58734: 201000100 EXP LOWER ENTIAT RM 0.8 - 2.3 RESTORATION |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Permit Development | A: 165. Initiate EC permitting processess | 12/31/2014 | 08/11/2014 | |
All administrative tasks fulfilled with timely quality products | B: 119. Contract managment for project construction | 03/13/2015 | 03/13/2015 | |
Stakeholder Coordination | C: 191. Lead coordination efforts for watershed wide restoration | 12/31/2014 | 12/31/2014 | |
Boulder Clusters Keystone to Kiosk - RM 1.1 to RM 2.3 | D: 29. Boulder Clusters Keystone to Kiosk - RM 1.1 to Rm 2.3 | 12/31/2014 | 08/22/2014 | |
High Flow Channel Complexity at RM 1.45 to 1.65 | E: 29. High Flow Channel Complexity RM 1.45 to 1.65 | 12/31/2014 | 09/15/2014 | |
Split Flow Channel Enhancement at RM 6.7 to 6.8 | F: 29. Split Flow Channel Enhancement RM 6.7 to 6.8 | 12/31/2014 | 09/15/2014 | |
Side Channel Connection at RM 0.85 | G: 30. Side Channel Connection at RM 0.85 | 12/31/2014 | 09/15/2014 | |
Alcove Creation at RM 6.73 | H: 30. Alcove creation at RM 6.73 | 12/31/2014 | 09/15/2014 | |
Apex Boulder Cluster at RM 6.77 | I: 29. Apex boulder cluster at RM 6.77 | 12/31/2014 | 08/26/2014 | |
Mid-channel island ELJ RM 6.755 | J: 29. Mid-channel island ELJ RM 6.755 | 12/31/2014 | 09/15/2014 | |
Construction Management Complete | K: 100. Construct Keystone to Kiosk and ENFH Phase II projects | 12/31/2014 | 09/15/2014 | |
RM 0.85 Installation of riparian vegetation | L: 47. RM 0.85 Installation of riparian vegetation | 11/28/2014 | 11/28/2014 | |
Maintain Tyee 3A Structures | M: 186. Maintain Tyee 3A Structures | 03/13/2015 | 03/13/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered) |
|
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Initiate EC permitting processess | 03/14/2014 | ||||||
B | 119 | Contract managment for project construction | 03/14/2014 | ||||||
C | 191 | Lead coordination efforts for watershed wide restoration | 03/14/2014 | ||||||
D | 29 | Boulder Clusters Keystone to Kiosk - RM 1.1 to Rm 2.3 | 05/22/2014 | ||||||
E | 29 | High Flow Channel Complexity RM 1.45 to 1.65 | 05/22/2014 | ||||||
F | 29 | Split Flow Channel Enhancement RM 6.7 to 6.8 | 05/22/2014 | ||||||
G | 30 | Side Channel Connection at RM 0.85 | 05/22/2014 | ||||||
H | 30 | Alcove creation at RM 6.73 | 05/22/2014 | ||||||
I | 29 | Apex boulder cluster at RM 6.77 | 05/22/2014 | ||||||
J | 29 | Mid-channel island ELJ RM 6.755 | 05/22/2014 | ||||||
K | 100 | Construct Keystone to Kiosk and ENFH Phase II projects | 03/14/2014 | ||||||
L | 47 | RM 0.85 Installation of riparian vegetation | 05/22/2014 | ||||||
M | 186 | Maintain Tyee 3A Structures | 05/23/2014 | ||||||
N | 185 | Periodic Status Reports for BPA | 01/01/2014 | ||||||
O | 132 | (no report is required per COTR) | 03/14/2014 |