Province | Subbasin | % |
---|---|---|
Columbia River Estuary | Columbia Estuary | 50.00% |
Lower Columbia | Columbia Lower | 50.00% |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Full Name | Organization | Write Permission | Contact Role | Work Phone | |
---|---|---|---|---|---|
Thomas Argent | Lower Columbia Estuary Partnership | Yes | Administrative Contact | targent@estuarypartnership.org | (503) 226-1565 |
Catherine Corbett | Lower Columbia Estuary Partnership | Yes | Contract Manager | ccorbett@estuarypartnership.org | (503) 226-1565 |
Anne Creason | Bonneville Power Administration | Yes | COR | amcreason@bpa.gov | (503) 230-3859 |
Daniel Evans | Lower Columbia Estuary Partnership | No | Technical Contact | devans@estuarypartnership.org | (503) 226-1565 |
Michelle Guay | Bonneville Power Administration | Yes | Env. Compliance Lead | mxguay@bpa.gov | (503) 230-3459 |
Debrah Marriott | Lower Columbia Estuary Partnership | No | Supervisor | marriott.debrah@lcrep.org | (503) 226-1565 |
John Skidmore | Bonneville Power Administration | Yes | F&W Approver | jtskidmore@bpa.gov | (503) 230-5494 |
Kristi Van Leuven | Bonneville Power Administration | Yes | Contracting Officer | kjvleuven@bpa.gov | (503) 230-3605 |
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Environmental Compliance Documentation | A: 165. Environmental Compliance Work | 09/30/2015 | 09/30/2015 | |
All administrative tasks fulfilled with timely quality products | B: 119. Project Management and Administration | 09/30/2015 | 09/30/2015 | |
Report on Technical Assistance Results | C: 175. On-Call Restoration Technical Assistance (TA) | 09/30/2015 | 09/30/2015 | |
Provide PRC Project Recommendations to BPA | D: 114. Conduct PRC Solicitation Process for Fall 2013- Spring 2015 | 09/30/2015 | 09/30/2015 | |
Identification and Development of New Restoration Projects Addressing 2008 BiOp Obligations | E: 114. Identify Priority Restoration Projects for EP Implementation | 09/30/2015 | 09/30/2015 | |
Coordination Among Restoration Partners | F: 191. Regional Coordination - Estuary Habitat Restoration | 09/30/2015 | 09/30/2015 | |
Native plantings | G: 47. LA SWAMP--CONSTRUCTION-- Plantings | 04/15/2014 | 04/25/2014 | |
Planting Maintenance | H: 198. LA SWAMP--CONSTRUCTION-- Maintain Plantings | 09/19/2014 | 09/19/2014 | |
Louisiana Swamp Level 3 AEMR data collection | I: 157. LA SWAMP-- Collect POST-Construction AEMR Level 3 data | 02/28/2015 | 02/28/2015 | |
Final designs and permit applications | J: 175. LA CENTER WETLANDS-- DESIGN Phase for Site 43 & 43B | 09/01/2015 | 09/01/2015 | |
Horsetail Creek Level 3 AEMR data collection | K: 157. HORSETAIL-- Collect POST-Construction AEMR Level 3 data | 09/30/2014 | 09/30/2014 | |
Attach Progress Report in Pisces | M: 132. Produce FY 2013 Annual Report | 05/30/2014 | 05/01/2014 | |
CREEC Synthesis Report | R: 141. Other Reports for BPA | 03/15/2015 | 02/27/2015 | |
