Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56662 REL 4: 2009-003-00 EXP UPPER COLUMBIA HABITAT REST - RESCHEDULE WORK
Project Number:
Title:
Upper Columbia Habitat Restoration
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 20.00%
Methow 40.00%
Wenatchee 40.00%
Contract Number:
56662 REL 4
Contract Title:
2009-003-00 EXP UPPER COLUMBIA HABITAT REST - RESCHEDULE WORK
Contract Continuation:
Previous: Next:
n/a
Contract Status:
Closed
Contract Description:
This contract will fund the Upper Columbia Habitat Restoration Project (UCHRP) to seek, design and implement habitat restoration projects in the Upper Columbia.

The intent of this contract is to capture work elements that have on-going work from pre-existing Accord contracts (47761 and 41866) that will expire in 2012.  Due to environmental or shifting project opportunity circumstances, the Work Elements contained in this contract were not able to be completed by the end of the original Accord contracts.
Account Type(s):
Expense
Contract Start Date:
06/01/2012
Contract End Date:
05/31/2014
Current Contract Value:
$2,860,124
Expenditures:
$2,860,124

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Debbie Azure Yakama Confederated Tribes Yes Administrative Contact azud@yakamafish-nsn.gov (509) 865-5121x6334
Roy Beaty Bonneville Power Administration Yes COR rebeaty@bpa.gov (503) 230-5213
Jason Breidert Yakama Confederated Tribes Yes Technical Contact brej@yakamafish-nsn.gov (509) 860-5351
Chris Butler Yakama Confederated Tribes Yes Technical Contact butlerc@yakamafish-nsn.gov (509) 449-8215
Christopher Clemons Yakama Confederated Tribes Yes Technical Contact clec@yakamafish-nsn.gov (509) 881-5746
Edward Gresh Bonneville Power Administration Yes Env. Compliance Lead esgresh@bpa.gov (503) 230-5756
Jarred Johnson Yakama Confederated Tribes Yes Technical Contact johj@yakamafish-nsn.gov (509) 881-1462
John Jorgensen Yakama Confederated Tribes Yes Technical Contact jorj@yakamafish-nsn.gov (509) 670-7298
Peter Lofy Bonneville Power Administration Yes F&W Approver ptlofy@bpa.gov (503) 230-4193
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jackie Olney Yakama Confederated Tribes Yes Administrative Contact olnj@yakamafish-nsn.gov (509) 865-5121x6311
Steve Parker Yakama Confederated Tribes No Supervisor pars@yakamafish-nsn.gov (509) 865-6262x6342
Aaron Penvose Trout Unlimited (TU) No Interested Party apenvose@tu.org (509) 888-0970
Brandon Rogers Yakama Confederated Tribes Yes Contract Manager rogb@yakamafish-nsn.gov (509) 949-4109
Hans Smith Yakama Confederated Tribes Yes Technical Contact h.smith@methownet.com (509) 449-2750
Paul Ward Yakama Confederated Tribes No Supervisor warp@yakamafish-nsn.gov (509) 949-4129
Matt Wilberding Yakama Confederated Tribes Yes Technical Contact wilm@yakamafish-nsn.gov (509) 881-7091


