Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 56835: 2010-001-00 EXP UPR COLUMBIA RESTORATION DESIGN & DEVELOP - USFWS
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
56835
Contract Title:
2010-001-00 EXP UPR COLUMBIA RESTORATION DESIGN & DEVELOP - USFWS
Contract Continuation:
Previous: Next:
n/a
  • 63007: 2010-001-00 EXP UPR COLUMBIA RESTORATION DESIGN & DEVELOP - USFWS
Contract Status:
Closed
Contract Description:
*  Modification 2:  Time extension until 9-30-2012 and additonal funding to cover the extended time period.
_______________________________________________________________________________________

#  BPA funding will provide for one 0.75 FTE engineer in place of  “BPA  funding will provide for 1 FTE engineer”.

_______________________________________________________________________________________


The Upper Columbia Evolutionary Significant Unit (ESU) has one federally Endangered Species Act (ESA) listed fish species: Upper Columbia Spring Chinook, and two ESA listed threatened fish species: Upper Columbia Steelhead and Bull Trout.  

Habitat restoration for listed species have been identified in the Upper Columbia Spring Chinook and Steelhead Recovery Plan (Plan) as well as the 2008 Federal Columbia River Power System Biological Opinion RPA 35.  Currently, the Upper Columbia has approximately $21 million annually for implementation of habitat restoration associated with the Plan.  These funds are provided through Bonneville Power Administration, Washington State Salmon Recovery Board, Mid-Columbia Habitat Conservation Plan Tributary Committee, the Priest Rapids Coordinating Committee, Tribal Accords and several other funding sources.  Presently, there is a lack of cost effective engineering available to project proponents to design and implement these projects.  

The Mid-Columbia River Fishery Resource Office (USFWS) proposes to develop a habitat restoration team that will work directly with project proponents to identify, survey, design and implement habitat restoration projects in the Upper Columbia, consistent with the areas identified by the Regional Technical Team as biological priorities in the region.  The team will be comprised of the program leader, a habitat restoration specialist, a habitat restoration engineer, a technician, and the project proponent.  BPA  funding will provide for one 0.75 FTE engineer and a 0.5 FTE technician. The USFWS will provide funding for the program leader, a habitat restoration specialist and 0.5 FTE of the technician.
Account Type(s):
Expense
Contract Start Date:
04/01/2012
Contract End Date:
09/30/2013
Current Contract Value:
$204,953
Expenditures:
$204,953

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
BPA EC Permits A: 165. * Complete BPA EC Permitting Process 09/30/2013 09/30/2013
Contract Administration B: 119. * Manage BPA contracting requirements 09/30/2013 09/30/2013
Strategy for Habitat Restoration Team C: 191. Coordinate Design Work on Habitat Restoration Project 03/31/2013 03/31/2012
Project List D: 114. Identify and Select Projects for 2012 09/03/2012 09/03/2012
Project List E: 114. * Identify and Select Projects for 2013 05/31/2013 06/14/2013
Project design and specifications F: 175. * Produce Design and Specifications 09/30/2013 09/30/2013
Technical Review and Oversight G: 122. * Technical Review and Oversight 09/30/2013 09/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 2 instances of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 * Complete BPA EC Permitting Process 01/15/2012
B 119 * Manage BPA contracting requirements 01/15/2012
C 191 Coordinate Design Work on Habitat Restoration Project 01/15/2012
D 114 Identify and Select Projects for 2012 04/01/2012
E 114 * Identify and Select Projects for 2013 04/01/2012
F 175 * Produce Design and Specifications 01/15/2012
G 122 * Technical Review and Oversight 01/15/2012
H 185 * Periodic Status Reports for BPA 01/15/2012
I 132 * Submit Progress Report for the period (Apr 2012) to (Sep 2013) 01/15/2012