Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 64895: 2007-224-00 CAP IMPLEMENT OKANOGAN SUBBASIN PLAN
Project Number:
Title:
Okanogan Subbasin Habitat Implementation Program (OSHIP)
Stage:
Complete
Area:
Province Subbasin %
Columbia Cascade Okanogan 100.00%
Contract Number:
64895
Contract Title:
2007-224-00 CAP IMPLEMENT OKANOGAN SUBBASIN PLAN
Contract Continuation:
Previous: Next:
61162: 2007-224-00 CAP IMPLEMENT OKANOGAN SUBBASIN PLAN
  • 69226: 2007-224-00 CAP OKANOGAN SUBBASIN HABITAT IMPL
Contract Status:
Closed
Contract Description:
The goal of this project is to implement the Okanogan Sub-Basin Plan.  The Sub-Basin Plan was developed to describe in detail the current state of the Okanogan Basin and then describe what are the limiting factors for anadromous salmonid production and survival.  Implementing the Sub-Basin Plan will require a sequenced set of key habitat restoration and protective actions.  The Okanogan River, Similkameen River and associated tributaries have several factors that limit salmonid production and rearing.  These factors include but are not limited to:  temperature, flow, habitat complexity, barriers, sedimentation and substrate.  We will be addressing limiting factors throughout the Okanogan River Basin, (main-stem and tributary portions)  by implementing a list of stream habitat restoration projects and developing feasibility plans on future projects.  This contract is for implementation of Capital projects, primarily diversion screen installations and upgrades to improve fish passage and a pump upgrade to improve irrigation efficiency.
Account Type(s):
Capital
Contract Start Date:
05/01/2014
Contract End Date:
06/30/2015
Current Contract Value:
$189,633
Expenditures:
$189,633

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
Env. Compliance Lead:
Contract Contractor:
Work Order Task(s):
Contract Type:
Contract (IGC)
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Applicable permits and other environmental clearances received A: 165. Environmental Compliance 06/30/2015 06/30/2015
Submit drawings and/or specifications to BPA D: 175. Johnson Creek barrier removal design 06/30/2015 06/30/2015
All administrative tasks fulfilled with timely quality products I: 119. Manage and Administer Project 06/30/2015 06/30/2015
Aspen Meadows-Test well K: 34. Aspen Meadows-Test well 03/27/2015 06/26/2015
Beaver Creek Bridge L: 184. Beaver Creek Bridge 06/30/2015 04/30/2015
Beaver Creek irrigation ditch revision M: 149. Beaver Creek irrigation ditch revision 06/30/2015

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Chinook (O. tshawytscha) - Upper Columbia River Spring ESU (Endangered)
  • 1 instance of WE 34 Develop Alternative Water Source
Steelhead (O. mykiss) - Upper Columbia River DPS (Threatened)
  • 1 instance of WE 34 Develop Alternative Water Source
  • 1 instance of WE 84 Remove/Install Diversion
  • 1 instance of WE 85 Remove/Breach Fish Passage Barrier
  • 1 instance of WE 184 Install Fish Passage Structure
  • 2 instances of WE 175 Produce Design
  • 1 instance of WE 82 Install Well
  • 2 instances of WE 149 Install Pipeline

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Environmental Compliance 05/01/2014
B 175 Loup Loup Canal and Pump Upgrades 05/01/2014
C 84 Loup Loup Creek Diversion upgrade
D 175 Johnson Creek barrier removal design
E 85 Johnson Creek Gabion removal and Culvert replacement
F 149 Johnson Creek irrigation canal lining
G 82 Johnson Creek POD change
H 185 Periodic Status Reports for BPA 05/01/2014
I 119 Manage and Administer Project 05/01/2014
J 132 Progress reporting will be done under the Expense contract for this project 05/01/2014
K 34 Aspen Meadows-Test well 04/06/2015
L 184 Beaver Creek Bridge 04/30/2015
M 149 Beaver Creek irrigation ditch revision