Province | Subbasin | % |
---|---|---|
Basinwide | - | 100.00% |
Previous: | Next: |
---|---|
63690: 2008-908-00 EXP FCRPS WATER STUDIES & PASSAGE |
* Expenditures data includes accruals and are based on data through 28-Feb-2025.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
All administrative tasks fulfilled with timely quality products | B: 119. Manage and administer the project | 04/15/2016 | 12/15/2015 | |
Summary of RM&E activities that address RPA 52 | C: 122. Participate in FCRPS planning forums (e.g. SRWG) that design studies which could address RPA 52 | 04/15/2016 | 12/14/2015 | |
Data and analyses summaries related to RPA 52 | D: 162. Accumulate and process existing data to assess causes and locations of mortality below McNary Dam | 04/15/2016 | 12/15/2015 | |
Modified Phase 2 study design | E: 174. Update the draft Phase 2 study design for evaluating stock specific mortalities | 12/15/2015 | 12/15/2015 | |
Technical and policy briefings and presentations | F: 122. Coordinate study analysis, provide presentations to regional fish managers | 04/15/2016 | 12/15/2015 | |
Final annual report for calendar year 2014 | G: 132. Annual Report: (Jan-Dec 2014) | 03/15/2015 | 03/14/2015 | |
Submit BiOp RPA Report in Taurus | H: 202. BiOp RPA Report for CY 2014 | 03/15/2015 | 03/13/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Snake River Fall ESU (Threatened) |
|
Chinook (O. tshawytscha) - Snake River Spring/Summer ESU (Threatened) |
|
Chinook (O. tshawytscha) - Snake River Spring/Summer (not listed) |
|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Chinook (O. tshawytscha) - Upper Columbia River Summer/Fall ESU |
|
Sockeye (O. nerka) - Okanogan River ESU |
|
Sockeye (O. nerka) - Snake River ESU (Endangered) |
|
Steelhead (O. mykiss) - Snake River DPS (Threatened) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 185 | Periodic Status Reports for BPA | 12/16/2014 | ||||||
B | 119 | Manage and administer the project | 12/16/2014 | ||||||
C | 122 | Participate in FCRPS planning forums (e.g. SRWG) that design studies which could address RPA 52 | 12/16/2014 | ||||||
D | 162 | Accumulate and process existing data to assess causes and locations of mortality below McNary Dam | 12/16/2014 | ||||||
E | 174 | Update the draft Phase 2 study design for evaluating stock specific mortalities | 12/16/2014 | ||||||
F | 122 | Coordinate study analysis, provide presentations to regional fish managers | 12/16/2014 | ||||||
G | 132 | Annual Report: (Jan-Dec 2014) | 12/16/2014 | ||||||
H | 202 | BiOp RPA Report for CY 2014 | |||||||
I | 132 | Submit Draft Progress Report for the period (Jan 2015) to (Dec 2015) | 12/16/2014 |