Final project designs and permit applications. | S: 175. (CCR-31806)* BATWATER STATION-- DESIGN-- Complete Design & Permitting | 07/31/2015 | 07/31/2015 | |
Submit final designs to BPA | T: 175. (CCR-31806)* THOUSAND ACRES-- DESIGN--Complete Design & Permitting | 07/31/2014 | 07/31/2014 | |
Remove tide gate, culvert and water control structure | U: 180. (CCR-31806)* THOUSAND ACRES-- CONSTRUCTION-- Remove Tide Gate, Culvert & Water Control Structure | 11/21/2014 | 11/21/2014 | |
Excavate to enhance habitat | V: 181. (CCR-31806)* THOUSAND ACRES-- CONSTRUCTION Phase-- Excavation | 11/21/2014 | 11/21/2014 | |
Install Large Woody Debris and Riffle | W: 29. (CCR-31806)* THOUSAND ACRES-- CONSTRUCTION Phase-- LWD & Riffle Installation | 11/21/2014 | 11/21/2014 | |
Wahkeena Creek diversion structure retrofit | X: 181. (CCR-32156)** WAHKEENA--CONSTRUCTION--Retrofit Diversion Structure | 10/31/2014 | 10/31/2014 | |
Skamakowa Level 3 AEMR data collection | Y: 157. (CCR-32156)** SKAMAKOWA-- Collect POST-Construction AEMR Level 3 data | 09/30/2015 | 09/30/2015 | |
Breach levee and remove tide gate | Z: 180. (CCR-34029)*** BATWATER-- CONSTRUCTION--Breach dike, remove tide gate | 09/30/2015 | 09/30/2015 | |
Excavate 0.2 miles of sinuous tidal channels | AA: 181. (CCR-34029)*** BATWATER-- CONSTRUCTION--Excavation | 09/30/2015 | 09/30/2015 | |
LWD installation and Create microtopography | AB: 29. (CCR-34029)*** BATWATER-- CONSTRUCTION--LWD Installation and Create Microtopography | 09/30/2015 | 09/30/2015 | |
Blue Carbon Data Collection | AD: 157. (CCR-34029)*** BLUE CARBON-- Data Collection at Wallooskee-Youngs Restoration Site | 09/30/2015 | 09/30/2015 | |
Four Levee Breaches | AE: 180. (CCR-34732)**** LA CENTER-- CONSTRUCTION--Levee breaches | 09/30/2015 | ||
Removal of fish passage barriers | AF: 85. (CCR-34732)****LA CENTER-- CONSTRUCTION--Remove Weir and Culvert | 09/30/2015 | ||
Completed channel construction | AG: 30. (CCR-34732)****LA CENTER-- CONSTRUCTION--Realign Channels | 09/30/2015 | ||
LWD Installation | AH: 29. (CCR-34732)****LA CENTER-- CONSTRUCTION--LWD Installation | 09/30/2015 | ||
Initial Surveying, Analyses, Engineering and Permits | AI: 175. (CCR-34732)****STEIGERWALD-- ERTG Rescore and Field Data Collection | 09/30/2015 | 09/30/2015 | |
Batwater Level 3 AEMR data collection | AJ: 157. (CCR-34732)**** BATWATER--Collect POST-Construction AEMR Level 3 data | 09/30/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Chum (Oncorhynchus keta) - Columbia River ESU (Threatened) |
|
Coho (Oncorhynchus kisutch) - Lower Columbia River ESU (Threatened) |
|
Cutthroat Trout, Coastal (Oncorhynchus clarkii clarkii) - All Anadromous Populations |
|
Sockeye (Oncorhynchus nerka) - All Populations |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Lamprey, Pacific (Entosphenus tridentata) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Environmental Compliance Work | 10/01/2013 | ||||||
B | 119 | Project Management and Administration | 10/01/2013 | ||||||