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Funding Package - Submit draft to COTR C: 119. Oversee next contract documents and accruals 05/31/2014 05/27/2014
Pre-acquisition complete for Natapoc property in Upper Wenatchee D: 172. Natapoc - Upper Wenatchee Property - 2010-54 08/30/2013 08/31/2012
Completed Construction of 3-D Habitat Enhancement Features E: 29. 3-D Stillwaters Habitat Enhancement Project - 2009-29 05/31/2014 08/22/2012
Complete Construction on the 8 Mile Ranch Project F: 29. Chewuch River 8-Mile Ranch LWD- 2010-48 08/31/2012 08/03/2012
Restore Native Vegetation and Soil Conditions G: 47. Chewuch River 8-Mile Ranch Re-vegetation - 2010-48 11/01/2013 11/01/2012
Remove and Re-Construct 3,300 feet of fence H: 40. Remove and Install Fence for 8 Mile Ranch - 2010-48 10/05/2012 10/12/2012
Complete the USFS NEPA process for projects in the Chewuch Watershed I: 165. Chewuch River USFS NEPA Process - 2011-84 05/31/2014 05/27/2014
Construct Chewuch River Mile 10 Project J: 29. Chewuch River Mile 10 Instream LWD - 2010-47 08/31/2012 08/31/2012
Design reports, outreach materials, and final construction documents K: 175. Sunnyslope ELJ Design - 2010-45 12/15/2012 11/30/2012
Completed Habitat Restoration Project L: 29. Sunnyslope ELJ Construction - 2010-45 06/30/2013 10/31/2012
Produce Plans for Restoration of Middle Methow Reach - Lewisia Road to Twisp M: 175. Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 05/31/2014 05/29/2014
Design reports, outreach materials, and final construction documents N: 175. Twisp River RM 0.7 to 1.7 Restoration Design - 2010-54 05/31/2014 12/31/2012
Design reports, outreach materials, and final construction documents O: 175. Beaver Creek MSRF Properties Restoration Design - 2010-40 07/19/2013 07/19/2013
Reintroduce 4 Families of Beavers into the Upper Methow Watershed P: 190. Reintroduce Beavers - Methow Watershed 2009-19 05/31/2013 05/31/2013
Completed Habitat Restoration Project Q: 29. NEW CR28515 Old Schoolhouse Fish Enhancement Project Construction (Beaver Creek) - 2010-40 05/31/2014 09/19/2013
Design reports, outreach materials, and final construction documents R: 175. NEW CR28515 Twisp River, RM3 Side Channel Restoration Design - 2011-64 05/31/2014
Design reports, outreach materials, and final construction documents S: 175. NEW CR28515 Twisp River Poorman Crk Road Design - 2012-100 05/31/2014
Design reports, outreach materials, and final construction documents T: 175. NEW CR28515 1st Bend LWP Habitat Restoration Design 2011-81 06/30/2013 06/30/2013
Construct1st Bend LWP Habitat Restoration Project U: 30. NEW CR28515 1st Bend LWP Habitat Restoration Construction 2011-81 11/30/2013 08/09/2013
Construct the Chewuch River Mile 11.75-13 River Left Fish Enhancement Project V: 29. NEW CR28515 Chewuch River Mile 11.75-13 River Left Fish Enhancement Project 2011-74 11/29/2013 07/31/2013
Produce RM13-15.5 engineered plans W: 175. NEW CR28515 Chewuch River Mile 13-15.5 restoration design 2012-96 05/30/2014 05/27/2014
Produce Chewuch River Mile 15.5-17 Fish Enhancement Project Conceptuals X: 175. NEW CR28515Chewuch River Mile 15.5-17 survey and conceptual Development 2012-97 05/30/2014 05/27/2014
Upper Wenatchee Public Outreach Y: 99. NEW CR28515 Upper Wenatchee Public Outreach - 2012-98 05/31/2014 05/27/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 6 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 10 instances of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 175 Produce Design
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 190 Remove, Exclude and/or Relocate Animals
  • 6 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 10 instances of WE 175 Produce Design
Trout, Bull (S. confluentus) (Threatened)
  • 4 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 30 Realign, Connect, and/or Create Channel
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 172 Conduct Pre-Acquisition Activities
  • 6 instances of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA 06/01/2012
B 132 All progress reports for YN contracts under this project to be submitted under CR216222 06/01/2012
C 119 Oversee next contract documents and accruals 06/01/2012
D 172 Natapoc - Upper Wenatchee Property - 2010-54 06/01/2012
E 29 3-D Stillwaters Habitat Enhancement Project - 2009-29 06/01/2012
F 29 Chewuch River 8-Mile Ranch LWD- 2010-48 06/01/2012
G 47 Chewuch River 8-Mile Ranch Re-vegetation - 2010-48 06/01/2012
H 40 Remove and Install Fence for 8 Mile Ranch - 2010-48 06/01/2012
I 165 Chewuch River USFS NEPA Process - 2011-84 06/01/2012
J 29 Chewuch River Mile 10 Instream LWD - 2010-47 06/01/2012
K 175 Sunnyslope ELJ Design - 2010-45 06/01/2012
L 29 Sunnyslope ELJ Construction - 2010-45 06/01/2012
M 175 Lewisia Road to Twisp, Middle Methow Reach Engineering 2010-56 06/01/2012
N 175 Twisp River RM 0.7 to 1.7 Restoration Design - 2010-54 06/01/2012
O 175 Beaver Creek MSRF Properties Restoration Design - 2010-40 06/01/2012
P 190 Reintroduce Beavers - Methow Watershed 2009-19 06/01/2012
Q 29 NEW CR28515 Old Schoolhouse Fish Enhancement Project Construction (Beaver Creek) - 2010-40 08/12/2013
R 175 NEW CR28515 Twisp River, RM3 Side Channel Restoration Design - 2011-64 06/01/2012
S 175 NEW CR28515 Twisp River Poorman Crk Road Design - 2012-100 06/01/2012
T 175 NEW CR28515 1st Bend LWP Habitat Restoration Design 2011-81 06/01/2012
U 30 NEW CR28515 1st Bend LWP Habitat Restoration Construction 2011-81 07/10/2013
V 29 NEW CR28515 Chewuch River Mile 11.75-13 River Left Fish Enhancement Project 2011-74 07/09/2013
W 175 NEW CR28515 Chewuch River Mile 13-15.5 restoration design 2012-96 06/01/2012
X 175 NEW CR28515Chewuch River Mile 15.5-17 survey and conceptual Development 2012-97 06/01/2012
Y 99 NEW CR28515 Upper Wenatchee Public Outreach - 2012-98 06/01/2012
Z 175 NEW CR28515 Group 2&3 LWP Habitat Restoration Design-2012-99 06/01/2012