Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 63690: 2008-908-00 EXP FCRPS WATER STUDIES & PASSAGE
Project Number:
Title:
FCRPS Water Studies & Passage of Adult Salmon & Steelhead
Stage:
Closed
Area:
Province Subbasin %
Basinwide - 100.00%
Contract Number:
63690
Contract Title:
2008-908-00 EXP FCRPS WATER STUDIES & PASSAGE
Contract Continuation:
Previous: Next:
41805: 200890800 EXP FCRPS WATER STUDIES & PASSAGE
  • 67599: 2008-908-00 EXP FCRPS WATER STUDIES & PASSAGE
Contract Status:
Closed
Contract Description:
FCRPS WATER MANAGEMENT STUDIES--ADULT SALMON & STEELHEAD PASSAGE INVESTIGATIONS

PURPOSE:  The purpose of this contract is to investigate salmon and steelhead passage through the hydroelectric system to validate adult survival assumptions used in estimating extinction risk and recovery potential, and to determine sources of adult fish mortality.

OVERVIEW:

During development of the FCRPS Biological Opinion, new data were presented that demonstrated that adult spring Chinook and steelhead destined to the upper Columbia River, were surviving at substantially lower rates through the lower Columbia River than previously documented.  Extinction risk and recovery potential for the endangered UCR salmon and steelhead are significantly affected by these higher mortalities.  Rather than the <2% adult mortality per COE dam that was expected, the latest PIT tag survival information demonstrated that per project mortality was 3%/dam for UCR spring Chinook and 7%/dam for UCR steelhead.  It is not clear if this higher mortality is related to hydropower operations or some other cause.

From 2008 to 2012, the Confederated Tribes of the Colville Reservation (CCT) addressed portions of the Reasonable and Prudent Alternative (RPA) 52 of the Federal Columbia River Power System (FCRPS) Biological Opinion (BiOp) (NMFS 2008).  The task of addressing portions of RPA 52 was split into two components; under the first phase, existing information was reviewed and analyzed to determine if the survival reduction for upper Columbia steelhead and spring Chinook (and differences between upper Columbia stocks and Snake River stocks) in the lower Columbia River could be explained.  Implementation of Phase II was dependent on the results of the first phase; if the conclusion was that there is not enough information to describe a survival difference between upper Columbia spring Chinook salmon and steelhead compared to Snake River fish, then a detailed study plan would be developed that outlined an approach to collect empirical information that could explain the survival discrepancies.  A draft detailed study plan was developed but never finalized or implemented because of various factors, including cost and feasibility. The purpose of this contract is to monitor and participate in existing processes of the FCRPS BiOp to understand if/how Phase II of RPA 52 is being addressed, and to report on past, current and likely future developments related to the implementation of studies that might address RPA 52.
Account Type(s):
Expense
Contract Start Date:
12/16/2013
Contract End Date:
12/15/2014
Current Contract Value:
$28,742
Expenditures:
$28,742

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA COR:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Casey Baldwin Colville Confederated Tribes Yes Contract Manager casey.baldwin@colvilletribes.com (509) 421-1799
Randy Friedlander Colville Confederated Tribes No Supervisor randall.friedlander@colvilletribes.com (509) 634-2110
Billy Gunn Colville Confederated Tribes Yes Administrative Contact billy.gunn@colvilletribes.com (509) 422-7740
Peter Lofy Bonneville Power Administration Yes COR ptlofy@bpa.gov (503) 230-4193
Kary Nichols Colville Confederated Tribes No Interested Party kary.nichols@colvilletribes.com (509) 422-4782
Christine Petersen Bonneville Power Administration Yes Interested Party chpetersen@bpa.gov (503) 230-4695
Donald Rose Bonneville Power Administration No Env. Compliance Lead dlrose@bpa.gov (503) 230-3796
Norma Sanchez Colville Confederated Tribes No Administrative Contact norma.sanchez@colvilletribes.com (509) 634-2109
Tom Sargent Colville Confederated Tribes No Interested Party tom.sargent@colvilletribes.com (509) 634-2853
Stephen Smith Stephen H Smith Fisheries Consulting, Inc. Yes Interested Party huntersmith@canby.com (503) 263-1253
Jason Sweet Bonneville Power Administration Yes F&W Approver jcsweet@bpa.gov (503) 230-3349
Bill Towey Colville Confederated Tribes No Technical Contact bill@ucut-nsn.org (509) 838-1057
Kirk Truscott Colville Confederated Tribes Yes Interested Party kirk.truscott@colvilletribes.com (509) 978-8031
Kristi Van Leuven Bonneville Power Administration Yes Contracting Officer kjvleuven@bpa.gov (503) 230-3605
Dan Warren D J Warren and Associates, Inc. Yes Interested Party dan.warren@djwassociates.com (541) 929-4639


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All administrative tasks fulfilled with timely quality products A: 119. Manage and administer the project. 12/14/2014 12/14/2014
Summary of RM&E activities that address RPA 52 B: 122. Participate in FCRPS process (e.g. SRWG) that design and implement studies which could address RPA52 12/15/2014 12/15/2014
Data and analyses summaries related to RPA 52 C: 162. Accumulate and process existing data to assess passage mortality an potential causes 12/14/2014 12/14/2014
Update the Phase 2 study design D: 174. Update the draft Phase 2 study design for evaluating stock specific mortalities 12/14/2014 12/14/2014
Technical and policy briefings and presentations E: 122. Coordinate Study Analysis, Provide Presentations to Regional Fish Managers 12/14/2014
RM&E Report F: 141. RM&E report for calendar year 2014 12/14/2014 12/14/2014

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 162 Analyze/Interpret Data
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Sockeye (O. nerka) - Okanogan River ESU
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Steelhead (O. mykiss) - Snake River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 122 Provide Technical Review and Recommendation
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 119 Manage and administer the project. 11/01/2013
B 122 Participate in FCRPS process (e.g. SRWG) that design and implement studies which could address RPA52 11/01/2013
C 162 Accumulate and process existing data to assess passage mortality an potential causes 11/01/2013
D 174 Update the draft Phase 2 study design for evaluating stock specific mortalities 11/01/2013
E 122 Coordinate Study Analysis, Provide Presentations to Regional Fish Managers 09/01/2012
F 141 RM&E report for calendar year 2014 11/16/2013
G 185 Periodic Status Reports for BPA 11/16/2013
H 132 Document and report status of annual work, document progress towards specific sub-tasks of RPA 52 09/01/2012