Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 60597: 2000-031-00 EXP N FORK JOHN DAY FISH HABITAT ENHANCEMENT
Project Number:
Title:
Enhance Habitat in the North Fork John Day River
BPA PM:
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau John Day 100.00%
Contract Number:
60597
Contract Title:
2000-031-00 EXP N FORK JOHN DAY FISH HABITAT ENHANCEMENT
Contract Continuation:
Previous: Next:
56226: 2000-031-00 EXP N FORK JOHN DAY FISH HABITAT ENHANCEMENT
  • 64736: 2000-031-00 EXP N FORK JOHN DAY FISH HABITAT ENHANCEMENT
Contract Status:
Closed
Contract Description:
Contract History: The purpose of this project is to protect and enhance habitat for improved natural production of indigenous, Mid-Columbia River (MCR) Evolutionary Significant Unit (ESU) summer steelhead (Oncorhynchus mykiss), listed as threatened under the Federal Endangered Species Act (ESA), and spring Chinook salmon (Oncorhynchus tshawytscha) within the North Fork of the John Day River Basin.  The project entails coordinated, cooperative efforts to protect and improve anadromous fisheries habitat consistent with the strategies and objectives outlined in the John Day Subbasin Plan.

This project originated in 2000 with initial on-the-ground implementations occurring in 2001.  These projects were implemented within lower Camas Creek tributaries (Snipe and Owens Creeks), Deer Creek and the Lower North Fork John Day River.  Approximately 16.8 miles of riparian fencing and 20 off-stream water developments have been constructed and two wells reactivated under the project.  These improvements have resulted in enhancement of approximately ten stream miles and 708 acres of riparian and floodplain habitat on private properties.

To date, all projects have included cost share funding and/or in-kind assistance from various sources including the Confederated Tribes of the Umatilla Indian Reservation (CTUIR), U.S. Department of Agriculture' s (USDA) Wildlife Habitat Incentive and Conservation Reserve Enhancement Programs (WHIP and CREP), U.S. Bureau of Indian Affairs (BIA), U.S. Army Corps of Engineers (COE), National Oceanic and Atmospheric Administration's (NOAA) Pacific Coastal Salmon Recovery Fund (PCSRF), North Fork John Day Watershed Council (NFJDWC), Oregon Watershed Enhancement Board (OWEB), U.S. Fish & Wildlife (USFWS) Partners for Wildlife Program, Umatilla National Forest (UNF), Community Action Program of East Central Oregon (CAPECO), and Columbia Power Cooperative Association.  The project has also partnered with other entities, including the UNF and Grant Soil and Water Conservation District (SWCD) to assist them in obtaining NOAA cost share and habitat recovery on additional North and Middle Fork John Day tributaries.  These efforts have resulted in further enhancement of approximately 2.7 stream miles and 97 acres of floodplain and upland habitat.  Upland fencing associated with this project will be financed by these cost share entities since BPA is reluctant to approve funding for this purpose.

Summary of 2013-2014 Contract Work: Implementation during this project cycle shall include: (1) prioritize areas and projects for the 2014 performance period within the Lower Camas, Upper Camas, Desolation and Granite Creeks Geographic Areas (GA's), (2) produce environmental compliance documentation, (3) outreach and education, (4)  maintain water developments for easements on Lower and Upper Camas Creek, Snipe Creek, Deer Creek, and NF John Day, (5) investigate livestock trespass for easements on Lower and Upper Camas Creek, Snipe Creek, Deer Creek, and NF John Day, (6) maintain fences for easements on Lower and Upper Camas Creek, Snipe Creek, Deer Creek, and NF John Day, (7) Maintain vegetation for easements on Lower and Upper Camas Creek, Snipe Creek, Deer Creek, and NF John Day, (8) Collect monitoring data to establish baseline conditions and tract project success, (9) acquire stream temperature data and pass on to NOAA, (10) replace the Corrigal Springs culvert, (12) contribute to the Fox Creek Restoration effort, (13) construct the Mud Creek fence, (14) install the Red Boy Pipeline, (15) maintain the Taylor Creek fence, (16) construct the Indian Creek fence, (17) construct the Smith Creek fence, (18) complete a design for the Granite Creek In-stream restoration, (19) Upper Camas Well Improvement, (20) complete an annual report for the 2012 performance period, (21) produce project deliverables, (22) complete status reports, (23) complete Granite Creek In-stream implementation, (24) complete the Upper Camas In-stream implementation along 0.8 mile of Camas Creek, (25) develop a monitoring plan for CTUIR's Fishery Habitat Program, (26) coordinate the development of treatments to Camas Creek adjacent to Ukiah, OR, (27) place LWD along Clear Creek, (28) develop a stock watering pond.
Account Type(s):
Expense
Contract Start Date:
02/01/2013
Contract End Date:
01/31/2014
Current Contract Value:
$622,012
Expenditures:
$622,012

