Contract 56662 REL 3: 2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION - YN
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
56662 REL 3
Contract Title:
2009-003-00 EXP UPPER COLUMBIA HABITAT RESTORATION - YN
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract will fund the Upper Columbia Habitat Restoration Project (UCHRP) to seek, design and implement habitat restoration projects in the Upper Columbia.
Account Type(s):
Expense
Contract Start Date:
06/01/2012
Contract End Date:
05/31/2014
Current Contract Value:
$1,355,805
Expenditures:
$1,355,805

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Shannon Adams Yakama Confederated Tribes Yes Technical Contact adas@yakamafish-nsn.gov (509) 945-0754
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jackie Olney Yakama Confederated Tribes Yes Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6311
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Brandon Rogers Yakama Confederated Tribes Yes Contract Manager rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Technical Contact h.smith@methownet.com (509) 449-2750
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129
Matt Wilberding Yakama Confederated Tribes Yes Technical Contact wilm@yakamafish-nsn.gov (509) 881-7091


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR A: 119. Manage Restoration Projects 10/31/2013 10/31/2013
Assist BPA to produce Environmental Compliance Documentation B: 165. Produce EC Documentation 05/31/2014 05/27/2014
Design reports, outreach materials, and final construction documents E: 175. Chewuch River Mile 11.75-13 Design 2011-74 06/28/2013 06/28/2013
Restored Floodplain and Increased Channel Complexity F: 30. Twisp Ponds Habitat Restoration Construction 2010-54 05/01/2013 05/01/2013
Regraded in-flow ditch servicing floodplain rearing habitat ponds G: 186. Twisp River Ponds Inflow Ditch Regrade 2009-04 11/01/2012 09/27/2012
Construct 4 miles of cattle exclusion fence H: 40. Twisp River Fence Project 1 0f 4 2011-75 11/16/2012 09/13/2012
Construct 0.75 miles of cattle exclusion fence I: 40. Twisp River Fence Project 2 of 4 2011-75 11/16/2012 09/13/2012
Construct 0.75 miles of cattle exclusion fence J: 40. Twisp River Fence Project 3 of 4 2011-75 11/16/2012 09/13/2012
Construct 1.2 miles of cattle exclusion fence K: 40. Twisp River Fence Project 4 of 4 2011-75 11/16/2012 09/13/2012
Constructed Log Jam and Large Wood Placement in Side Channel L: 29. M2 LRT Eagle Rocks ELJ Construction 2011-80 07/12/2013 07/12/2013
Constructed Log Jam and Large Wood Placement along Riprap M: 29. M2 LRT Two Channels ELJ Construction 2011-86 05/31/2014
Constructed Log Jam and Large Wood Placement along Riprap N: 29. M2 LRT Sugar Dike ELJ Construction 2011-87 09/15/2013 09/13/2013
Large Wood Habitat along Riprap O: 29. M2 LRT Site D ELJ Construction 2011-88 09/15/2013 09/15/2013
Removal of a fish passage barrier Q: 85. Tillicum Cr. Culvert Replacement Project #1 2011-82 05/31/2014 10/27/2013
Removal of a fish passage barrier R: 85. Tillicum Cr. Culvert Replacement Project #2 2012-86 05/31/2014 05/27/2014
One completed assessment document as per the Work Element Description S: 174. Entiat Upper Stillwaters Reach Assessment - 2012-92 10/01/2013 06/28/2013
Final Design documents for Peshastin RM 0.8 project T: 175. Peshastin RM 0.8 Design 2011-69 07/01/2012 07/01/2012
Constructed Peshastin RM 0.8 project U: 30. Peshastin RM 0.8 Construction 2011-69 11/30/2012 08/30/2012
Restored riparian habitat. V: 47. Peshastin RM 1.2L Riparian Restoration 2011-79 05/16/2014 09/30/2013
Peshastin Fishway repaired to operating standards W: 186. Peshastin Fishway Repairs 2012-93 11/16/2012 09/21/2012
Permit-ready and construction designs for several projects in the Upper White Pine (Nason Creek) X: 175. UWP Nason Creek Design 2011-70 05/31/2014 05/27/2014
Design reports, outreach materials, and final construction documents Z: 175. NEW CCR28679 Natapoc Design 2010-53 05/31/2014 05/27/2014
Produce Big Valley South Fish Enhancement Project Conceptual Designs AB: 175. NEW CCR28679 Big Valley South Fish Enhancement Project 2012-101 04/18/2014 05/01/2014
Design reports/models, outreach materials and various plan percentage based plan sets AD: 175. NEW CCR28679 Road's End Design 2012-103 05/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 3 instances of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 174 Produce Plan
  • 8 instances of WE 175 Produce Design
Cutthroat Trout, Coastal (O. c. clarkii) - Southwest Washington/Columbia River ESU
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 3 instances of WE 30 Realign, Connect, and/or Create Channel
  • 4 instances of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 174 Produce Plan
  • 8 instances of WE 175 Produce Design
Cutthroat Trout, Westslope (O. c. lewisi)
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 2 instances of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage Restoration Projects 04/01/2012
B 165 Produce EC Documentation 04/01/2012
C 185 Periodic Status Reports for BPA 04/01/2012
D 132 Submit Progress Report in CR216222 04/01/2012
E 175 Chewuch River Mile 11.75-13 Design 2011-74 06/01/2012
F 30 Twisp Ponds Habitat Restoration Construction 2010-54 07/24/2012
G 186 Twisp River Ponds Inflow Ditch Regrade 2009-04 07/18/2012
H 40 Twisp River Fence Project 1 0f 4 2011-75 09/29/2011
I 40 Twisp River Fence Project 2 of 4 2011-75 09/29/2011
J 40 Twisp River Fence Project 3 of 4 2011-75 09/29/2011
K 40 Twisp River Fence Project 4 of 4 2011-75 09/29/2011
L 29 M2 LRT Eagle Rocks ELJ Construction 2011-80 08/15/2012
M 29 M2 LRT Two Channels ELJ Construction 2011-86
N 29 M2 LRT Sugar Dike ELJ Construction 2011-87 07/29/2013
O 29 M2 LRT Site D ELJ Construction 2011-88 07/29/2013
P 30 M2 LRT Two Channels East Side Channel Restoration 2011-89
Q 85 Tillicum Cr. Culvert Replacement Project #1 2011-82 09/03/2013
R 85 Tillicum Cr. Culvert Replacement Project #2 2012-86 09/03/2013
S 174 Entiat Upper Stillwaters Reach Assessment - 2012-92 04/26/2012
T 175 Peshastin RM 0.8 Design 2011-69 06/01/2012
U 30 Peshastin RM 0.8 Construction 2011-69 07/24/2012
V 47 Peshastin RM 1.2L Riparian Restoration 2011-79 04/01/2012
W 186 Peshastin Fishway Repairs 2012-93 08/14/2012
X 175 UWP Nason Creek Design 2011-70 06/01/2012
Y 165 Upper Wenatchee Reach Assessement NEPA 2009-28 04/01/2012
Z 175 NEW CCR28679 Natapoc Design 2010-53 06/01/2012
AA 175 NEW CCR28679 Twisp River RM 0.5 Restoration Design 2011-72 06/01/2012
AB 175 NEW CCR28679 Big Valley South Fish Enhancement Project 2012-101 06/01/2012
AC 175 NEW CCR28679 Meacham Flats Design 2012-102 06/01/2012
AD 175 NEW CCR28679 Road's End Design 2012-103 06/01/2012