEN) -intake installation/modification 09/30/2014
subcontract for native plantings-revegetation I: 47. subcontract revegetation plantings for the sites identified in 2013 10/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 47 Plant Vegetation
  • 4 instances of WE 171 Build, Modify, and/or Refurbish Artificial Production Facility

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 NEPA, SEPA, and ESA review and approval 07/01/2013
B 119 Monitor multiple construction operations in the Methow and Wenatchee 07/01/2013
C 171 Scaffold Ridge Pond Construction-Twisp Drainage-Methow
D 171 Newby Pond-intake installation for new acc. pond 06/27/2014
E 171 Blue Buck Pond excavation-Beaver Creek-Methow 06/27/2014
F 185 Periodic Status Reports for BPA 07/01/2013
G 171 Beaver Cr. Pond (WEN) -intake installation/modification
H 132 Report waived by COTR 07/01/2013
I 47 subcontract revegetation plantings for the sites identified in 2013 06/27/2014