Complete Engineered Construction Plans |
B: 175. Big Valley South Design Phases 3&4 2012-101 |
|
04/15/2015 |
04/15/2015 |
Upper Methow Reach Assessment Report and Data Deliverables |
E: 115. Upper Methow Reach Assessment 2014-116 |
|
12/31/2015 |
12/31/2015 |
Side Channel Restoration and Enhancement |
F: 30. Fender Mill Side Channel Construction 2010-33 |
|
12/31/2015 |
12/31/2015 |
Restore horse pasture where alluvial spoils are stored |
G: 98. M2 1890s Side Channel Restoration Field Repair - 2011-65 |
|
08/15/2015 |
08/15/2015 |
Design reports/models and various plan percentage based plan sets |
H: 175. Early Winters Creek - Twenty Below Restoration Design 2014-117 |
|
12/31/2015 |
|
Design reports/models, outreach materials and various plan percentage based plan sets |
K: 175. Upper Stillwaters Design #2 2013-107 |
|
12/31/2015 |
|
Design reports/models, outreach materials and various plan percentage based plan sets |
L: 175. Upper Stillwaters Design #3 2013-108 |
|
12/31/2015 |
|
Chewuch River Right Design Work |
M: 175. Chewuch River Right Design 2011-74 |
|
12/31/2015 |
12/31/2015 |
Construct the Chewuch River Right Project |
N: 30. Chewuch River Right Construction 2011-74 |
|
12/31/2015 |
12/31/2015 |
Chewuch Camp Ground Design Work |
O: 175. Chewuch Camp Ground Design 2012-96B |
|
12/31/2015 |
12/31/2015 |
Construct the Chewuch Camp Ground Project |
P: 29. Chewuch Camp Ground Construction 2012-96B |
|
12/31/2015 |
12/31/2015 |
Chewuch Camp Ground Design Work |
Q: 175. Chewuch River Mile 13-.15.5 Design 2012-96 |
|
12/31/2015 |
12/31/2015 |
Construct the Chewuch River Mile 13-15.5 Project |
R: 29. Chewuch River Mile 13-15.5 Construction 2012-96 |
|
12/31/2015 |
07/31/2015 |
8 Mile Creek Reconnaissance |
S: 115. 8 Mile Creek Barrier Review and Reconnaissance 2014-120 |
|
12/31/2015 |
12/31/2015 |
All administrative tasks fulfilled with timely quality products |
T: 119. Perform project management and administrative duties |
|
12/31/2015 |
12/31/2015 |
Assist BPA in producing Environmental Compliance documents |
W: 165. Environmental Compliance (Covered under personnel contract CR-273752) |
|
12/31/2015 |
12/31/2015 |
Continue the USFS NEPA process for public review of the Chewuch habitat Restoration projects |
X: 165. CCR-33830/Mod. 1 Chewuch River USFS NEPA Process 2014-126 |
|
12/31/2015 |
12/31/2015 |
Lower Wenatchee River Reach Assessment Report |
Y: 115. CCR-33830/Mod. 1 Lower Wenatchee Reach Assessment - 2014-121 |
|
12/31/2015 |
12/31/2015 |
Lower Wenatchee Public Outreach |
Z: 99. CCR-33830/Mod. 1 Lower Wenatchee Public Outreach - 2012-98 |
|
12/31/2015 |
12/31/2015 |
Complete the USFS NEPA process for the Stormy Project Area A in the Entiat Watershed |
AA: 165. CCR-33830/Mod. 1 Entiat Stormy A USFS NEPA Process 2014-125 |
|
12/31/2015 |
|
Complete the USFS NEPA process for projects in the Entiat Watershed |
AB: 165. CCR-33830/Mod. 1 Entiat Upper Stillwaters USFS NEPA Process 2013-109 |
|
12/31/2015 |
|
Groups 2&3 LWP Plans suitable for construction |
AC: 175. CCR-33830/Mod. 1 Groups 2&3 LWP Habitat Restoration Design-2012-99 |
|
12/01/2015 |
12/31/2015 |
Models, outreach materials, and various plan percentage based plan sets |
AD: 175. CCR-33830/Mod. 1 Meacham Flats Habitat Restoration Design - 2012-102 |
|
12/31/2015 |
12/31/2015 |
Implementation of UWP Reaches 3&4 Project |
AE: 29. CCR-33830/Mod. 1 UWP Reach 3 & 4 Construction 2011-70 |
|
12/18/2015 |
08/07/2015 |
Complete design Phases 4-6 for the Natapoc Habitat Enhancement Project |
AF: 175. CCR-33830/Mod. 1 Natapoc Design Phases 4-6 LWM Option 2010-53 |
|
09/30/2015 |
09/30/2015 |
Construct the Natapoc Habitat Enhancement Project |
AG: 29. CCR-33830/Mod. 1 Natapoc Construction LWM Option 2014-119 |
|
07/31/2015 |
07/31/2015 |
Design reports/models, outreach materials and construction plan |
AH: 175. CCR-33830/Mod. 1 Twisp Horseshoe Side Channel Design (RM 11.5) 2010-39 |
|
12/31/2015 |
|
Design reports/models, outreach materials and construction plan |
AI: 175. CCR-33830/Mod. 1 Twisp Ponds Left Bank Side Channel Design 2010-54 |
|
12/31/2015 |
|
Design reports/models, outreach materials and construction plan |
AJ: 175. CCR-33830/Mod. 1 Newby Narrows Project Design 2015-126 |
|
12/31/2015 |
12/31/2015 |
Design reports/models, outreach materials and construction plan |
AK: 175. CCR-33830/Mod. 1 Lower Twisp River Large Wood Project Design 2015-127 |
|
12/31/2015 |
12/31/2015 |