C | 175 | On-Call Restoration Technical Assistance (TA) | 10/01/2013 | ||||||
D | 114 | Conduct PRC Solicitation Process for Fall 2013- Spring 2015 | 10/01/2013 | ||||||
E | 114 | Identify Priority Restoration Projects for EP Implementation | 10/01/2013 | ||||||
F | 191 | Regional Coordination - Estuary Habitat Restoration | 10/01/2013 | ||||||
G | 47 | LA SWAMP--CONSTRUCTION-- Plantings | 10/01/2013 | ||||||
H | 198 | LA SWAMP--CONSTRUCTION-- Maintain Plantings | 10/01/2013 | ||||||
I | 157 | LA SWAMP-- Collect POST-Construction AEMR Level 3 data | 07/30/2013 | ||||||
J | 175 | LA CENTER WETLANDS-- DESIGN Phase for Site 43 & 43B | 10/01/2013 | ||||||
K | 157 | HORSETAIL-- Collect POST-Construction AEMR Level 3 data | 10/01/2013 | ||||||
L | 185 | Periodic Status Reports for BPA | 10/01/2013 | ||||||
M | 132 | Produce FY 2013 Annual Report | 10/01/2013 | ||||||
N | 132 | Submit RME 2013 Report via Monitoring Contract | 10/01/2013 | ||||||
O | 132 | Submit RME 2014 Report via Monitoring Contract | 10/01/2013 | ||||||
P | 141 | Other Reports for BPA | 10/01/2013 | ||||||
Q | 141 | Other Reports for BPA | 10/01/2013 | ||||||
R | 141 | Other Reports for BPA | 10/01/2013 | ||||||
S | 175 | (CCR-31806)* BATWATER STATION-- DESIGN-- Complete Design & Permitting | 07/27/2015 | ||||||
T | 175 | (CCR-31806)* THOUSAND ACRES-- DESIGN--Complete Design & Permitting | 10/01/2013 | ||||||
U | 180 | (CCR-31806)* THOUSAND ACRES-- CONSTRUCTION-- Remove Tide Gate, Culvert & Water Control Structure | 08/12/2014 | ||||||
V | 181 | (CCR-31806)* THOUSAND ACRES-- CONSTRUCTION Phase-- Excavation | 08/12/2014 | ||||||
W | 29 | (CCR-31806)* THOUSAND ACRES-- CONSTRUCTION Phase-- LWD & Riffle Installation | 08/12/2014 | ||||||
X | 181 | (CCR-32156)** WAHKEENA--CONSTRUCTION--Retrofit Diversion Structure | 07/26/2014 | ||||||
Y | 157 | (CCR-32156)** SKAMAKOWA-- Collect POST-Construction AEMR Level 3 data | 10/01/2013 | ||||||
Z | 180 | (CCR-34029)*** BATWATER-- CONSTRUCTION--Breach dike, remove tide gate | 07/27/2015 | ||||||
AA | 181 | (CCR-34029)*** BATWATER-- CONSTRUCTION--Excavation | 07/27/2015 | ||||||
AB | 29 | (CCR-34029)*** BATWATER-- CONSTRUCTION--LWD Installation and Create Microtopography | 07/27/2015 | ||||||
AC | 47 | (CCR-34029)*** BATWATER-- CONSTRUCTION--Native plantings | 07/27/2015 | ||||||
AD | 157 | (CCR-34029)*** BLUE CARBON-- Data Collection at Wallooskee-Youngs Restoration Site | 10/01/2013 | ||||||
AE | 180 | (CCR-34732)**** LA CENTER-- CONSTRUCTION--Levee breaches | 09/30/2015 | ||||||
AF | 85 | (CCR-34732)****LA CENTER-- CONSTRUCTION--Remove Weir and Culvert | 09/30/2015 | ||||||
AG | 30 | (CCR-34732)****LA CENTER-- CONSTRUCTION--Realign Channels | 09/30/2015 | ||||||
AH | 29 | (CCR-34732)****LA CENTER-- CONSTRUCTION--LWD Installation | 09/30/2015 | ||||||
AI | 175 | (CCR-34732)****STEIGERWALD-- ERTG Rescore and Field Data Collection | |||||||
AJ | 157 | (CCR-34732)**** BATWATER--Collect POST-Construction AEMR Level 3 data | 10/01/2013 |