Province | Subbasin | % |
---|---|---|
Columbia Cascade | Methow | 40.00% |
Wenatchee | 60.00% |
Previous: | Next: |
---|---|
56662 REL 71: 1996-040-00 EXP MID-C COHO SITE / FACILITY DEVELOPMENT |
|
* Expenditures data includes accruals and are based on data through 31-Oct-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow | 01/31/2017 | 01/31/2017 | |
Finish consultation on BA addendums for USFWS and NMFS | C: 165. Support NEPA/SEPA compliance through SAs and/or EAs and additional USFWS/NMFS ESA consultation | 01/30/2017 | 01/30/2017 | |
Design level drawings and permitting for acclimation sites | D: 175. Produce design and specifications to include permitting for Methow sites | 04/21/2017 | 03/30/2017 | |
Design level drawings and permitting for acclimation sites | E: 175. Produce design and specifications to include permitting for Wenatchee sites | 04/07/2017 | ||
Develop and secure agreements for acclimation within conservation easements | F: 98. Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow | 04/01/2016 | 04/01/2016 | |
Water right applications to be submitted to WSDOE; secure water rights | H: 154. Work with WSDOE on securing water rights and providing documentation as needed | 04/28/2017 | 04/17/2017 | |
Natapoc FH | I: 175. Natapoc FH facility | 03/31/2017 | 03/31/2017 | |
develop test well | K: 171. Test Well at Trinity Acclimation site | 07/01/2016 | 07/01/2016 | |
develop test well | L: 171. Test Well at Tall Timber 2 Acclimation site | 09/30/2016 | ||
Develop test well | M: 171. Test Well at Early Winters 3 Acclimation site | 02/28/2017 | 02/28/2017 |
Primary Focal Species | Work Statement Elements |
---|---|
Coho (O. kisutch) - Unspecified Population |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 02/01/2016 | ||||||
B | 119 | Manage and Administer contract process through subcontracted activities in the Wenatchee and Methow | 02/01/2016 | ||||||
C | 165 | Support NEPA/SEPA compliance through SAs and/or EAs and additional USFWS/NMFS ESA consultation | 02/01/2016 | ||||||
D | 175 | Produce design and specifications to include permitting for Methow sites | 02/01/2016 | ||||||
E | 175 | Produce design and specifications to include permitting for Wenatchee sites | 02/01/2016 | ||||||
F | 98 | Work through the Methow Conservancy and RCO for allowable use agreements on properties in the Methow | 02/01/2016 | ||||||
G | 132 | [No Report Required] | 02/01/2016 | ||||||
H | 154 | Work with WSDOE on securing water rights and providing documentation as needed | 02/01/2016 | ||||||
I | 175 | Natapoc FH facility | |||||||
J | 171 | Test Well at Two Rivers Acclimation site | |||||||
K | 171 | Test Well at Trinity Acclimation site | 12/30/2016 | ||||||
L | 171 | Test Well at Tall Timber 2 Acclimation site | |||||||
M | 171 | Test Well at Early Winters 3 Acclimation site | 08/31/2016 |