Annual progress report, uploaded to Pisces |
B: 132. Annual Progress Report for 2020 |
|
05/31/2022 |
|
Completed Annual Report |
C: 132. Annual Progress Report for 2021 |
|
05/31/2022 |
|
Effective implementation management and timely contract administration |
D: 119. Manage personnel, property and subcontracts for overall UCHRP |
|
05/31/2022 |
05/31/2022 |
Collect topographic survey and create hydraulic model |
E: 114. UC Survey and hydraulic modeling Contract - 2010-58 |
|
05/31/2022 |
05/31/2022 |
Wetland Surveys and Reports |
F: 165. UC Wetland Delineation 2010-44 |
|
05/31/2022 |
05/31/2022 |
Rare Plant Surveys and Report |
G: 165. UC Rare Plant Surveys 2010-44 |
|
05/31/2022 |
05/31/2022 |
Coordinate private land access in priority reaches |
H: 191. Outreach Supporting Habitat Restoration Activities (Methow) 2009-22 |
|
05/31/2022 |
05/31/2022 |
Landowner Outreach completed |
I: 191. CCD Landowner Outreach & Coordination - 2010-60 |
|
05/31/2022 |
05/31/2022 |
Chelan NRD Support/Outreach for Wenatchee Habitat Projects |
J: 191. Outreach Supporting Habitat Restoration Activities (Wenatchee) CCNRD 2012-98 |
|
05/31/2022 |
05/31/2022 |
Conduct land pre-acquisition activities to determine suitability of land purchases for the UCHRP. |
K: 172. UC Lands Acquisition Support 2012-104 |
|
05/31/2022 |
05/31/2022 |
Conduct Appraisals |
L: 172. UC Appraisals 2018-197 |
|
05/31/2022 |
05/31/2022 |
Produce Survey |
M: 172. UC Professional Land Survey Contract 2015-128 |
|
05/31/2022 |
05/31/2022 |
Produce Cultural Surveys |
N: 165. UC Cultural Resource Contract 2014-118 |
|
05/31/2022 |
05/31/2022 |
Provide Scientific Support for YN UCHRP Projects |
O: 122. UC On-Call Scientific Support (Review and Recommendation) 2016-159 |
|
05/31/2022 |
05/31/2022 |
Provide HAZ MAT Inspection |
P: 165. UC On-Call Haz Mat Review 2016-158 |
|
05/31/2022 |
05/31/2022 |
Provide Coordination on Restoration Work Proposed by the YN on WDFW Land |
Q: 122. WDFW MOU Review 2016-157 |
|
05/31/2022 |
05/31/2022 |
Produce Restoration Designs |
R: 175. UC Small Project Design - 2010-57 |
|
05/31/2022 |
05/31/2022 |
Post Implementation Monitoring of Habitat Projects |
S: 115. UC Post Implementation Field Monitoring 2012-85 |
|
05/31/2022 |
05/31/2022 |
Engineering Support Services |
T: 122. On-call Engineering Support Services 2009-17 |
|
05/31/2022 |
05/31/2022 |
Groundwater pump tests complete |
U: 148. Install Piezometer Wells and Conduct Groundwater Pump Tests 2010-37 |
|
05/31/2022 |
05/31/2022 |
LWD Procurement and Hauling |
V: 29. Large Wood Procurement - 2010-59 |
|
05/31/2022 |
05/31/2022 |
Large Wood Stockpile Locations Secured by Rental Agreements |
W: 29. UC Large Wood Storage 2015-131 |
|
05/31/2022 |
05/31/2022 |
Produce Native Plant Restoration and Soil Bio-Engineering Design, Materials, and Installation |
X: 47. UC Native Plant Restoration and Soil Bio-Engineering - 2010-62 |
|
05/31/2022 |
05/31/2022 |
Vegetation Maintenance |
Y: 198. Methow Subbasin Vegetation Maintenance - 2010-43 |
|
05/31/2022 |
05/31/2022 |
Vegetation Maintenance |
Z: 198. Vegetation Maintenance Wenatchee & Entiat 2012-84 |
|
05/31/2022 |
05/31/2022 |
Conduct Geo-Tech Services |
AA: 186. UC Sheet Pile Geo-Tech 2012-83 |
|
05/31/2022 |
05/31/2022 |
On-Call Construction Services |
AB: 186. UC On-Call Construction Services 2012-82 |
|
05/31/2022 |
05/31/2022 |
Create and Install Habitat Restoration Signs |
AC: 188. UC Project Signage 2012-95 |
|
05/31/2022 |
05/31/2022 |
Inspect and repair wells |
AD: 82. UC On-Call Well Inspection and Repair 2016-156 |
|
05/31/2022 |
05/31/2022 |
Hazard Tree Removal |
AE: 199. UC Hazard Tree Removal 2018-195 |
|
05/31/2022 |
05/31/2022 |
Create Hog Fuel Stockpiles |
AF: 47. UC Wood Mulch Production 2019-204 |
|
05/31/2022 |
05/31/2022 |
Acquisition of Fawn Creek Property |
AG: 172. Fawn Creek Acquisition 2018-200 |
|
02/28/2021 |
03/31/2021 |
Acquisition of Chewuch Floodplain Property |
AH: 172. Chewuch Floodplain Acquisition 2019-202 |
|
02/28/2021 |
03/31/2021 |
Acquisition of the Scaffold Camp #2 Property |
AI: 172. Scaffold Camp #2 Acquisition - 2019-211 |
|
05/31/2022 |
|