Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Contract Development and Direction | 06/30/2014 | 06/30/2014 | |
Columbia River Basin White Sturgeon Framework Plan | C: 174. Basin-wide Framework Plan for NPCC | 06/30/2014 | 03/12/2014 | |
Hatchery Master Plan Concept Designs and Specifications | D: 175. STEP 1: Complete any necessary Master Plan Facility Concept Designs | 02/28/2014 | 02/27/2014 | |
CRITFC Master Plan | E: 174. STEP 1: Hatchery Master Plan Step I through BPA & NPCC acceptance | 06/30/2014 |
Primary Focal Species | Work Statement Elements |
---|---|
Sturgeon, White (A. transmontanus) - Lower Columbia River |
|
Sturgeon, White (Acipenser transmontanus) - All Populations except Kootenai R. DPS |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 07/01/2013 | ||||||
B | 119 | Contract Development and Direction | 07/01/2013 | ||||||
C | 174 | Basin-wide Framework Plan for NPCC | 05/06/2013 | ||||||
D | 175 | STEP 1: Complete any necessary Master Plan Facility Concept Designs | 05/06/2013 | ||||||
E | 174 | STEP 1: Hatchery Master Plan Step I through BPA & NPCC acceptance | 05/06/2013 | ||||||
F | 196 | STEPS 1 & 2: Initiate Master Plan Step 2 Tasks | |||||||
G | 175 | STEP 2: Facility Preliminary design & 30% cost estimate | 07/01/2013 | ||||||
H | 165 | STEP 2: Assist with NEPA process contracted by BPA | 07/01/2013 | ||||||
I | 132 | Progress Report | 07/01/2013 |