Province | Subbasin | % |
---|---|---|
Columbia Cascade | Entiat | 20.00% |
Methow | 40.00% | |
Wenatchee | 40.00% |
Previous: | Next: |
---|---|
n/a |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Restored Side Channel | B: 30. M2 LRT Two Channels East Side Channel Restoration 2011-89 | 12/31/2014 | ||
Constructed Log Jam and Large Wood Placement along Riprap | C: 29. M2 LRT Two Channels ELJ Construction 2011-86 | 12/31/2014 | 12/30/2014 | |
Restored Side Channel | D: 30. M2 1890s Side Channel Restoration Construction - 2011-65 | 12/31/2014 | 12/30/2014 | |
Middle Twisp River Reach Assessment Report and Data Deliverables | E: 115. Middle Twisp River Reach Assessment 2011-77 | 12/31/2014 | 12/30/2014 | |
Design reports, outreach materials, and final Construction Documents | K: 175. Big Valley South Fish Enhancement Project 2012-101 | 12/31/2014 | 12/30/2014 | |
All administrative tasks fulfilled with timely quality products | L: 119. Project management (Covered under Personnel contract - 56662 rel 2) | 12/31/2014 | 12/30/2014 | |
Assist BPA to produce Environmental Compliance | M: 165. EC Compliance (Covered under Personnel contract - 56662 rel 2) | 12/31/2014 | 12/30/2014 | |
Design reports/models, outreach materials and various plan percentage based plan sets | O: 175. Entiat Stillwaters Design Project #1 2013-106 | 12/31/2014 | 12/30/2014 | |
Design reports/models, outreach materials and various plan percentage based plan sets. | P: 175. Entiat Stillwaters Design Project # 2 2013-107 | 12/31/2014 | 12/30/2014 | |
Design reports/models, outreach materials and various plan percentage based plan sets. | Q: 175. Entiat Stillwaters Design Project # 3 2013-108 | 12/31/2014 | 12/30/2014 | |
Groundwater Source Irrigation Well | T: 82. Twisp Poorman Creek Surface Diversion to Wells Project 2013-111 | 12/31/2014 | ||
Design reports/models, outreach materials and various plan percentage based plan sets | U: 175. Twisp Poorman Creek Floodplain Design 2013-111 | 12/31/2014 | 12/30/2014 | |
Design reports/models, outreach materials and various plan percentage based plan sets | Z: 175. Fender Mill Side Channel Project Re-Design 2010-33 | 12/31/2014 | 12/30/2014 | |
Engineered Log Structure Construction | AB: 29. Twisp River RM 3 Large Wood Enhancement 2011-64 | 12/31/2014 | 12/30/2014 | |
Continue the USFS NEPA process for public review of the Chewuch habitat Restoration projects | AC: 165. New CCR 31786 - Chewuch River USFS NEPA Process 2011-84 | 12/31/2014 | 12/30/2014 | |
Upper Methow Reach Assessment Report and Data Deliverables | AD: 115. New CCR 31786 - Upper Methow Reach Assessment 2014-116 | 12/31/2014 | 12/30/2014 | |
Engineered log structure construction | AE: 29. New CCR 31786 - Poorman Cr. Rd. Salmon Enhancement Project Construction 2012-100 | 12/31/2014 | 12/30/2014 | |
Project Concepts technical memo and project outreach materials | AF: 175. New CCR 31786 - Early Winters Creek - Twenty Below Restoration Design 2014-117 | 12/31/2014 | 12/30/2014 | |
Design Phases 3 & 4 Natapoc Habitat Enhancement Project | AG: 175. New CCR 32887 - Natapoc Design Phases 3 & 4 2010-53 | 12/31/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 06/01/2014 | ||||||
B | 30 | M2 LRT Two Channels East Side Channel Restoration 2011-89 | |||||||
C | 29 | M2 LRT Two Channels ELJ Construction 2011-86 | 07/07/2014 | ||||||
D | 30 | M2 1890s Side Channel Restoration Construction - 2011-65 | 07/07/2014 | ||||||
E | 115 | Middle Twisp River Reach Assessment 2011-77 | 06/01/2014 | ||||||
F | 30 | Natapoc Construction 2010-53 | |||||||
G | 29 | UWP Reach 3 & 4 Construction 2011-70 | |||||||
H | 30 | UWP Reach 3 & 4 Construction 2011-70 | |||||||
I | 175 | Nason Confluence Habitat Enhancement Project 2013-105 | |||||||
J | 175 | Chewuch River Mile 15.5-17 Fish Enhancement Project 2012-97 | 06/01/2014 | ||||||
K | 175 | Big Valley South Fish Enhancement Project 2012-101 | 06/01/2014 | ||||||
L | 119 | Project management (Covered under Personnel contract - 56662 rel 2) | 06/01/2014 | ||||||
M | 165 | EC Compliance (Covered under Personnel contract - 56662 rel 2) | 06/01/2014 | ||||||
N | 165 | Entiat Stillwaters NEPA Process 2013-109 | 10/01/2013 | ||||||
O | 175 | Entiat Stillwaters Design Project #1 2013-106 | 10/01/2013 | ||||||
P | 175 | Entiat Stillwaters Design Project # 2 2013-107 | 10/01/2013 | ||||||
Q | 175 | Entiat Stillwaters Design Project # 3 2013-108 | 10/01/2013 | ||||||
R | 132 | Produce Progress report | 06/01/2014 | ||||||
S | 175 | Chewuch River Mile 2.5-3.3 Fish Enhancement Project 2013-110 | 10/01/2013 | ||||||
T | 82 | Twisp Poorman Creek Surface Diversion to Wells Project 2013-111 | 12/31/2014 | ||||||
U | 175 | Twisp Poorman Creek Floodplain Design 2013-111 | 10/01/2013 | ||||||
V | 175 | Twisp Bond Lane Side Channel Design 2013-112 | 10/01/2013 | ||||||
W | 175 | Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 | 10/01/2013 | ||||||
X | 175 | Twisp 2nd Bridge Large Wood Design 2013-114 | 10/01/2013 | ||||||
Y | 175 | Twisp River RM 6+ Large Wood Designs 2013-115 | 12/31/2014 | ||||||
Z | 175 | Fender Mill Side Channel Project Re-Design 2010-33 | 10/01/2013 | ||||||
AA | 30 | Twisp River RM 3 Side Channel Construction 2011-64 | |||||||
AB | 29 | Twisp River RM 3 Large Wood Enhancement 2011-64 | 07/08/2014 | ||||||
AC | 165 | New CCR 31786 - Chewuch River USFS NEPA Process 2011-84 | 10/01/2013 | ||||||
AD | 115 | New CCR 31786 - Upper Methow Reach Assessment 2014-116 | 10/01/2013 | ||||||
AE | 29 | New CCR 31786 - Poorman Cr. Rd. Salmon Enhancement Project Construction 2012-100 | 07/08/2014 | ||||||
AF | 175 | New CCR 31786 - Early Winters Creek - Twenty Below Restoration Design 2014-117 | 10/01/2013 | ||||||
AG | 175 | New CCR 32887 - Natapoc Design Phases 3 & 4 2010-53 | 10/01/2013 |