SOW and LIB submitted |
B: 119. Manage Restoration Projects |
|
03/31/2023 |
03/10/2023 |
List of Selected Projects (and contingency projects) to be implemented |
C: 114. Select habitat improvement actions and identify possible projects for next fiscal year |
|
03/31/2023 |
01/31/2023 |
Project databases that are maintained and up to date. |
D: 160. Update Project Database |
|
03/31/2023 |
01/31/2023 |
Disseminated data |
E: 161. Create informal summary reports and maps |
|
03/31/2023 |
03/14/2023 |
5 outreach sessions completed |
F: 99. Conduct field and classroom education at local schools |
|
03/31/2023 |
03/14/2023 |
Technical review and input provided to various policy and planning efforts |
G: 122. Input to various Tribal planning and policy efforts |
|
03/31/2023 |
03/14/2023 |
Completed environmental documentation |
H: 165. Environmental Compliance |
|
03/31/2023 |
03/14/2023 |
Completed Annual Report submitted to BPA |
I: 132. Produce Project Annual Report for FY21 Mar2021-Feb2022 |
|
03/31/2023 |
03/14/2023 |
Outmigration estimate and other data from screw traps |
J: 157. Operate rotary screw traps for steelhead |
|
03/31/2023 |
03/14/2023 |
Complete three pass surveys in Satus and Ahtanum Creeks |
K: 157. Conduct steelhead and bull trout spawner surveys |
|
03/31/2023 |
03/14/2023 |
Redd distribution and adult abundance index |
L: 162. Analyze redd count data |
|
03/31/2023 |
03/14/2023 |
Steelhead Outmigrant metrics |
M: 162. Analyze Steelhead Outmigrant Data |
|
03/31/2023 |
03/14/2023 |
Water temperature record |
N: 157. Collect water temperature data |
|
03/31/2023 |
03/14/2023 |
Weekly manual discharge measurements |
O: 157. Collect discharge measurements |
|
03/31/2023 |
03/14/2023 |
Wapato Irrigation Project diversions managed for minimum instream flow. |
P: 186. Assist with the operation of diversions and screens on Ahtanum Creek |
|
03/31/2023 |
03/14/2023 |
Water diversion managed at 6 diversions to provide minimum streamflow |
Q: 186. Assist with operation of diversions and screens on Toppenish Creek |
|
03/31/2023 |
03/14/2023 |
Functioning fences, wells, stock tanks, and habitat improvements |
R: 186. Maintain livestock wells/stock tanks/livestock fences/improved springs |
|
03/31/2023 |
03/14/2023 |
Maintain vegetation |
S: 198. Maintain pre-existing vegetation |
|
03/31/2023 |
03/14/2023 |
BDA structures |
T: 181. Wetland Meadow BDA Implementation |
|
03/31/2023 |
03/14/2023 |
Completed plans for construction |
U: 175. Pom Pom Road Removal Design Completion |
|
03/31/2023 |
|
Designs for 5 engineered logjams on Satus Creek. |
V: 175. Produce design for 5 logjams at Satus Creek. |
|
03/31/2023 |
|
Install bridge at West White Swan Road. |
W: 184. Simcoe Creek- Install bridge and realign channel at West White Swan Road |
|
12/01/2022 |
11/30/2022 |
Wood structures and instream complexity created |
X: 29. Simcoe Creek - Increase channel complexity at the South Channel of Simcoe Creek. |
|
10/31/2022 |
09/30/2022 |
Riparian Vegetation planted |
Y: 47. Simcoe Creek- Plant vegetation at Simcoe Creek South Channel Project |
|
03/31/2023 |
03/14/2023 |