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Identify, Prioritize and Select Habitat Project Areas A: 114. Identify, Prioritize and Select Habitat Project Areas 11/01/2013 11/01/2013
Produce Environmental Compliance Documentation B: 165. Produce Environmental Compliance Documentation 01/31/2014 01/31/2014
Provide Local Community-Based Outreach and Education C: 99. Provide Outreach and Education 01/31/2014 01/31/2014
Maintain Water Developments D: 186. Maintain Water Developments 01/31/2014 01/31/2014
Investigate for Livestock Trespass E: 26. Investigate for Livestock Trespass 01/31/2014 01/31/2014
Maintain Fences F: 186. Maintain Fences 01/31/2014 01/31/2014
Maintain Vegetation G: 197. Maintain Vegetation 01/31/2014 01/31/2014
Collect Data to Monitor Project Effectiveness and temperatures H: 157. Collect Monitoring Data 01/31/2014 01/31/2014
Acquire and Submit Stream Temperature Data to NOAA I: 157. Acquire Stream Temperature Data 01/31/2014 01/31/2014
Corrigal Springs Culvert Replacement J: 184. Corrigal Springs Culvert Replacement 10/01/2013 10/31/2013
Fox Creek Channel Realignment K: 29. Fox Creek Channel Improvements 10/31/2013 10/31/2013
Mud Creek Fence L: 40. Mud Creek Fence 01/31/2014 01/31/2014
Red Boy Mine Pipeline Replacement M: 98. Red Boy Mine Pipeline Replacement 12/31/2013 12/31/2013
Taylor Creek Fence Maintenance N: 186. Taylor Creek Fence Maintenance 12/31/2013 12/31/2013
Indian Creek Fence O: 40. Indian Creek Fence 12/31/2013 12/31/2013
Smith Creek Fence P: 40. Smith Creek Fence 12/31/2013 12/31/2013
Granite Creek Implementation Design Q: 175. Granite Creek Implementation Design 01/31/2014 01/31/2014
Granite Creek In-stream Implementation S: 29. Granite Creek In-stream Implementation 09/02/2013 09/02/2013
CTUIR Monitoring Plan Development U: 156. CTUIR Monitoring Plan Development 12/31/2013
Camas Creek Coordination Effort V: 174. Camas Creek Coordination Effort 01/31/2014 01/31/2014
Clear Creek Wood Placement W: 36. Clear Creek Wood Placement 12/31/2013
Attach Progress Report in Pisces Z: 132. Submit Annual Report (1 February 12 - 31 January 13) 01/31/2014
Fulfill all administrative tasks with quality products and in a timely manner. AA: 119. Produce Project Deliverables 01/31/2014 01/31/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 34 Develop Alternative Water Source
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 3 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 3 instances of WE 40 Install Fence
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
Trout, Bull (S. confluentus) (Threatened)
  • 1 instance of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 184 Install Fish Passage Structure
  • 1 instance of WE 98 Other
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 175 Produce Design
Trout, Rainbow (Oncorhynchus mykiss)
  • 1 instance of WE 197 Maintain/Remove Vegetation
  • 1 instance of WE 26 Investigate Trespass
  • 2 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 2 instances of WE 29 Increase Aquatic and/or Floodplain Complexity
  • 2 instances of WE 34 Develop Alternative Water Source
  • 1 instance of WE 36 Develop Terrestrial Habitat Features
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 175 Produce Design
  • 2 instances of WE 157 Collect/Generate/Validate Field and Lab Data
Trout, Interior Redband (O. mykiss gairdnerii)
  • 1 instance of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 40 Install Fence
  • 1 instance of WE 114 Identify and Select Projects

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 114 Identify, Prioritize and Select Habitat Project Areas 02/01/2013
B 165 Produce Environmental Compliance Documentation 02/01/2013
C 99 Provide Outreach and Education 02/01/2013
D 186 Maintain Water Developments 02/01/2013
E 26 Investigate for Livestock Trespass 02/01/2013
F 186 Maintain Fences 02/01/2013
G 197 Maintain Vegetation 07/02/2013
H 157 Collect Monitoring Data 03/25/2013
I 157 Acquire Stream Temperature Data 03/25/2013
J 184 Corrigal Springs Culvert Replacement 07/01/2013
K 29 Fox Creek Channel Improvements 07/15/2013
L 40 Mud Creek Fence 07/02/2013
M 98 Red Boy Mine Pipeline Replacement 02/01/2013
N 186 Taylor Creek Fence Maintenance 02/01/2013
O 40 Indian Creek Fence 03/20/2013
P 40 Smith Creek Fence 03/20/2013
Q 175 Granite Creek Implementation Design 02/01/2013
R 34 CANCELED - Upper Camas Stock Water Development Improvement
S 29 Granite Creek In-stream Implementation 07/15/2013
T 29 CANCELED - Upper Camas Creek In-stream Implementation 02/01/2013
U 156 CTUIR Monitoring Plan Development 02/01/2013
V 174 Camas Creek Coordination Effort 02/01/2013
W 36 Clear Creek Wood Placement
X 34 CANCELED - Icenogle Stock Pond
Y 185 Periodic Status Reports for BPA 02/01/2013
Z 132 Submit Annual Report (1 February 12 - 31 January 13) 02/01/2013
AA 119 Produce Project Deliverables 02/01/2013