Contract 63007: 2010-001-00 EXP UPR COLUMBIA RESTORATION DESIGN & DEVELOP - USFWS
Project Number:
Title:
Upper Columbia Programmatic Habitat
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Cascade Entiat 25.00%
Methow 25.00%
Okanogan 25.00%
Wenatchee 25.00%
Contract Number:
63007
Contract Title:
2010-001-00 EXP UPR COLUMBIA RESTORATION DESIGN & DEVELOP - USFWS
Contract Continuation:
Previous: Next:
56835: 2010-001-00 EXP UPR COLUMBIA RESTORATION DESIGN & DEVELOP - USFWS
Contract Status:
Closed
Contract Description:
The Upper Columbia Evolutionary Significant Unit (ESU) has one federally Endangered Species Act (ESA) listed fish species: Upper Columbia Spring Chinook, and two ESA listed threatened fish species: Upper Columbia Steelhead and Bull Trout.  

Habitat restoration for listed species have been identified in the Upper Columbia Spring Chinook and Steelhead Recovery Plan (Plan) as well as the 2008 Federal Columbia River Power System Biological Opinion RPA 35.  Currently, the Upper Columbia has approximately $21 million annually for implementation of habitat restoration associated with the Plan.  These funds are provided through Bonneville Power Administration, Washington State Salmon Recovery Board, Mid-Columbia Habitat Conservation Plan Tributary Committee, the Priest Rapids Coordinating Committee, Tribal Accords and several other funding sources.  Presently, there is a lack of cost effective engineering available to project proponents to design and implement these projects.  

The Mid-Columbia River Fishery Resource Office (USFWS) proposes to continue work through a habitat restoration team that will work directly with project proponents to complete the designs and implementation on three Lower Entiat River Restoration projects. The work will entail  survey, design and implementation along with construction oversight of these projects.  All three projects are associated with the FCRPS.  The team will be comprised of the program leader, a habitat restoration specialist, a habitat restoration engineer, a technician, and the project proponent.  BPA  funding will provide for one 0.5 FTE engineer and a 0.5 FTE technician. The USFWS will provide funding for the program leader, a habitat restoration specialist and 0.5 FTE of the technician.
Account Type(s):
Expense
Contract Start Date:
10/01/2013
Contract End Date:
09/30/2014
Current Contract Value:
$61,928
Expenditures:
$61,928

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
BPA EC Permits A: 165. * Complete BPA EC Permitting Process 09/30/2014 09/30/2014
All administrative tasks fulfilled with timely quality products B: 119. * Manage BPA contracting requirements 09/30/2014 09/30/2014
Project design and specifications C: 175. * Produce Design and Specifications 09/30/2014 04/11/2014
Construction Oversight D: 100. *Construction Oversight 09/30/2014 09/30/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management
Coho (O. kisutch) - Unspecified Population
  • 1 instance of WE 100 Construction Management
Sockeye (O. nerka) - Lake Wenatchee ESU
  • 1 instance of WE 175 Produce Design
Sockeye (O. nerka) - Okanogan River ESU
  • 1 instance of WE 175 Produce Design
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 175 Produce Design
  • 1 instance of WE 100 Construction Management

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 * Complete BPA EC Permitting Process 10/01/2013
B 119 * Manage BPA contracting requirements 10/01/2013
C 175 * Produce Design and Specifications 10/01/2013
D 100 *Construction Oversight 10/01/2013
E 185 Periodic Status Reports for BPA 10/01/2013
F 132 * Submit Progress Report for the period (Apr 2012) to (Sep 2013) 10/01/2013