Province | Subbasin | % |
---|---|---|
Columbia Cascade | Entiat | 20.00% |
Methow | 40.00% | |
Wenatchee | 40.00% |
Previous: | Next: |
---|---|
n/a |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Funding Package - Submit draft to COTR | A: 119. Manage Restoration Projects | 10/31/2013 | 10/31/2013 | |
Assist BPA to produce Environmental Compliance Documentation | B: 165. Produce EC Documentation | 05/31/2014 | 05/27/2014 | |
Design reports, outreach materials, and final construction documents | E: 175. Chewuch River Mile 11.75-13 Design 2011-74 | 06/28/2013 | 06/28/2013 | |
Restored Floodplain and Increased Channel Complexity | F: 30. Twisp Ponds Habitat Restoration Construction 2010-54 | 05/01/2013 | 05/01/2013 | |
Regraded in-flow ditch servicing floodplain rearing habitat ponds | G: 186. Twisp River Ponds Inflow Ditch Regrade 2009-04 | 11/01/2012 | 09/27/2012 | |
Construct 4 miles of cattle exclusion fence | H: 40. Twisp River Fence Project 1 0f 4 2011-75 | 11/16/2012 | 09/13/2012 | |
Construct 0.75 miles of cattle exclusion fence | I: 40. Twisp River Fence Project 2 of 4 2011-75 | 11/16/2012 | 09/13/2012 | |
Construct 0.75 miles of cattle exclusion fence | J: 40. Twisp River Fence Project 3 of 4 2011-75 | 11/16/2012 | 09/13/2012 | |
Construct 1.2 miles of cattle exclusion fence | K: 40. Twisp River Fence Project 4 of 4 2011-75 | 11/16/2012 | 09/13/2012 | |
Constructed Log Jam and Large Wood Placement in Side Channel | L: 29. M2 LRT Eagle Rocks ELJ Construction 2011-80 | 07/12/2013 | 07/12/2013 | |
Constructed Log Jam and Large Wood Placement along Riprap | M: 29. M2 LRT Two Channels ELJ Construction 2011-86 | 05/31/2014 | ||
Constructed Log Jam and Large Wood Placement along Riprap | N: 29. M2 LRT Sugar Dike ELJ Construction 2011-87 | 09/15/2013 | 09/13/2013 | |
Large Wood Habitat along Riprap | O: 29. M2 LRT Site D ELJ Construction 2011-88 | 09/15/2013 | 09/15/2013 | |
Removal of a fish passage barrier | Q: 85. Tillicum Cr. Culvert Replacement Project #1 2011-82 | 05/31/2014 | 10/27/2013 | |
Removal of a fish passage barrier | R: 85. Tillicum Cr. Culvert Replacement Project #2 2012-86 | 05/31/2014 | 05/27/2014 | |
One completed assessment document as per the Work Element Description | S: 174. Entiat Upper Stillwaters Reach Assessment - 2012-92 | 10/01/2013 | 06/28/2013 | |
Final Design documents for Peshastin RM 0.8 project | T: 175. Peshastin RM 0.8 Design 2011-69 | 07/01/2012 | 07/01/2012 | |
Constructed Peshastin RM 0.8 project | U: 30. Peshastin RM 0.8 Construction 2011-69 | 11/30/2012 | 08/30/2012 | |
Restored riparian habitat. | V: 47. Peshastin RM 1.2L Riparian Restoration 2011-79 | 05/16/2014 | 09/30/2013 | |
Peshastin Fishway repaired to operating standards | W: 186. Peshastin Fishway Repairs 2012-93 | 11/16/2012 | 09/21/2012 | |
Permit-ready and construction designs for several projects in the Upper White Pine (Nason Creek) | X: 175. UWP Nason Creek Design 2011-70 | 05/31/2014 | 05/27/2014 | |
