Province | Subbasin | % |
---|---|---|
Columbia Plateau | Walla Walla | 100.00% |
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Projects identified for out-years | A: 114. Identify and select projects in Walla Walla Basin | 01/31/2015 | 06/30/2014 | |
All project admin activities managed | B: 119. Conduct all management activities | 01/31/2015 | 01/31/2015 | |
Environmental compliance complete | C: 165. Compliance for on-the-ground work | 01/31/2015 | 06/30/2014 | |
Provide technical support through interagency coordination and public forum | D: 122. Provide technical support | 01/31/2015 | 01/31/2015 | |
Fences maintained at full functionality | E: 186. Maintain Fences | 01/31/2015 | 01/31/2015 | |
Attach Final CY2013 Progress Report in Pisces | F: 132. Annual Progress Report (1-1-13) to (12-31-13) | 04/01/2014 | 01/13/2015 | |
Attach Final CY2014 Progress Report in Pisces | G: 132. Annual Progress Report (1-1-14) to (12-31-14) | 01/31/2015 | ||
Upload Completed Lower Walla Walla River Assessment to Pisces | H: 115. Lower Walla Walla Geomorphic Assessment | 01/31/2015 | 01/31/2015 | |
Submit conceptual drawings and/or specifications to BPA | I: 175. Lower Walla Walla Geomorphic Assessment Conceptual Designs | 11/30/2014 | 08/28/2014 | |
Final Kentch Site Assessment & Design uploaded to Pisces | J: 175. Develop final site assessment and restoration plan at Kentch | 05/15/2014 | 05/15/2014 | |
Habitat improved on mainstem South Fork Walla Walla River | K: 29. Habitat restoration at Kentch, South Fork Walla Walla River | 12/31/2014 | 12/31/2014 | |
Maintain riparian vegetation | L: 198. Maintain riparian vegetation | 01/31/2015 | 01/31/2015 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (O. tshawytscha) - Mid-Columbia River Spring ESU |
|
Steelhead (O. mykiss) - Middle Columbia River DPS (Threatened) |
|
Trout, Bull (S. confluentus) (Threatened) |
|
Trout, Rainbow (Oncorhynchus mykiss) |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 114 | Identify and select projects in Walla Walla Basin | 02/01/2014 | ||||||
B | 119 | Conduct all management activities | 02/01/2014 | ||||||
C | 165 | Compliance for on-the-ground work | 02/01/2014 | ||||||
D | 122 | Provide technical support | 02/01/2014 | ||||||
E | 186 | Maintain Fences | 02/01/2014 | ||||||
F | 132 | Annual Progress Report (1-1-13) to (12-31-13) | 02/01/2014 | ||||||
G | 132 | Annual Progress Report (1-1-14) to (12-31-14) | 02/01/2014 | ||||||
H | 115 | Lower Walla Walla Geomorphic Assessment | 02/01/2014 | ||||||
I | 175 | Lower Walla Walla Geomorphic Assessment Conceptual Designs | 02/01/2014 | ||||||
J | 175 | Develop final site assessment and restoration plan at Kentch | 12/16/2013 | ||||||
K | 29 | Habitat restoration at Kentch, South Fork Walla Walla River | 06/16/2014 | ||||||
L | 198 | Maintain riparian vegetation | 06/16/2014 | ||||||
M | 185 | Periodic Status Reports for BPA | 02/01/2014 |