Design reports, outreach materials, and final construction documents | Z: 175. NEW CCR28679 Natapoc Design 2010-53 | 05/31/2014 | 05/27/2014 | |
Produce Big Valley South Fish Enhancement Project Conceptual Designs | AB: 175. NEW CCR28679 Big Valley South Fish Enhancement Project 2012-101 | 04/18/2014 | 05/01/2014 | |
Design reports/models, outreach materials and various plan percentage based plan sets | AD: 175. NEW CCR28679 Road's End Design 2012-103 | 05/31/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Cutthroat Trout, Coastal (O. c. clarkii) - Southwest Washington/Columbia River ESU |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Cutthroat Trout, Westslope (O. c. lewisi) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 119 | Manage Restoration Projects | 04/01/2012 | ||||||
B | 165 | Produce EC Documentation | 04/01/2012 | ||||||
C | 185 | Periodic Status Reports for BPA | 04/01/2012 | ||||||
D | 132 | Submit Progress Report in CR216222 | 04/01/2012 | ||||||
E | 175 | Chewuch River Mile 11.75-13 Design 2011-74 | 06/01/2012 | ||||||
F | 30 | Twisp Ponds Habitat Restoration Construction 2010-54 | 07/24/2012 | ||||||
G | 186 | Twisp River Ponds Inflow Ditch Regrade 2009-04 | 07/18/2012 | ||||||
H | 40 | Twisp River Fence Project 1 0f 4 2011-75 | 09/29/2011 | ||||||
I | 40 | Twisp River Fence Project 2 of 4 2011-75 | 09/29/2011 | ||||||
J | 40 | Twisp River Fence Project 3 of 4 2011-75 | 09/29/2011 | ||||||
K | 40 | Twisp River Fence Project 4 of 4 2011-75 | 09/29/2011 | ||||||
L | 29 | M2 LRT Eagle Rocks ELJ Construction 2011-80 | 08/15/2012 | ||||||
M | 29 | M2 LRT Two Channels ELJ Construction 2011-86 | |||||||
N | 29 | M2 LRT Sugar Dike ELJ Construction 2011-87 | 07/29/2013 | ||||||
O | 29 | M2 LRT Site D ELJ Construction 2011-88 | 07/29/2013 | ||||||
P | 30 | M2 LRT Two Channels East Side Channel Restoration 2011-89 | |||||||
Q | 85 | Tillicum Cr. Culvert Replacement Project #1 2011-82 | 09/03/2013 | ||||||
R | 85 | Tillicum Cr. Culvert Replacement Project #2 2012-86 | 09/03/2013 | ||||||
S | 174 | Entiat Upper Stillwaters Reach Assessment - 2012-92 | 04/26/2012 | ||||||
T | 175 | Peshastin RM 0.8 Design 2011-69 | 06/01/2012 | ||||||
U | 30 | Peshastin RM 0.8 Construction 2011-69 | 07/24/2012 | ||||||
V | 47 | Peshastin RM 1.2L Riparian Restoration 2011-79 | 04/01/2012 | ||||||
W | 186 | Peshastin Fishway Repairs 2012-93 | 08/14/2012 | ||||||
X | 175 | UWP Nason Creek Design 2011-70 | 06/01/2012 | ||||||
Y | 165 | Upper Wenatchee Reach Assessement NEPA 2009-28 | 04/01/2012 | ||||||
Z | 175 | NEW CCR28679 Natapoc Design 2010-53 | 06/01/2012 | ||||||
AA | 175 | NEW CCR28679 Twisp River RM 0.5 Restoration Design 2011-72 | 06/01/2012 | ||||||
AB | 175 | NEW CCR28679 Big Valley South Fish Enhancement Project 2012-101 | 06/01/2012 | ||||||
AC | 175 | NEW CCR28679 Meacham Flats Design 2012-102 | 06/01/2012 | ||||||
AD | 175 | NEW CCR28679 Road's End Design 2012-103 | 06/01/2012 |